Skip to content

Scaffold software

Scaffolding software for scaffold design and planning

ScaFix is scaffold software and a scaffold planner for scaffolds on buildings: scaffolding design software in the browser and on iPhone. You get the scaffold in 3D, a complete parts list and a PDF report. Choosing between vendors? The best scaffold software comparison puts the other tools side by side.

ScaFix is best for a system-scaffold layout in 3D and a full parts list from wall sizes or a PDF drawing, in the browser and on iPhone (115 systems from 57 makers; from €9.90 the first month). ScaFix plans to each maker's bay lengths, lifts and tie rules; it does not issue a TG20:21 compliance sheet or an EN 12811-1 design check, which stay with the scaffold designer.

· How the numbers are computed ·

HAKI Universal scaffolding with a stair tower around a 16.5 m building, eight lifts high, in the ScaFix 3D model
HAKI Universal with a stair tower, eight lifts.

What is ScaFix, the scaffold planning software?

ScaFix, made by Ole Emil Frikstad Urstad in Norway, is paid scaffolding software: a native app for iPhone and iPad and a browser app on Android, PC and Mac. From wall dimensions or a PDF drawing, ScaFix lays out a 3D scaffold in any of 115 systems with its full bill of materials; it makes no structural calculation.

The web editor in 24 seconds

Screen recording of the ScaFix web editor, made on 11 October 2026: a facade with a return wall, the scaffold system and wall settings, the 3D preview and the PDF report export. The part counts on screen are that day's; several systems' rules have been updated since, so the app and the calculator on this site can show other totals for the same walls.

ScaFix at a glance

  • 115 scaffold systems from 57 manufacturers
  • Web browser (PC, Mac, Android) and iPhone app, one account
  • Input: wall measurements, a PDF drawing, or a LiDAR scan on iPhone
  • Output: the scaffold in 3D and the complete parts list, with a PDF report
  • Metric and imperial units
  • The app in 10 languages
  • Plans: Basic and Pro, yearly or quarterly, or Pro by the month
  • Not included: structural calculation or approval

What the software does

  • The scaffold in 3D from wall measurements, with gable walls, sloping ground and corners
  • Walls from a PDF drawing, analysed locally in the browser
  • 115 scaffold systems with their own bay lengths and depths
  • A complete parts list and a PDF report with the full material list
  • A parts inventory that shows what is short
  • The scaffold and wall area in every plan, your own logo with Basic
  • Building from the map, quotes, loading order and a tie schedule with Pro

Which kind of scaffold software do you need: design, estimating, hire or inspection?

Choose scaffold software by the job: planning from measurements, which is ScaFix's job, CAD or BIM design, estimating and quoting, hire and stock (ERP), inspection and handover, or a maker's own tool. The tools below are placed by their vendors' own pages (read 25–29 October 2026); a tool can sit in more than one row.

Scaffold software by category, with the tools in each and where ScaFix sits
CategoryWhat it doesTools in this categoryWhere ScaFix sits
Planning from measurementsA system-scaffold layout in 3D and a full parts list from wall sizes or a PDF drawing, in the browser and on iPhoneScaFix (115 systems from 57 makers; from €9.90 the first month)This is ScaFix's job: measurements, PDF or iPhone LiDAR in, 3D model and parts list out
CAD and BIM designScaffold drawings in a CAD or BIM program, often with structural checksLayher LayPLAN CAD (AutoCAD or BricsCAD, export to RSTAB), ScaffPlan Design (SketchUp or Tekla), NTI SCAFFPLANNER (Revit), scaffmax (SketchUp, PERI UP), Avontus Designer (Windows, .dwg and PDF)Not a CAD tool. Pro exports the model as DXF and IFC4 for these programs
Estimating and quotingQuantities, labour and hire costs and the quotation from a 3D modelSMART Estimator (Windows; TG20:21 checks for tube and fitting), Scaffcalc (browser; quotations from the model, FEM in its top package)The full parts list per wall and lift; in Pro a quote from your own price book
Hire, stock and ERPDepots, reservations, dispatch, returns and hire invoicingAvontus Quantify, ScaffPlan Assets, SMART Manager, iRent from Scaffolding SoftwareNone of this. The parts inventory only compares your own stock with a parts list; the list leaves as CSV or Excel
Inspection and handoverScaffold registers, inspections and handover certificates on siteAvontus ScaffoldIQ, SMART Inspector and Handover, ScaffPlan Field OpsNone of this. ScaFix plans before the scaffold goes up
Manufacturer toolsOne brand's parts, often freePERI QuickSolve (free, browser) and Scaffold Estimation Tool (browser, no price stated by PERI), HAKI Lasco (free plan, HAKI only), Layher LayPLAN (30 days free)115 systems from 57 makers in one picker, each with its own bay lengths

