Scaffold system
Plettac SL 70/100 scaffold: bay lengths, depths and parts list
Plettac SL 70/100 has bay lengths of 1.5–3 m and a depth of 0.73 m in ScaFix. Enter your walls, and ScaFix draws the Plettac SL 70/100 scaffold in 3D and works out its parts list. A straight wall with its full parts list: Plettac SL (12 × 4 m, 12 × 8 m). Any other size: Scaffold calculator.
By Ole Emil Frikstad Urstad · How the numbers are computed ·

How many parts does Plettac SL 70/100 need for a house?
ScaFix plans Plettac SL 70/100 with the bay lengths 3 m, 2.5 m, 2 m and 1.5 m and scaffold depth 0.73 m. On ScaFix’s 11.4 m × 5.3 m example house, scaffolded all round, Plettac SL 70/100 needs 316 parts; Jamax needs 376 on the same house.
Scaffold calculator
Plettac SL 70/100 in brief
Plettac SL is the steel frame scaffold of ALTRAD plettac assco. ScaFix plans SL 70, at 0.73 m, with the general frame bays 3 m, 2.5 m, 2 m and 1.5 m. Its DIBt approval Z-8.1-29 covers the regular design up to 24 m above ground plus the spindle extension, with bays up to 3.0 m and load class 3; the wider SL 100 (Z-8.1-171) reaches load class 4 at 3.0 m bays, 5 at 2.5 m and 6 at 2.0 m. ScaFix plans the parts; it does not approve the scaffold.
What is Plettac SL 70/100?
Plettac SL 70 is a steel frame scaffold whose SL grid many other makers have adopted, which is why several systems in ScaFix are called ‘compatible with plettac SL’. Vertical frames, decks and guardrails form each facade lift. ScaFix plans SL 70 at 0.73 m wide with bays of 1.5, 2.0, 2.5 and 3.0 m under DIBt approval Z-8.1-29.
On a straight 10 m × 6 m wall the engine gives 85 parts, with 11 wall ties; the SL-compatible systems from other makers have their own pages and their own approvals.
What does the Plettac SL 70/100 documentation warn about?
Approval Z-8.1-29 (§B.5) puts the ties at the nodes, no more than 30 cm off, never offset under tarpaulin. A triangular tie on an end frame needs a horizontal strut or a tube with couplers directly under it, and next to an inner ladder bay the inner standard needs an extra coupling tube.
What bay lengths and depths does Plettac SL 70/100 have?
ScaFix’s catalogue gives Plettac SL 70/100 4 bay lengths (3 m, 2.5 m, 2 m and 1.5 m) and one depth (0.73 m). Horizontally the rule puts a tie every 6 m with 3 m bays, against every 3 m with 1.5 m bays.
- Manufacturer · System type
- Altrad Plettac · Frame scaffold (facade scaffold)
- Variants in the system picker
- Plettac SL 70/100, Plettac PD 70/100
- Bay lengths · Depths
- 3 m, 2.5 m, 2 m, 1.5 m · 0.73 m
- Source
- DIBt approval Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) (dibt.de, PDF)
- Source of bay lengths and depths
- ScaFix's general set for frame scaffolds, not taken from the manufacturer's tables. Check the bay lengths against the manufacturer's documents.
- How ScaFix plans Plettac SL 70/100
- 2 m lifts; ties every 4 m vertically, every 6 m (2 × 3 m) / 5 m (2 × 2.5 m) / 4 m (2 × 2 m) along the wall; diagonals at least one per 5 bays in every lift
How far apart are Plettac SL 70/100 wall ties?
Plettac SL 70/100 wall ties sit every 4 m in height and every 6 m along the wall with the 3 m bay. Rule: DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18.
| Bay length | Bays between ties | Tie spacing along the wall |
|---|---|---|
| 3 m | 2 | 6 m |
| 2.5 m | 2 | 5 m |
| 2 m | 2 | 4 m |
| 1.5 m | 2 | 3 m |
How each system's tie rule was checked, with its source: verification status of all systems.
Sources for Plettac SL 70/100
Tie rule for Plettac SL 70/100: DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18. The approval document for DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030), as the DIBt publishes it. ScaFix is a planning tool, not a structural approval.
- DIBt Z-8.1-29 «PLETTAC SL 70» · Deutsches Institut für Bautechnik (DIBt) · Bescheid 05.06.2020 · DE · link checked 10 Nov 2026
- DIBt Z-8.1-171 «Fassadengerüst plettac SL 100» · Deutsches Institut für Bautechnik (DIBt) · Bescheid 11.03.2019 · DE · link checked 10 Nov 2026
Close-ups from the 3D model


The example house with Plettac SL 70/100
| Wall | Length | Height | Bays |
|---|---|---|---|
| Wall 1 + 3 | 11.4 m | 4.5 m | 1 × 1.5 m + 3 × 3 m + 1 × 2.5 m |
| Wall 2 + 4 (gable) | 5.3 m | 6 m | 1 × 1.5 m + 1 × 3 m + 1 × 2.5 m |
What is on the Plettac SL 70/100 parts list for the example house?
