Regulations
Scaffolding rules in the Czech Republic: Government Regulation 362/2005 and ČSN 73 8101
Czech scaffolding is governed mainly by Government Regulation No. 362/2005 Coll. on work at height, together with Regulation No. 591/2006 Coll. on construction sites and standard ČSN 73 8101. Scaffolds go up to the maker's instructions under a competent person, the top rail sits at least 1.1 m above the deck, and work stops above 11 m/s wind.
See the scaffold for your wall
By Ole Emil Frikstad Urstad · Checked against Government Regulation No. 362/2005 Coll., version in force since 4 Oct 2005 (no amendments), § 3; annex, part I points 2 and 4, IV point 3, V points 2–4, VII points 1–7, IX; Government Regulation No. 591/2006 Coll., version of 1 Nov 2025, annex 1, part III points 2, 3, 5 and 6; annex 5 point 5; annex 6; Act No. 309/2006 Coll., version of 1 Nov 2025, § 14(1) and (9), § 15(1) and (2); ČSN 73 8101:2018 Scaffoldings – Common regulations, correction 1 (2022), catalogue record (annotation, dates) (10 November 2026) · How the numbers are computed ·

Which Czech regulations apply to scaffolding?
Annex part VII of Regulation 362/2005 Coll. requires erection, dismantling and major alteration only to the instructions in the accompanying documentation, by trained workers led by a competent person, and a written handover after an expert inspection. Part I point 4 sets the top rail at 1.1 m and the toe board at 0.15 m (NV 362/2005 Coll., annex).
Before you rely on this guide
This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.
What are the main Czech rules for scaffolding?
Three legal acts and a set of standards cover scaffolds in Czechia. Government Regulation 362/2005 Coll. on work at height has an annex whose part VII deals with temporary structures such as scaffolds. Regulation 591/2006 Coll. covers construction sites, Act 309/2006 Coll. the health and safety coordinator and plan, and ČSN 73 8101 adds technical requirements.
| Act or standard | What it says about scaffolds |
|---|---|
| Government Regulation 362/2005 Coll. | Guardrails (annex, part I point 4), temporary structures (part VII), stopping work in bad weather (part IX) |
| Government Regulation 591/2006 Coll. | Stability and anchoring of work places at height, expert inspections (annex 1, part III), falls over 10 m (annex 5) |
| Act 309/2006 Coll. | Safety coordinator (§ 14), prior notice to the labour inspectorate and the site safety plan (§ 15) |
| ČSN 73 8101 | Basic technical requirements for scaffolds used in the Czech Republic, supplementing ČSN EN 12811-1 |
We read Regulation 362/2005 Coll. on zakonyprolidi.cz today in the version in force since 4 October 2005. The portal lists no amendment, so the original text still applies. The wording below is our English summary of the Czech text; there is no official translation.
Who may erect a scaffold in the Czech Republic?
Only workers who have been trained and whose knowledge and skills have been verified may erect, dismantle or substantially alter a scaffold. The work must follow the erection and dismantling instructions in the accompanying documentation and be led by a competent person, called «odborně způsobilá osoba» in Czech (annex, part VII point 7).
The training must cover the instructions for the scaffold in use, safe working during erection and alteration, protection against falling people and objects, what to do when the weather changes, permissible loads and the other risks of the job. The employer decides the content and frequency of training and how it is tested and recorded, so the regulation names no specific scaffolder's card. The instructions, with any drawings, must be available to everyone who erects, uses or dismantles the scaffold (part VII point 1).

When does a Czech scaffold need its own calculation?
A scaffold needs an individual strength and stability calculation by a competent person when no accompanying documentation exists or when the documentation does not cover the intended configuration. The exception is a scaffold erected in line with a configuration given in a Czech technical standard (annex, part VII point 2).
For more complex structures a competent person also draws up the specific procedure for erection, use and dismantling (part VII point 3). In practice a standard facade scaffold built exactly to the maker's manual works from the manual, while anything outside it, such as extra height, brackets, sheeting the manual does not cover or unusual foundations, needs a scaffold design with calculations.
How is a scaffold handed over for use?
A Czech scaffold may only be used after a proper handover by the competent person responsible for erecting it and acceptance by the person responsible for its use. On the basis of an expert inspection, the person handing over writes a record confirming the scaffold is complete and fully equipped (annex, part VII point 5).
No written handover record is needed for standardised light work scaffolds with a working deck up to 1.5 m, or for mobile work platforms whose load-bearing parts were not dismantled when they were moved. While a scaffold is not ready for use, for example during erection or alteration, access to the unfinished parts must be blocked with barriers and marked with safety signs (part VII point 4).