Case: one house, three systems

ScaFix's own example house (11.4 m × 5.3 m, gable roof, eaves 4.5 m, ridge 6 m) planned by the engine in three systems a UK or European contractor might have on the yard. Same walls, different parts lists:

The example house in three systems: bays on the long wall, scaffold depth and total pieces
SystemBays on the long wallScaffold depthPieces in the parts list
Layher Allround4 × 3.07 m0.73 m515
PERI UP1 × 0.75 m + 3 × 3 m + 1 × 2.5 m0.75 m605
Plettac SL 70/1001 × 1.5 m + 3 × 3 m + 1 × 2.5 m0.73 m316

Why the totals differ

The difference is not a rounding error: each system has its own bay lengths, lift heights and parts per bay, so the same facade needs different quantities. A tool that plans every job in one generic system gets the lorry wrong for the others.

Read the totals together with the depth: a narrow frame scaffold and a wider modular one do not give the same working platform, so fewer pieces is not automatically the cheaper job. Each system's own page shows its full parts list for the same house, and the public calculator recomputes any single wall in any of the 115 systems, so a contractor can check the system on the yard before the quote goes out.

Who the scaffold drawing and planning software is for

  • Scaffolding contractors and rental yards that price and pick material for house and facade jobs
  • Builders, roofers and painters who put up their own system scaffold and need the parts list
  • Estimators who need bays, lifts, scaffold area and piece counts before the quote
  • Not for: scaffolds that need a structural design, such as large industrial scaffolds; they need an engineer

UK jobs: TG20:21, TG30 and BS EN 12811

In a TG20:21 or TG30 job, ScaFix does the take-off: the 3D layout and the full parts list, per wall, section and lift, for any of the 115 systems. The NASC compliance sheet (TG20:21 for tube and fitting, TG30 for system scaffolds) or, outside those, a design under the Work at Height Regulations 2005 is then produced by a competent person, and you attach the ScaFix plan to it. ScaFix itself issues neither, so you can price, order and load the job while that work is done.

System scaffolds used in the UK, such as Layher Allround, HAKI Universal, SGB Cuplok and Kwikstage, are among the 115 systems, each with the manufacturer's own bay lengths and depths, and the parts list follows that system.

Curved facades are planned with rounded corners in Pro; what that changes on site is in scaffolding round and curved facades.

Stock: ScaFix keeps one parts stock per account, a count per system, part and length, and every parts list shows what is missing against it; Pro exports the shortage list as CSV. It has no depots, reservations, asset register or hire billing, so a hire yard keeps those in its hire system (inventory and ERP).

When another tool fits better: if you want TG20:21 checks and leg or tie loads inside the quote, a UK estimating suite with a compliance module fits better; if hire is your income, start with a hire and stock system; if you need weekly inspection records and handover certificates, use a site-paperwork tool; and if you need inspections, handovers and compliance records per structure for a whole firm, ScaffoldOptix covers that (GBP 4,995 a year for the first 25 people on its pricing page, read 29 Oct 2026), while ScaFix plans the scaffold and counts the parts. The UK software comparison maps each kind of firm to the tools that publish those features.

What scaffold drawing and planning software should do

A checklist for choosing scaffolding design software, with what ScaFix does on each point:

  • Real systems: 115 scaffold systems with the manufacturers' own bay lengths and depths, not a generic grid.
  • Input from what you have: wall dimensions typed in, walls traced from a PDF drawing (Basic, Pro); in Pro also the map with terrain, a 3D drawing or a model file.
  • A 3D model to check: the scaffold drawn bay by bay, with decks, guardrails, toeboards, braces and access.
  • A complete parts list per system, and a parts inventory that shows what you are short of.
  • Documents: a PDF report with the full material list with your logo (Basic, Pro); in Pro also white labeling (your brand instead of ScaFix's), quotes from your price book, loading order and tie schedule.
  • Where you work: in the browser on PC, Mac and Android and in the iPhone app, with one account.