The example house takes 316 parts in Plettac SL 70/100, planned 0.73 m deep with ladder access and decks at 2.5 m and 4.5 m. Most pieces fall in 88 wall ties and fittings, 60 frames and standards and 48 guardrails.
| Part | Length | Count |
|---|---|---|
| Frames and standards | ||
| Frames | 2 m | 40 |
| Frames | 1 m | 4 |
| Top-lift guardrail posts | 16 | |
| Decks | ||
| Decks without ladder | 3 m | 14 |
| Decks without ladder | 2.5 m | 8 |
| Decks without ladder | 1.5 m | 8 |
| Decks with ladder | 3 m | 2 |
| Guardrails | ||
| Front guardrails | 3 m | 24 |
| Front guardrails | 2.5 m | 12 |
| Front guardrails | 1.5 m | 12 |
| Toeboards | ||
| Toeboards | 3 m | 16 |
| Toeboards | 2.5 m | 8 |
| Toeboards | 1.5 m | 8 |
| Diagonals | ||
| Diagonals | 1.5 m | 8 |
| Ends | ||
| End guardrails | 8 | |
| Wall ties and fittings | ||
| Wall ties | 40 | |
| Wall-anchor fittings | 40 | |
| Right-angle couplers for wall ties | 8 | |
| Base jacks and legs | ||
| Base jacks / legs | 40 | |
Plettac SL 70/100 · Scaffold depth: 0.73 m · Decks at: 2.5 m, 4.5 m · Decks with ladders · Parts in all: 316
Calculated with ScaFix, a scaffold planning app for browser and iPhone (115 scaffold systems from 57 manufacturers, checked 10 November 2026).
How does Plettac SL 70/100 compare with similar systems?
Against similar systems on the same house, Plettac SL 70/100 comes to 316 parts: Jamax at 376 (+60), Layher Blitz at 263 (−53) and Hünnebeck BOSTA 70/100 at 324 (+8). The nearest count is Hünnebeck BOSTA 70/100, 8 parts away (both 0.73 m deep).
| System | Bays on the long wall | Depth | Parts in all | Against Plettac SL 70/100 |
|---|---|---|---|---|
| Plettac SL 70/100 | 1 × 1.5 m + 3 × 3 m + 1 × 2.5 m | 0.73 m | 316 | this page |
| Jamax | 4 × 3 m | 0.68 m | 376 | +60 (+19%) |
| Layher Blitz | 4 × 3.07 m | 0.73 m | 263 | -53 (-17%) |
| Hünnebeck BOSTA 70/100 | 1 × 2 m + 3 × 3 m + 1 × 2.5 m | 0.73 m | 324 | +8 (+3%) |
Plettac SL 70/100 against Jamax and Layher Blitz, family by family
Against Jamax (376 parts) on the example house, the Plettac SL 70/100 list (316) has 104 fewer system-specific parts, 12 more guardrails and 12 more frames and standards. Against Layher Blitz (263), it has 32 more wall ties and fittings, 16 fewer diagonals and 16 more frames and standards.
The Jamax list has end toeboards (8) and couplers (104), which the Plettac SL 70/100 list does not. The Layher Blitz list has end guardrail frames (top lift, 4), end toeboards (8) and base transoms (2), which the Plettac SL 70/100 list does not.
How many parts does Plettac SL 70/100 need per wall size?
On a single straight wall, Plettac SL 70/100 takes 34 parts at 6 × 4 m and 346 at 30 × 12 m (0.73 m deep). At 12 × 6 m the list has 85 parts with 12 ties; at 30 × 12 m it is 36 ties.