How often must a scaffold be inspected?
No fixed interval: Czech scaffolds receive regular expert inspections in the manner and at the intervals set by the accompanying documentation. After any extraordinary event that could have affected safety, for example bad weather, an expert inspection must be carried out without delay (Regulation 362/2005, annex, part VII point 6).
Regulation 591/2006 Coll. says the same for every work place at height on a construction site: the contractor arranges expert inspections at the documented intervals and always after a change of position and after events that could affect stability or strength (annex 1, part III point 3).
How high must guardrails and toe boards be?
At least 1.1 m above the deck for the top rail, unless a special regulation says otherwise, and at least 0.15 m for the toe board. Where the deck is more than 2 m above the surroundings, one or more intermediate rails or another infill must close the gap between them (Regulation 362/2005, annex, part I point 4).
Fall protection is required for work places and walkways more than 1.5 m above the surrounding level, and at any height over water or dangerous substances (§ 3(1)). Collective protection such as guardrails, nets and the scaffold itself comes first; harnesses are used when collective protection is impossible or not reasonable (§ 3(2) and (3)). A guardrail may only be interrupted at a ladder or stair access (part I point 2).
How must a scaffold be founded and tied?
A scaffold must stand on ground of sufficient bearing capacity, or on a structure whose capacity is proven by calculation, and its load-bearing parts must be secured against slipping. The whole must form a rigid unit secured against buckling, shifting and overturning (annex, part VII point 4 a) to c)).
Regulation 591/2006 Coll. adds that a work place at height which is not stable on its own must be secured by suitable, safe anchoring (annex 1, part III point 2). Neither regulation gives a number of ties or a tie pattern: those come from the manufacturer's instructions, or from a scaffold design with calculations. Decks must not shift in normal use and must leave no dangerous gaps (point 4 f)), access must be by ladders, stairs, ramps or hoists (point 4 h)), and the load must stay within the capacity stated in the documentation (part IV point 3).
When must work on a scaffold stop because of the weather?
Work at height stops in wind above 11 m/s (Beaufort 6); on mobile scaffolds, suspended platforms, ladders above 5 m and rope access the limit is 8 m/s (Beaufort 5). Storms, rain, snow or icing, visibility under 30 m and temperatures below −10 °C also count as adverse weather (Regulation 362/2005, annex, part IX).
Under Regulation 591/2006 Coll. the contractor stops work as soon as continuing would endanger people because of weather or the condition of a structure; a person appointed by the contractor makes the call and the measures taken are recorded (annex 1, part III points 5 and 6). After strong wind, the extraordinary inspection under part VII point 6 follows.
What applies to mobile scaffold towers?
Mobile scaffolds must be secured against accidental movement during work by suitable devices, such as locked castors (annex, part VII point 4 b)), and work on them stops above 8 m/s wind. The tower standard ČSN EN 1004-1 (2023 edition) covers prefabricated towers up to 12.0 m indoors and 8.0 m outdoors, according to its catalogue record.
Everything else, including the number and position of stabilisers, the load and the highest platform, comes from the manufacturer's instructions for the specific tower (ČSN EN 1004-1 catalogue record).
When are a safety coordinator and a site safety plan required?
A client must appoint a health and safety coordinator in writing when employees of more than one contractor work on the site, apart from the exceptions in § 14(9) of Act 309/2006 Coll. A site safety plan is required, among other cases, when the work carries a risk of falling more than 10 m (Regulation 591/2006, annex 5 point 5).
The client must also send a notice of commencement to the regional labour inspectorate at least 8 days before handing over the site when the work lasts more than 30 working days with more than 20 people on site at once for longer than one day, or exceeds 500 person-days (Act 309/2006 Coll., § 15(1)). Annex 6 of Regulation 591/2006 lists guardrails from the perimeter scaffold among the topics the plan must cover.
How wide must the danger zone below a scaffold be?
At least 1.5 m wide: that is the danger zone for work 3 to 10 m up, growing to 2 m for 10 to 20 m, 2.5 m for 20 to 30 m and a tenth of the building height above 30 m, measured from the foot of a vertical line through the outer edge (annex, part V point 3).
The zone is secured by closing it to traffic, a protective structure, a two-rail barrier at least 1.1 m high or a dedicated watchman; for work within one shift a single rail or barrier of the same height is enough (part V point 2). Where materials are lifted vertically, the width grows by 1 m on every side (part V point 4).
