Scaffold system compatibility: what the approvals document

Scaffold systems are compatible only where an approval says so, component by component. In ScaFix’s catalogue, 11 systems have a DIBt approval listing another catalogue system’s components, quoted here with the page: 7 take Layher Blitz components and 5 Plettac SL 70 components. Each system’s parts are also counted on ScaFix’s example house.

· How the numbers are computed ·

Layher Blitz scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Layher Blitz around the example house, as ScaFix draws it in 3D.

Which scaffold systems are compatible with each other?

Only where an approval says so. In ScaFix’s catalogue, 11 systems have a DIBt approval whose parts tables list components regulated in another catalogue system’s approval: 7 take Layher Blitz components and 5 Plettac SL 70 components. That allows the listed parts in that build only; it never makes two systems interchangeable.

Which approval lists components of which system?

11 approvals in ScaFix’s catalogue list another catalogue system’s components: 7 list Layher Blitz components and 5 Plettac SL 70 components. A cell gives the PDF page where the system’s approval first lists a component «geregelt in» the other system’s approval; «–» means that the approval lists no such component.

Scaffold system compatibility
SystemIts approvalValid toLayher Blitz (Z-8.1-16.2)Plettac SL 70/100 (Z-8.1-29)Layher Allround (Z-8.22-64)ALFIX 70 (Z-8.1-862)ALFIX Modul (Z-8.22-906)ALBERT BLITZFIX 70 (Z-8.1-885)FRAMESCAFF 73 (Z-8.1-924)
ALFIX ALBLITZ 70 SDIBt Z-8.1-86411 January 2028p. 8––p. 3p. 6––
KERO RK 073DIBt Z-8.1-8957 February 2030p. 8––––––
ALBERT BLITZFIX 70DIBt Z-8.1-88514 July 2031p. 9p. 9–––––
ROLLE BLIZZARD S-70DIBt Z-8.1-97428 March 2031p. 8––––––
PERALTA Donnergerüst 70 SDIBt Z-8.1-93620 March 2031p. 10–––––p. 17
Scaffolding Center SC 73DIBt Z-8.1-99120 January 2027p. 7––––––
Layher Allround STAR 70DIBt Z-8.1-9192 November 2027p. 9–p. 9––––
ALFIX UNIFIX 70DIBt Z-8.1-8476 April 2027–p. 11–p. 10p. 10––
ALBERT UNITAC 70DIBt Z-8.1-9793 April 2029–p. 7–––p. 11–
Scaffolding Center SC 70DIBt Z-8.1-99016 March 2031–p. 7–––––
KERO RPL 070DIBt Z-8.1-9753 April 2029–p. 6–––––

How many parts does each system need on the same house as the one it takes components from?

Each system needs its own number of parts on the same house: ScaFix’s example house, 11.4 m × 5.3 m, is scaffolded all round with each system’s catalogue bay lengths and width, and the last column gives the difference against the first system its approval names. The table lists each system’s bay lengths, width and parts on the house.

How many parts does each system need on the same house as the one it takes components from?
SystemTakes components ofBay lengths in ScaFix’s catalogueWidthParts on the houseDifference
ALFIX ALBLITZ 70 SLayher Blitz (263)3.07 m, 2.57 m, 2.07 m, 1.57 m, 1.09 m, 0.73 m0.73 m376+113 (+43%)
KERO RK 073Layher Blitz (263)3.07 m, 2.57 m, 2.07 m, 1.57 m0.73 m360+97 (+37%)
ALBERT BLITZFIX 70Layher Blitz (263)3.07 m, 2.57 m, 2.07 m, 1.57 m0.73 m344+81 (+31%)
ROLLE BLIZZARD S-70Layher Blitz (263)3.07 m, 2.57 m, 2.07 m, 1.57 m, 1.09 m, 0.73 m0.73 m336+73 (+28%)
PERALTA Donnergerüst 70 SLayher Blitz (263)3.07 m, 2.57 m, 2.07 m, 1.57 m, 1.09 m, 0.73 m0.73 m328+65 (+25%)
Scaffolding Center SC 73Layher Blitz (263)3.07 m, 2.57 m, 2.07 m, 1.57 m, 1.09 m, 0.73 m0.73 m328+65 (+25%)
Layher Allround STAR 70Layher Blitz (263)3.07 m, 2.57 m, 2.07 m, 1.57 m, 1.09 m, 0.73 m0.73 m320+57 (+22%)
ALFIX UNIFIX 70Plettac SL 70/100 (316)3 m, 2.5 m, 2 m, 1.5 m0.74 m328+12 (+4%)
ALBERT UNITAC 70Plettac SL 70/100 (316)3 m, 2.5 m, 2 m, 1.5 m0.74 m320+4 (+1%)
Scaffolding Center SC 70Plettac SL 70/100 (316)3 m, 2.5 m, 2 m, 1.5 m0.74 m326+10 (+3%)
KERO RPL 070Plettac SL 70/100 (316)3 m, 2.5 m, 2 m, 1.5 m0.74 m320+4 (+1%)