| Wall (length × height) | Bays | Decked lifts | Frames and standards | Decks | Base jacks and legs | Wall ties and fittings | Parts in all |
|---|---|---|---|---|---|---|---|
| 6 × 4 m | 2 × 3 m | 1 | 6 | 2 | 6 | 11 | 34 |
| 12 × 6 m | 4 × 3 m | 2 | 15 | 8 | 10 | 26 | 85 |
| 18 × 8 m | 6 × 3 m | 3 | 28 | 18 | 14 | 40 | 154 |
| 24 × 10 m | 8 × 3 m | 4 | 45 | 32 | 18 | 68 | 251 |
| 30 × 12 m | 10 × 3 m | 5 | 66 | 50 | 22 | 78 | 346 |
Plettac SL 70/100: technical data in ScaFix
| Item | Value in ScaFix | Document |
|---|---|---|
| First tie row, at most | 4.6 m | DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18 |
| V-anchors per tie level | 1 per started 5 bays per level | DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18 |
| Tie rows behind a net, at most | 4 m | DIBt Z-8.1-29 Anl. C p. 17; Z-8.1-171 Anl. C S. 11/13 (PDF S. 129/131) «2 Dreieckhalter pro 5 Felder» |
| Tie rows under a tarpaulin, at most | 2 m | DIBt Z-8.1-29 Anl. C p. 18 (PDF S. 192); Z-8.1-171 Anl. C S. 19 (PDF S. 137) «2 Dreieckhalter pro 5 Felder» in den obersten 3 Ebenen |
| Anchoring calculated above (top platform) | 24 m | DIBt Z-8.1-29 PLETTAC SL 70 (5.6.2020, amended 29.10.2020, 28.5.2025 and 21.8.2026, bis 3.6.2030) Anl. B §B.1 (PDF S. 167), §B.5 a p. 3–4, Tab. B.3 p. 8, Anl. C p. 6–8/17/18 |
| Base jack the tie pattern assumes, at most | 0.5 m | DIBt Z-8.1-29 Tab. B.3 (PDF S. 174) *) «w ≤ 50 cm» (Anl. C S. 6, 8, 9, 12, 13, 18), über 20 cm bei 3,00 m mit S. 8 |
How ScaFix builds Plettac SL 70/100: lifts, bottom rail, ties and access
- Bottom lift. In the bottom lift of Plettac SL 70/100 ScaFix fits one guardrail ledger per bay at base-jack height on the outer face, also where the lift carries no deck (DIBt Z-8.1-29 p. 18, 169).
- Wall ties. With roof-edge brackets, every standard is tied on the bracket level and on the level below (DIBt Z-8.1-29 Anlage C S. 36 (PDF S. 210) «In der Konsolebene ist jeder Rahmen zu verankern», bei L = 3,00 m auch die Ebene darunter, S. 9 (PDF S. 183); Z-8.1-171 Anl. C S. 10 (PDF S. 128)).
- Net and tarpaulin. With a net on Plettac SL 70/100 the tie rows close to 4 m, at every standard (DIBt Z-8.1-29 Anl. C p. 17; Z-8.1-171 Anl. C S. 11/13 (PDF S. 129/131) «2 Dreieckhalter pro 5 Felder»). With a tarpaulin on Plettac SL 70/100 the tie rows close to 2 m, at every standard (DIBt Z-8.1-29 Anl. C p. 18 (PDF S. 192); Z-8.1-171 Anl. C S. 19 (PDF S. 137) «2 Dreieckhalter pro 5 Felder» in den obersten 3 Ebenen).
- Access. Plettac SL 70/100 is climbed inside the scaffold, through access decks with a built-in ladder (DIBt Z-8.1-29 Alu-Durchstiegstafel L = 1.50 – 3.00 m).
- Limits. The Plettac SL 70/100 tie pattern assumes a base jack of at most 0.5 m (DIBt Z-8.1-29 Tab. B.3 (PDF S. 174) *) «w ≤ 50 cm» (Anl. C S. 6, 8, 9, 12, 13, 18), über 20 cm bei 3,00 m mit S. 8).
Plettac SL 70/100 on a 12 m × 6 m wall: pieces and estimated weight
| Part group | Pieces | Estimated weight |
|---|---|---|
| Frames and standards | 15 | 231 kg |
| Decks | 8 | 186 kg |
| Guardrails | 12 | 59 kg |
| Toeboards | 8 | 46 kg |
| Diagonals | 2 | 13 kg |
| Ends | 4 | 16 kg |
| Wall ties and fittings | 26 | 36 kg |
| Base jacks and legs | 10 | 36 kg |
| In all | 85 | 623 kg |
Documents behind the Plettac SL 70/100 rules in ScaFix
| Used for | Document and passage |
|---|---|
| Ties at roof-edge brackets | DIBt Z-8.1-29 Anlage C S. 36 (PDF S. 210) «In der Konsolebene ist jeder Rahmen zu verankern», bei L = 3,00 m auch die Ebene darunter, S. 9 (PDF S. 183); Z-8.1-171 Anl. C S. 10 (PDF S. 128) |
| Guardrail in the bottom lift | DIBt Z-8.1-29 p. 18, 169 |
| Access decks and ladders | DIBt Z-8.1-29 Alu-Durchstiegstafel L = 1.50 – 3.00 m |
Compare Plettac SL 70/100
Closest to Plettac SL 70/100 by type and longest bay in ScaFix’s catalogue: PERI UP Easy (same type, longest bay 3 m), Plettac SL 70 Alu (same maker, same type, longest bay 3 m) and Scafom-Rux SUPER 65 (same type, longest bay 3 m).
Pick Plettac SL 70/100 if…
- you want fewer pieces to handle: Plettac SL 70/100 needs 316 parts on ScaFix’s example house, against a median of 333 for its type.