One wall, worked through: from measurements to a parts list

The scaffolding calculator's own example: a straight wall 12.28 m long and 6 m high, planned in Layher Blitz. ScaFix divides the wall into 4 × 3.07 m, decks the lifts at 2.05 m and 4.05 m and gives a parts list of 96 pieces in its groups: 13 frames and standards, 9 decks, 12 guardrails, 8 toeboards, 6 diagonals, 10 ends, 26 wall ties and fittings and 12 base jacks and legs.

Every number comes from the same engine the ScaFix web app uses, at build time, so the page and the web app agree. Change the length by a metre and the bays are recomputed in the system's own lengths rather than scaled; add a second wall at a corner and the corner bays are shared, not counted twice.

How to test scaffold design software before you buy

Whatever tool you shortlist, test it on a job you have already built, so you know the right answer:

  1. Use your own drawing or measurements, not the vendor's demo house.
  2. Pick the system on your yard and check the bay lengths, widths and lift heights against the maker's manual.
  3. Compare the parts list with what actually went on the lorry for that job, group by group.
  4. Check the ties: where does the tool put them, and which document does it cite for the rule?
  5. Open the export in the software you use next (your spreadsheet, ERP or CAD) before you rely on it.
  6. Try it where the plan is made: in the office, on a tablet, or on a phone on site.
  7. Time the whole job, not one wall: measuring, entering or importing the walls, choosing the system, checking corners and gables, and getting the list out in the format the yard uses. A tool that is fast on one straight wall can still be slow on a house with returns and a pitched roof.
  8. Read what the tool does not do. A planning tool that names its limits is easier to trust than one that names none.

What a parts list from scaffold software should contain

A parts list you can load a lorry from names every component by the maker's own name and length, not just «standards» and «ledgers». In ScaFix it is grouped the way the app shows it – standards or frames, ledgers and transoms, decks, guardrails, toe boards, braces, base jacks, ties and access – with the length and count on every row, per wall, per section and per lift, and for the whole project.

In Pro the same list exports as CSV or Excel with fixed columns: group, part, length in metres, count, unit weight and row weight where the catalogue has the part's weight, and the maker's article number where the catalogue has it. The list can also be cut by delivery stage, so the first lorry carries the base and the first lifts. The PDF report carries the list and an estimated total weight for the job.

Scaffold software on a phone and on site

Much scaffold software still runs on Windows desktops or inside a CAD program. ScaFix runs in any current browser with WebGL – on Windows, macOS, Android and ChromeOS – and as its own app for iPhone and iPad on the same account, so the person who measures the job can plan it where they stand.

On an iPhone or iPad with a LiDAR sensor the app can scan the walls; in the browser, walls are typed in or traced from a PDF drawing. One account is signed in on one device at a time; a Pro team gives each colleague their own login, up to 50 extra users per team.

Who signs the design? Software, the competent person and the rules

In Great Britain the Work at Height Regulations 2005 require strength and stability calculations for a scaffold unless a note of calculations covers the arrangement or the scaffold follows a generally recognised standard configuration, and an assembly, use and dismantling plan drawn up by a competent person (Schedule 3, paragraphs 7 and 8).

For tube and fitting scaffolds in the UK, those standard configurations are set out in the NASC's TG20:21 guidance (TG20:21 user guide).

HSE expects a competent person to inspect the scaffold before first use and at least every 7 days (HSE scaffolding guidance). None of that moves into the software. A design tool with a structural check helps the designer; a planning tool such as ScaFix gives the layout and the take-off the plan and the order are built on. Across Europe the performance requirements for working scaffolds are in EN 12811-1; ScaFix's system pages cite the maker's assembly instructions or approval behind each system's rules, or say plainly that none is on file.

From the software's 3D model

Every price in plain words

  • Pro by the month: full Pro for €9.90 the first month, then €39.90 per month, every month until you cancel. Cancel anytime; Pro stays to the end of the month you paid for.
  • Basic: €59.90 per year when paid yearly, or €17.90 per quarter (every 3 months) when paid quarterly.
  • Pro: €199.00 for the first year, then €299.00 per year when paid yearly (new Pro yearly subscribers), or €89.90 per quarter (every 3 months) when paid quarterly.
  • The yearly price is the price of the yearly plan; it is lower than four quarterly payments.

