Skip to content

Scaffold system

Plettac SL 70/100 scaffold: bay lengths, depths and parts list

Plettac SL 70/100 has bay lengths of 1.5–3 m and a depth of 0.73 m in ScaFix. Enter your walls, and ScaFix draws the Plettac SL 70/100 scaffold in 3D and works out its parts list. A straight wall with its full parts list: Plettac SL (12 × 4 m, 12 × 8 m). Any other size: Scaffold calculator.

· How the numbers are computed ·

Plettac SL 70/100 scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Plettac SL 70/100 around the example house, as ScaFix draws it in 3D.

How many parts does Plettac SL 70/100 need for a house?

ScaFix plans Plettac SL 70/100 with the bay lengths 3 m, 2.5 m, 2 m and 1.5 m and scaffold depth 0.73 m. On ScaFix’s 11.4 m × 5.3 m example house, scaffolded all round, Plettac SL 70/100 needs 316 parts; Jamax needs 376 on the same house.

Scaffold calculator

Result

12 m × 6 m wall, Plettac SL 70/100

Bays
4 (4 × 3 m)
Lifts
3
Decked levels
2 (2.5 m and 4.5 m)
Scaffold area
66.0 m²

Build this wall in 3D

Plettac SL 70/100 in brief

Plettac SL is the steel frame scaffold of ALTRAD plettac assco. ScaFix plans SL 70, at 0.73 m, with the general frame bays 3 m, 2.5 m, 2 m and 1.5 m. Its DIBt approval Z-8.1-29 covers the regular design up to 24 m above ground plus the spindle extension, with bays up to 3.0 m and load class 3; the wider SL 100 (Z-8.1-171) reaches load class 4 at 3.0 m bays, 5 at 2.5 m and 6 at 2.0 m. ScaFix plans the parts; it does not approve the scaffold.

What is Plettac SL 70/100?

Plettac SL 70 is a steel frame scaffold whose SL grid many other makers have adopted, which is why several systems in ScaFix are called ‘compatible with plettac SL’. Vertical frames, decks and guardrails form each facade lift. ScaFix plans SL 70 at 0.73 m wide with bays of 1.5, 2.0, 2.5 and 3.0 m under DIBt approval Z-8.1-29.

On a straight 10 m × 6 m wall the engine gives 85 parts, with 11 wall ties; the SL-compatible systems from other makers have their own pages and their own approvals.

What does the Plettac SL 70/100 documentation warn about?

Approval Z-8.1-29 (§B.5) puts the ties at the nodes, no more than 30 cm off, never offset under tarpaulin. A triangular tie on an end frame needs a horizontal strut or a tube with couplers directly under it, and next to an inner ladder bay the inner standard needs an extra coupling tube.

What bay lengths and depths does Plettac SL 70/100 have?

ScaFix’s catalogue gives Plettac SL 70/100 4 bay lengths (3 m, 2.5 m, 2 m and 1.5 m) and one depth (0.73 m). Horizontally the rule puts a tie every 6 m with 3 m bays, against every 3 m with 1.5 m bays.

Manufacturer · System type
Altrad Plettac · Frame scaffold (facade scaffold)
Variants in the system picker
Plettac SL 70/100, Plettac PD 70/100
Bay lengths · Depths
3 m, 2.5 m, 2 m, 1.5 m · 0.73 m
Source
DIBt approval Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) (dibt.de, PDF)
Source of bay lengths and depths
ScaFix's general set for frame scaffolds, not taken from the manufacturer's tables. Check the bay lengths against the manufacturer's documents.
How ScaFix plans Plettac SL 70/100
2 m lifts; ties every 4 m vertically, every 6 m (2 × 3 m) / 5 m (2 × 2.5 m) / 4 m (2 × 2 m) along the wall; diagonals at least one per 5 bays in every lift

How far apart are Plettac SL 70/100 wall ties?

Plettac SL 70/100 wall ties sit every 4 m in height and every 6 m along the wall with the 3 m bay. Rule: DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18.

Wall-tie spacing along the wall for each bay length of Plettac SL 70/100 in ScaFix
Bay lengthBays between tiesTie spacing along the wall
3 m26 m
2.5 m25 m
2 m24 m
1.5 m23 m

How each system's tie rule was checked, with its source: verification status of all systems.