Calculated with ScaFix, a scaffold planning app for browser and iPhone (115 scaffold systems from 57 manufacturers, checked 10 November 2026).

Which system on the same grid rules out other components?

Solideq RAMSCAFF is a frame system with the 0.73 m × 3.07 m grid of Layher Blitz, and its Swedish type certificate, RISE SC0043-19 (valid to 4 June 2029), says on page 7: «Ställningen får inte byggas med inblandning av komponenter från annan ställning» — the scaffold must not be built with components from another scaffold.

A shared grid is therefore no evidence of compatibility: RAMSCAFF is planned in ScaFix with its own parts only.

How to read the matrix

  • «Geregelt in Z-…» in an approval’s parts table means that the component, made and marked under the other approval, may be used as part of this system.
  • Only the listed components are covered. The build, the ties and the bracing follow the approval of the system you erect.
  • The direction matters: a row says that this system may take the other system’s components, and nothing about the reverse.
  • A system that is not in the matrix is not shown to be incompatible. ScaFix simply holds no statement either way; ask the manufacturer.
  • ScaFix is a planning aid, not structural approval: it plans the scaffold and counts the parts, and a competent person checks the build against the approval.

Questions and answers

Does the same grid make two frame systems compatible?

No. Solideq RAMSCAFF has Layher Blitz’s 0.73 m × 3.07 m grid, and its certificate RISE SC0043-19 (valid to 4 June 2029) still forbids components from other scaffolds (p. 7), so ScaFix plans RAMSCAFF with its own parts only. Compatibility is what an approval states, component by component, and a shared grid is no evidence of it.

Is Layher Allround compatible with other rosette systems?

Only with one system in ScaFix’s catalogue: the approval of Layher Allround STAR 70 (DIBt Z-8.1-919) lists Layher Allround components, from PDF page 9. For other rosette systems ScaFix has no document that states it, which does not prove them incompatible; ask the manufacturer for its approval or proof.

Even then, only the listed components are covered, and the build follows the erected system’s approval.

Can I combine two systems in one ScaFix plan?

Yes, wall by wall. Where two straight sections meet, ScaFix shares one line of standards only when both use the same system, profile and depth; otherwise it keeps both lines of standards, each counted in its own system’s parts, so the parts list never comes out short.

Sources

The full approvals, downloaded from dibt.de and read on 23 October 2026, and Solideq’s RISE certificate. ScaFix is a planning tool, not a structural calculation or approval. Always check the scaffold against the manufacturer's assembly instructions and the rules that apply before you erect it.

  1. dibt.de/pdf_storage/2023/Z-8.1-864(1.8.1-59!17).pdf
  2. dibt.de/pdf_storage/2020/Z-8.1-895(1.8.1-67!19).pdf
  3. dibt.de/pdf_storage/2021/Z-8.1-885(1.8.1-19!21).pdf
  4. dibt.de/pdf_storage/2025/Z-8.1-974(1.8.1-23!19).pdf
  5. dibt.de/pdf_storage/2023/Z-8.1-936(1.8.1-32!23).pdf
  6. dibt.de/pdf_storage/2022/Z-8.1-991(1.8.1-5!21).pdf
  7. dibt.de/pdf_storage/2022/Z-8.1-919(1.8.1-39!22).pdf
  8. dibt.de/pdf_storage/2020/Z-8.1-847(1.8.1-34!20).pdf
  9. dibt.de/pdf_storage/2019/Z-8.1-979(1.8.1-8!18).pdf
  10. dibt.de/pdf_storage/2026/Z-8.1-990(1.8.1-46!25).pdf
  11. dibt.de/pdf_storage/2019/Z-8.1-975(1.8.1-11!18).pdf
  12. solideq.no/media/pjfobtdw/pro_ram_typ.pdf