The plans

Basic → Pro. Pro has everything in Basic and adds more.

FeatureBasicPro
Unlimited scaffold projectsIncludedIncluded
3D scaffold from your wall measurements, with extra anglesIncludedIncluded
Walls from a PDF drawingIncludedIncluded
115 scaffold systems with their own bay lengths and depthsIncludedIncluded
Wall sizeAny sizeAny size
Complete parts listIncludedIncluded
Parts list exportPDFPDF, CSV, Excel, DXF, IFC4, PNG, GLB, ZIP
Parts inventory that shows what the parts list is short ofIncludedIncluded
Export and share with colleaguesIncludedIncluded
Your own login on web and iPhone, signed in on one device at a timeIncludedIncluded
Your logo on the toe boards in 3D and in the PDFIncludedIncluded
Scaffold and wall area in m² / ft²IncludedIncluded
White labeling: your logo and company on the PDF report, quotes and the customer link, no ScaFix branding in 3D or in the PDF Not includedIncluded
Edit the PDF report before export: title, company, customer, reference and note Not includedIncluded
Team: add colleagues as extra users, each with their own login (priced per user) Not includedIncluded
Round buildings and silos, rounded corners, hanging scaffolds, decks and podiums, stair towers (the maker's stair kit), towers and mobile towers Not includedIncluded
Build from the map with terrain, from a 3D drawing or from a model file Not includedIncluded
Quotes from your own price book with price templates, packages and discounts, with your logo Not includedIncluded
Loading order, tie schedule and stock coverage Not includedIncluded
A shareable 3D view for the customer Not includedIncluded
Projects, company profile and prices in the cloud, on all your devices Not includedIncluded

What scaffold planning software does not replace

ScaFix plans scaffolds and counts parts. It is not a structural calculation or an approval: loads, anchoring and the manufacturer's assembly instructions are checked by a competent person.

Platforms

Browser
PC, Mac and Android, nothing to install
iPhone and iPad
The ScaFix app on the App Store, one app for both, with LiDAR scanning on devices that have the sensor
Account
One account on web, iPhone and iPad, signed in on one device at a time

Small builders, roofers and painters

Firms whose trade is something else, and who put up their own scaffold to do it, are covered in scaffolding software for small builders and roofers: what to plan before the job, in which systems, and what ScaFix does not do.

Questions and answers

Does ScaFix work on desktop and mobile?

Yes. ScaFix runs in the browser on PC, Mac and Android phones and tablets, with nothing to install, and as an app for iPhone and iPad from the App Store, with LiDAR scanning on devices that have the sensor. One account works everywhere, signed in on one device at a time.

Is there a free version of ScaFix?

No. ScaFix has no free version and no unpaid trial. Full Pro costs €9.90 the first month and then €39.90 a month until you cancel, and a year of Basic costs €59.90 and Pro €299.00. The 3D demo house opens without an account, for viewing only. New Pro yearly subscribers pay €199.00 for the first year, then €299.00 a year.

Does ScaFix export GAEB files or import customers from Excel?

No. ScaFix exports the parts list as a PDF report (Basic and Pro) and, in Pro, as CSV or Excel, with quotes as PDF. There is no GAEB export in any plan and no import of customer data from Excel or CSV (checked 29 October 2026). The only CSV import is for your own stock, in Pro.

What is the difference between Basic and Pro?

Basic gives you this: Wall measurements → 3D scaffold, full parts list and PDF with your logo. Pro has everything in Basic and adds more: Build from the map, quotes with your logo and a tie plan. Or take Pro by the month: full Pro, renewing every month until you cancel.

Can I look at ScaFix without an account?

Yes. You can open the 3D example without an account and look at the model from every side. Your own projects and parts lists need an account with Basic or Pro, or Pro by the month; the same account works in the browser and in the iPhone app.

Does ScaFix work without signal on site?

Only partly, and only in the iPhone app. There, your projects are saved on the phone and sync with your account when the connection is back, so a plan you have open keeps working without signal; importing a PDF drawing still needs a connection.

The browser editor needs a connection: projects are saved to your account as you work. Test it in flight mode before you rely on it.

What is the difference between scaffold design and scaffold estimating software?

