KERO RPL 070 scaffold: bay lengths, depths and parts list

KERO RPL 070 has bay lengths of 1.5–3 m and a depth of 0.74 m in ScaFix. Enter your walls, and ScaFix draws the KERO RPL 070 scaffold in 3D and works out its parts list. Below is our example house with KERO RPL 070. Any other size: Scaffold calculator.

· How the numbers are computed ·

KERO RPL 070 scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
KERO RPL 070 around the example house, as ScaFix draws it in 3D.

How many parts does KERO RPL 070 need for a house?

ScaFix plans KERO RPL 070 with the bay lengths 3 m, 2.5 m, 2 m and 1.5 m and scaffold depth 0.74 m. On ScaFix’s 11.4 m × 5.3 m example house, scaffolded all round, KERO RPL 070 needs 288 parts; Jamax needs 268 on the same house.

KERO RPL 070 in brief

KERO RPL 070 is a frame scaffold from KERO with DIBt approval Z-8.1-975 (valid until 3 April 2029), 0.74 m wide on the plettac SL grid. ScaFix plans it with bays of 3 m, 2.5 m, 2 m and 1.5 m and the approval's tie pattern (Anlage B §B.5). KERO RHU 070 has the same width and bays in ScaFix but its own approval, Z-8.1-940, whose tie rule also ties both standards of every ladder bay in every tie row; KERO RK 073 (Z-8.1-895) is 0.73 m wide on the Blitz grid.

KERO RPL 070 in ScaFix

Manufacturer · System type
KERO · Frame scaffold (facade scaffold)
Variants in the system picker
KERO RPL 070
Bay lengths · Depths
3 m, 2.5 m, 2 m, 1.5 m · 0.74 m
Source of bay lengths and depths
Depth: DIBt Z-8.1-975 (read 23 October 2026); ScaFix has no page reference for the bay lengths yet.
Source of the tie rule
DIBt Z-8.1-975 KERO RPL 070 (bis 03.04.2029) Anlage B §B.5 a–c
How ScaFix plans KERO RPL 070
2 m lifts; ties every 4 m vertically, every 6 m (2 × 3 m) / 5 m (2 × 2.5 m) / 4 m (2 × 2 m) along the wall; diagonals at least one per 5 bays in every lift

Wall-tie spacing along the wall for KERO RPL 070

ScaFix ties KERO RPL 070 every 4 m in height. Along the wall a tie sits on a standard, so the spacing is always a whole number of bays: for a wall built from one bay length, the table shows how many bays lie between two tied standards and the spacing that gives. Rule: DIBt Z-8.1-975 KERO RPL 070 (bis 03.04.2029) Anlage B §B.5 a–c. ScaFix is a planning tool, not a structural approval.

Wall-tie spacing along the wall for each bay length of KERO RPL 070 in ScaFix
Bay lengthBays between tiesTie spacing along the wall
3 m26 m
2.5 m25 m
2 m24 m
1.5 m23 m

Good to know

A separate approved product of KERO, built from parts compatible with plettac SL; it is not a plettac system.

Sources for KERO RPL 070

Tie rule for KERO RPL 070: DIBt Z-8.1-975 KERO RPL 070 (bis 03.04.2029) Anlage B §B.5 a–c. DIBt Z-8.1-975 can be looked up by its number in the DIBt approval database. ScaFix is a planning tool, not a structural approval.

  1. dibt.de/en/service/approval-download/search

Close-ups from the 3D model

The example house with KERO RPL 070

The walls of the example house with KERO RPL 070
WallLengthHeightBays
Wall 1 + 311.4 m4.5 m1 × 1.5 m + 3 × 3 m + 1 × 2.5 m
Wall 2 + 4 (gable)5.3 m6 m1 × 1.5 m + 1 × 3 m + 1 × 2.5 m

The parts list for the example house with KERO RPL 070

The parts list for the example house with KERO RPL 070
PartLengthCount
Frames and standards
Frames2 m40
Frames1 m4
Top-lift guardrail posts16
Decks
Decks without ladder3 m14
Decks without ladder2.5 m8
Decks without ladder1.5 m8
Decks with ladder3 m2
Guardrails
Front guardrails3 m24
Front guardrails2.5 m12
Front guardrails1.5 m12
Toeboards
Toeboards3 m16
Toeboards2.5 m8
Toeboards1.5 m8
Diagonals
Diagonals1.5 m8
Ends
End guardrails8
Wall ties and fittings
Wall ties30
Wall-anchor fittings30
Base jacks and legs
Base jacks / legs40

KERO RPL 070 · Scaffold depth: 0.74 m · Decks at: 2.5 m, 4.5 m · Decks with ladders · Parts in all: 288

KERO RPL 070 compared with similar systems on the same house

The example house with KERO RPL 070 and similar systems
SystemBays on the long wallDepthParts in allAgainst KERO RPL 070
KERO RPL 0701 × 1.5 m + 3 × 3 m + 1 × 2.5 m0.74 m288this page
Jamax4 × 3 m0.68 m268-20 (-7%)
Layher Blitz4 × 3.07 m0.73 m308+20 (+7%)
Plettac SL 70/1001 × 1.5 m + 3 × 3 m + 1 × 2.5 m0.73 m316+28 (+10%)

KERO RPL 070: parts by wall size

Scaffold depth 0.74 m, access: decks with ladders. Each wall is a whole number of 3 m bays, so the scaffold covers it exactly.

Parts by wall size with KERO RPL 070
Wall (length × height)BaysDecked liftsFrames and standardsDecksBase jacks and legsWall ties and fittingsParts in all
6 × 4 m2 × 3 m1626629
12 × 6 m4 × 3 m2158101675
18 × 8 m6 × 3 m328181422136
24 × 10 m8 × 3 m445321840223
30 × 12 m10 × 3 m566502248316

Questions about KERO RPL 070

How many parts does KERO RPL 070 need for a 12 m × 6 m wall?

A 12 m long, 6 m high wall with KERO RPL 070 (4 × 3 m) needs 75 parts according to ScaFix: 15 frames and standards, 8 decks, 10 base jacks and legs and 16 wall ties and fittings, with decks on 2 lifts. A 30 m wall 12 m high needs 316.