Sources for Plettac SL 70/100

Tie rule for Plettac SL 70/100: DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18. The approval document for DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030), as the DIBt publishes it. ScaFix is a planning tool, not a structural approval.

Close-ups from the 3D model

The example house with Plettac SL 70/100

The walls of the example house with Plettac SL 70/100
WallLengthHeightBays
Wall 1 + 311.4 m4.5 m1 × 1.5 m + 3 × 3 m + 1 × 2.5 m
Wall 2 + 4 (gable)5.3 m6 m1 × 1.5 m + 1 × 3 m + 1 × 2.5 m

What is on the Plettac SL 70/100 parts list for the example house?

The example house takes 316 parts in Plettac SL 70/100, planned 0.73 m deep with ladder access and decks at 2.5 m and 4.5 m. Most pieces fall in 88 wall ties and fittings, 60 frames and standards and 48 guardrails.

What is on the Plettac SL 70/100 parts list for the example house?
PartLengthCount
Frames and standards
Frames2 m40
Frames1 m4
Top-lift guardrail posts16
Decks
Decks without ladder3 m14
Decks without ladder2.5 m8
Decks without ladder1.5 m8
Decks with ladder3 m2
Guardrails
Front guardrails3 m24
Front guardrails2.5 m12
Front guardrails1.5 m12
Toeboards
Toeboards3 m16
Toeboards2.5 m8
Toeboards1.5 m8
Diagonals
Diagonals1.5 m8
Ends
End guardrails8
Wall ties and fittings
Wall ties40
Wall-anchor fittings40
Right-angle couplers for wall ties8
Base jacks and legs
Base jacks / legs40

Plettac SL 70/100 · Scaffold depth: 0.73 m · Decks at: 2.5 m, 4.5 m · Decks with ladders · Parts in all: 316

Calculated with ScaFix, a scaffold planning app for browser and iPhone (115 scaffold systems from 57 manufacturers, checked 10 November 2026).

How does Plettac SL 70/100 compare with similar systems?

Against similar systems on the same house, Plettac SL 70/100 comes to 316 parts: Jamax at 376 (+60), Layher Blitz at 263 (−53) and Hünnebeck BOSTA 70/100 at 324 (+8). The nearest count is Hünnebeck BOSTA 70/100, 8 parts away (both 0.73 m deep).

The example house with Plettac SL 70/100 and similar systems
SystemBays on the long wallDepthParts in allAgainst Plettac SL 70/100
Plettac SL 70/1001 × 1.5 m + 3 × 3 m + 1 × 2.5 m0.73 m316this page
Jamax4 × 3 m0.68 m376+60 (+19%)
Layher Blitz4 × 3.07 m0.73 m263-53 (-17%)
Hünnebeck BOSTA 70/1001 × 2 m + 3 × 3 m + 1 × 2.5 m0.73 m324+8 (+3%)

Plettac SL 70/100 against Jamax and Layher Blitz, family by family

Against Jamax (376 parts) on the example house, the Plettac SL 70/100 list (316) has 104 fewer system-specific parts, 12 more guardrails and 12 more frames and standards. Against Layher Blitz (263), it has 32 more wall ties and fittings, 16 fewer diagonals and 16 more frames and standards.

The Jamax list has end toeboards (8) and couplers (104), which the Plettac SL 70/100 list does not. The Layher Blitz list has end guardrail frames (top lift, 4), end toeboards (8) and base transoms (2), which the Plettac SL 70/100 list does not.

How many parts does Plettac SL 70/100 need per wall size?

On a single straight wall, Plettac SL 70/100 takes 34 parts at 6 × 4 m and 346 at 30 × 12 m (0.73 m deep). At 12 × 6 m the list has 85 parts with 12 ties; at 30 × 12 m it is 36 ties.

Parts by wall size with Plettac SL 70/100
Wall (length × height)BaysDecked liftsFrames and standardsDecksBase jacks and legsWall ties and fittingsParts in all
6 × 4 m2 × 3 m16261134
12 × 6 m4 × 3 m2158102685
18 × 8 m6 × 3 m328181440154
24 × 10 m8 × 3 m445321868251
30 × 12 m10 × 3 m566502278346