Design software draws the scaffold, often in CAD or BIM and sometimes with a structural check. Estimating software turns the design into quantities, labour, hire costs and a quotation. ScaFix sits between them: it plans the scaffold from measurements and writes the parts list, and in Pro a quote from your own price book; it has no structural check.

Can scaffold software check TG20:21 compliance?

Yes, some can for some scaffolds: SMART Scaffolder lists TG20:21 compliance checks for tube and fitting. ScaFix does not check TG20:21 compliance; it plans to each maker's bay lengths, lifts and tie rules and gives the take-off, and the NASC compliance sheet or the design stays with the competent person.

Does ScaFix export to CAD or BIM?

Yes, in Pro: the model as DXF and IFC4, a PDF drawing set, and the parts list as CSV and Excel. ScaFix is not a plug-in for a CAD or BIM program; it runs on its own in the browser and on iPhone.

Which scaffold software runs on a Mac?

Browser tools run on a Mac: ScaFix, Scaffcalc and PERI's tools, and ScaffPilot also has a macOS desktop app. ScaffPlan says its SketchUp and Tekla plug-ins run on Windows only, and Avontus Designer and LayPLAN are Windows programs. ScaFix needs only a current browser with WebGL, and its iPhone app uses the same account.

Which scaffold systems does ScaFix include?

115 systems from 57 manufacturers in one picker: frame, modular (ringlock and wedge), cuplock and tube and coupler, among them Layher Allround and Blitz, PERI UP, HAKI Universal, Plettac SL, Cuplok and Kwikstage. Each has its own bay lengths, depths and lift heights, and the systems page lists them all.

Can ScaFix plan round buildings, hanging scaffolds or towers?

Yes, in Pro: round buildings and silos, rounded corners, hanging scaffolds, material hoists, and mobile and stair towers with the maker's stair kit. These are Pro only; Basic plans facade scaffolds on straight walls with corners and gables. ScaFix gives the layout and the parts list for them, not a structural check.

Is ScaFix an alternative to Avontus Designer or ScaffPlan?

For facade scaffolds planned from measurements, a PDF or a scan, in several brands and on a phone, yes. For drawings in CAD or BIM with structural checks, those tools do what ScaFix does not; ScaFix's DXF and IFC4 export can feed them.

Can I import a PDF drawing?

Yes. Pick the page, set the scale, take the suggested outline or trace the walls, and set their heights; ScaFix builds the scaffold around them from the PDF. The PDF is analysed in your browser and is not uploaded or stored with the project.

Is ScaFix scaffold layout software with a 3D model?

Yes. ScaFix lays out the bays along each wall you enter or trace from a PDF drawing, in the chosen system's own bay lengths, and shows the whole scaffold as a 3D model with the complete parts list beside it.

It runs in the browser and on iPhone. It is a planning tool: it makes no structural check and does not replace the manufacturer's assembly instructions.

Vendor pages behind the category table

Each tool's own product, pricing or requirements page, read 25–29 October 2026.

  1. layher.com/en/products/layplan-suite/overlay_layplan-cad
  2. scaffplan.com
  3. prod.nti-group.com/uk/products/nti-products/nti-scaffplanner
  4. peri.de/produkte/scaffmax-geruestbau-planungssoftware.…
  5. avontus.com/Designer
  6. smartscaffolder.com
  7. scaffcalc.com/en
  8. avontus.com/quantify
  9. scaffoldingsoftware.com/iscaf
  10. avontus.com/scaffoldiq
  11. scaffplan.com/field-ops
  12. peri-usa.com/products/peri-quicksolve.html
  13. peri-usa.com/products/scaffold-estimation-tool.html
  14. haki.com/service-and-support/design-tools/lasco

Sources

The pictures on this page show Layher Blitz, built after the manufacturer's instructions; the rules the app follows come from EN 12811-1 and the national authority. Read 10 November 2026. The documents, not this page, decide how the scaffold is built: ScaFix plans, it does not approve.

  1. dibt.de/pdf_storage/2025/Z-8.1-16.2(1.8.1-49!24).pdf
  2. layher.com/de-de/services/downloads
  3. boutique.afnor.org/en-gb/standard/nf-en-128111/temporary-works-eq…
  4. hse.gov.uk/construction/safetytopics/scaffoldinginfo.htm
  5. osha.gov/laws-regs/regulations/standardnumber/1926/1926…