Skip to content

For contractors

Scaffolding software for small builders, roofers and painters who own their scaffold

ScaFix is scaffold planning software for small builders, roofing contractors, painters and carpenters who put up their own system scaffold: enter the walls, pick the system you own, and ScaFix draws the scaffold in 3D and counts the parts. For a 12 × 6 m wall with Layher Allround it counts 178 parts, in the browser or on iPhone.

ScaFix is best for a system-scaffold layout in 3D and a full parts list from wall sizes or a PDF drawing, in the browser and on iPhone (115 systems from 57 makers).

· How the numbers are computed ·

Jamax scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Jamax around the example house, as ScaFix draws it in 3D.

Is there scaffolding software for a small contractor who owns the scaffold?

Yes. ScaFix plans a facade or house scaffold from the wall measurements for 115 systems from 57 manufacturers, shows it in 3D and gives the parts list: 178 parts for a 12 × 6 m wall with Layher Allround, 96 with Layher Blitz. It needs no CAD program, and it is a planning aid, not a structural calculation.

Which trades is ScaFix for?

For firms whose trade is something else and who put up a scaffold to do it: builders and carpenters, roofers, painters and renderers, siding and cladding contractors, and small scaffolding firms. They own a frame or modular system, know how to erect it, and need to know before the job how much of it the building takes.

What these firms have in common is that nobody in the office draws scaffolds in CAD. The plan is made by the person who will stand on it, often on site, from a tape measure or the customer’s drawing. ScaFix is built for that: the input is walls, not drawings of standards and ledgers.

Larger scaffolding contractors and design offices are served by other kinds of tool; the differences are set out in the scaffold software comparison.

What do you get from planning the scaffold before the job?

A count of your own material against the building. ScaFix splits each wall into the bay lengths of the system you own, sets the lifts under the eaves, and lists every part: frames or standards, ledgers, decks, guardrails, toe boards, braces, base jacks and wall ties. You see what the job takes before the trailer is loaded.

Three practical uses follow from that list:

  • Loading. The list says what goes on the trailer, by part and length.
  • Topping up. If the job takes more decks or guardrails than you own, you know what to hire in, and how much.
  • Pricing. ScaFix Pro turns the list into a quote from your own price book, so the scaffold has its own line in the bid.

The walls come from measurements typed in, from a PDF floor plan traced with the PDF import, or from a LiDAR scan in the iPhone app. Gables, sloping ground and corners are part of the plan.

Close-up of the corner where the long wall and the gable wall meet, with HAKI Universal standards, decks, guardrails and toe boards in the ScaFix 3D model
The corner: the bays of the two walls meet, with deck, guardrail and toe board on each lift.

How many parts does one wall take in the systems small firms own?

ScaFix counts 178 parts for a straight wall 12 m long and 6 m high with Layher Allround, 96 with Layher Blitz, 225 with HAKI Universal and 125 with Jamax. Frame systems need fewer pieces than modular ones, because one frame replaces two standards and their transoms.

One 12 × 6 m wall, counted by ScaFixLayher AllroundLayher BlitzHAKI UniversalJamax
Bays4454
Decked lifts2222
Scaffold area, m²68627067
Parts on the list17896225125

Each wall is planned straight, without corners, in the set-up its ScaFix system page uses; HAKI Universal is planned with a stair tower, the other three with a ladder bay. The numbers are computed by the same engine as the ScaFix web app. Every system and its bay lengths is on the systems page, and more wall sizes are in scaffold quantities by wall size.

Does it work for frame scaffold in feet and inches?

Yes. ScaFix takes walls in feet and inches and its catalogue holds US frame and ringlock systems. For a wall 40 ft long and 20 ft high (12.19 × 6.10 m) with Waco frames it counts 4 bays and 93 parts, with a deck on every lift and one ladder bay.

A painting, siding or roofing contractor with frame scaffold in the yard can check a house wall by wall the same way: the scaffolding calculator in feet gives bays, lifts and area for one wall without an account, and the app adds the itemised list, the corners and the whole building.

What do roofers and painters set differently?

Two settings. For roof work, «Platform to roof» puts the top deck against the roof and scaffolds the gables up to the ridge, and roof edge protection on a pitched roof adds its guardrail parts to the list. For painting, «Bottom decks» adds a deck on the lowest lift so that the plinth is reached from a deck.

Both are worked through on the example pages: scaffolding for roof work and scaffolding for painting. A whole house is in scaffolding for a house, and a four-storey block in scaffolding for a block of flats.

What does ScaFix not do for a small contractor?

It does not design or approve the scaffold. ScaFix checks no loads and makes no TG20 or TG30 compliance sheet; the number of wall ties follows the system’s tie rule in the catalogue, and their positions must be checked against the manufacturer’s assembly instructions. It also keeps no inspection register and runs no hire contracts.

In Great Britain, strength and stability calculations are required unless the scaffold follows a generally recognised standard configuration (Work at Height Regulations 2005, Schedule 3), and the HSE lists what a scaffold contractor or designer should provide, from the type of scaffold to the maximum tie spacing (HSE: Scaffolding). Owning the scaffold does not change that: the firm that erects it carries those duties.

For inspections, handovers and tags, see scaffolding apps for site managers, which sorts the apps by job.

Which devices and plans does it run on?

ScaFix runs in the browser on PC, Mac and Android and as an app on iPhone and iPad, with one account, in metres or in feet and inches. The plans are Basic and Pro; what each includes and what it costs is on the pricing page, and the 3D example opens without an account.

This is a planning aid, not a structural calculation. ScaFix counts the parts of a scaffold in the set-up shown; it checks no loads, no ties and no ground. The manufacturer’s assembly instructions, the national rules and a competent person decide how the scaffold is built, tied and inspected before use.

Frequently asked questions

Which scaffold systems does ScaFix cover?

ScaFix’s catalogue holds 115 systems from 57 manufacturers: frame systems such as Layher Blitz, Plettac SL and Jamax, modular systems such as Layher Allround, HAKI Universal and PERI UP, cuplock and Kwikstage types, and US frames. Each has a page with its bay lengths and depths, and the plan uses those sizes only.

Can I plan a scaffold on my phone on site?

Yes. The iPhone and iPad app and the browser version share one account, so a wall measured on site can be entered on the phone and the plan opened later on a computer. On iPhones with a LiDAR sensor the app can also scan the building. The parts list and the 3D model are the same in both.

Is the ScaFix plan enough to erect the scaffold?

No. It tells you how much material the building takes and shows the layout in 3D. How the scaffold is erected, braced and tied is set by the manufacturer’s assembly instructions and the national rules, and a competent person inspects it before anyone works on it. ScaFix is a planning tool and replaces none of that.

Do roofing contractors get roof edge protection in the parts list?

Yes, on pitched roofs: ScaFix plans roof edge protection with a guardrail 1 m above the roof plane by roof pitch, and adds the parts to the list. Whether that edge protection suits the roof work in question is for the manufacturer’s instructions and the person responsible for the work at height to decide.

Sources

Primary sources used for this article, with the date each was read.