Plettac SL 70/100: technical data in ScaFix

Plettac SL 70/100: technical data in ScaFix
ItemValue in ScaFixDocument
First tie row, at most4.6 mDIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18
V-anchors per tie level1 per started 5 bays per levelDIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18
Tie rows behind a net, at most4 mDIBt Z-8.1-29 Anl. C p. 17; Z-8.1-171 Anl. C S. 11/13 (PDF S. 129/131) «2 Dreieckhalter pro 5 Felder»
Tie rows under a tarpaulin, at most2 mDIBt Z-8.1-29 Anl. C p. 18 (PDF S. 192); Z-8.1-171 Anl. C S. 19 (PDF S. 137) «2 Dreieckhalter pro 5 Felder» in den obersten 3 Ebenen
Anchoring calculated above (top platform)24 mDIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18
Base jack the tie pattern assumes, at most0.5 mDIBt Z-8.1-29 Tab. B.3 (PDF S. 174) *) «w ≤ 50 cm» (Anl. C S. 6, 8, 9, 12, 13, 18), über 20 cm bei 3,00 m mit S. 8

How ScaFix builds Plettac SL 70/100: lifts, bottom rail, ties and access

  • Bottom lift. In the bottom lift of Plettac SL 70/100 ScaFix fits one guardrail ledger per bay at base-jack height on the outer face, also where the lift carries no deck (DIBt Z-8.1-29 p. 18, 169).
  • Wall ties. With roof-edge brackets, every standard is tied on the bracket level and on the level below (DIBt Z-8.1-29 Anlage C S. 36 (PDF S. 210) «In der Konsolebene ist jeder Rahmen zu verankern», bei L = 3,00 m auch die Ebene darunter, S. 9 (PDF S. 183); Z-8.1-171 Anl. C S. 10 (PDF S. 128)).
  • Net and tarpaulin. With a net on Plettac SL 70/100 the tie rows close to 4 m, at every standard (DIBt Z-8.1-29 Anl. C p. 17; Z-8.1-171 Anl. C S. 11/13 (PDF S. 129/131) «2 Dreieckhalter pro 5 Felder»). With a tarpaulin on Plettac SL 70/100 the tie rows close to 2 m, at every standard (DIBt Z-8.1-29 Anl. C p. 18 (PDF S. 192); Z-8.1-171 Anl. C S. 19 (PDF S. 137) «2 Dreieckhalter pro 5 Felder» in den obersten 3 Ebenen).
  • Access. Plettac SL 70/100 is climbed inside the scaffold, through access decks with a built-in ladder (DIBt Z-8.1-29 Alu-Durchstiegstafel L = 1.50 – 3.00 m).
  • Limits. The Plettac SL 70/100 tie pattern assumes a base jack of at most 0.5 m (DIBt Z-8.1-29 Tab. B.3 (PDF S. 174) *) «w ≤ 50 cm» (Anl. C S. 6, 8, 9, 12, 13, 18), über 20 cm bei 3,00 m mit S. 8).

Plettac SL 70/100 on a 12 m × 6 m wall: pieces and estimated weight

Plettac SL 70/100 on a 12 m × 6 m wall: pieces and estimated weight
Part groupPiecesEstimated weight
Frames and standards15231 kg
Decks8186 kg
Guardrails1259 kg
Toeboards846 kg
Diagonals213 kg
Ends416 kg
Wall ties and fittings2636 kg
Base jacks and legs1036 kg
In all85623 kg

Documents behind the Plettac SL 70/100 rules in ScaFix

Documents behind the Plettac SL 70/100 rules in ScaFix
Used forDocument and passage
Ties at roof-edge bracketsDIBt Z-8.1-29 Anlage C S. 36 (PDF S. 210) «In der Konsolebene ist jeder Rahmen zu verankern», bei L = 3,00 m auch die Ebene darunter, S. 9 (PDF S. 183); Z-8.1-171 Anl. C S. 10 (PDF S. 128)
Guardrail in the bottom liftDIBt Z-8.1-29 p. 18, 169
Access decks and laddersDIBt Z-8.1-29 Alu-Durchstiegstafel L = 1.50 – 3.00 m

Compare Plettac SL 70/100

Closest to Plettac SL 70/100 by type and longest bay in ScaFix’s catalogue: PERI UP Easy (same type, longest bay 3 m), Plettac SL 70 Alu (same maker, same type, longest bay 3 m) and Scafom-Rux SUPER 65 (same type, longest bay 3 m).

Pick Plettac SL 70/100 if…

  • you want fewer pieces to handle: Plettac SL 70/100 needs 316 parts on ScaFix’s example house, against a median of 333 for its type.