Which Czech standards apply to scaffolds?
Four standards matter most for facade scaffolds in Czechia: ČSN EN 12811-1 for working scaffolds in general, ČSN EN 12810-1 and -2 for prefabricated facade systems, ČSN EN 1004-1 for mobile towers, and the national ČSN 73 8101, which supplements ČSN EN 12811-1 with requirements applied in the Czech Republic. The texts are sold, so we give catalogue data only.
| Standard | Title | Catalogue data |
|---|---|---|
| ČSN 73 8101 | Scaffoldings – Common regulations | in force since 1 Dec 2018, correction 1 since 1 Jun 2022 |
| ČSN EN 12811-1 | Temporary works equipment – Part 1: Scaffolds | published 1 Aug 2004 |
| ČSN EN 12810-1 | Facade scaffolds made of prefabricated components – Part 1 | published 1 Aug 2004 |
| ČSN EN 1004-1 | Mobile access and working towers – Part 1 | published 1 Aug 2023 |
A Czech technical standard is not generally binding (Act 22/1997 Coll., § 4(1)), but Regulation 362/2005 relies on standards: a scaffold built to a configuration in a Czech standard needs no individual calculation.
Who enforces scaffolding rules in the Czech Republic?
The State Labour Inspection Office (SÚIP) and its regional labour inspectorates enforce the rules on construction sites. In its SLIC 2024 campaign sheet, SÚIP calls falls from height the most frequent cause of serious and fatal accidents in construction and names scaffolds, platforms and ladders without proper collective protection among the causes (SÚIP, SLIC 2024).
What ScaFix does and does not do
ScaFix lays out a scaffold from the bay lengths and rules of the chosen system, shows it in 3D and builds a parts list with guardrails, toe boards, braces and ties. It is a planning aid, not a structural calculation or approval: the manufacturer's instructions, trained scaffolders, the written handover and the expert inspections under Regulation 362/2005 always apply. The Czech version of this guide is at Předpisy pro lešení.
Frequently asked questions
Does a Czech scaffolder need a specific licence?
No specific card is named in Regulation 362/2005 Coll. Erection, dismantling and alteration require workers who have been trained and whose knowledge and skills were verified, led by a competent person (annex, part VII point 7). The employer sets the content, frequency and testing of the training and keeps records of it.
At what temperature does scaffold work stop in Czechia?
At temperatures below −10 °C, work at height must be stopped, because Regulation 362/2005 Coll. counts it as adverse weather (annex, part IX d)). The same list includes storms, rain, snow and icing, visibility under 30 m at the work place and wind above 11 m/s, or above 8 m/s on mobile scaffolds.
Is ČSN 73 8101 mandatory for scaffolds?
No, a Czech technical standard is not generally binding (Act 22/1997 Coll., § 4(1)), but ČSN 73 8101 Scaffoldings – Common regulations, in force since 1 December 2018 with correction 1 from 1 June 2022, is the accepted technical rule. Regulation 362/2005 lets a scaffold built to a configuration in a Czech standard skip the individual calculation.
Is a ScaFix parts list an approval of the scaffold?
No. ScaFix is a planning aid, not a structural calculation or approval. Its parts list gives guardrails, toe boards, braces and ties from the bay lengths of the chosen system, but in the Czech Republic the scaffold is always erected to the manufacturer's instructions and Regulation 362/2005, with a written handover and expert inspections.
Sources
Primary sources used for this article, with the date each was read.
- Nařízení vlády č. 362/2005 Sb. o práci ve výškách a nad volnou hloubkou, znění účinné od 4. 10. 2005 (zakonyprolidi.cz) (read 10 November 2026)
- Nařízení vlády č. 591/2006 Sb. o požadavcích na BOZP na staveništích, aktuální znění od 1. 11. 2025 (zakonyprolidi.cz) (read 10 November 2026)
- Zákon č. 309/2006 Sb. o zajištění dalších podmínek BOZP, aktuální znění od 1. 11. 2025 (zakonyprolidi.cz) (read 10 November 2026)
- ČSN 73 8101 Lešení – Společná ustanovení, účinnost 1. 12. 2018, oprava 1 od 1. 6. 2022 (záznam normy, TZB-info) (read 10 November 2026)
- ČSN EN 12811-1 Dočasné stavební konstrukce – Část 1: Pracovní lešení, vydáno 1. 8. 2004 (katalogový záznam) (read 10 November 2026)
- ČSN EN 12810-1 Fasádní dílcová lešení – Část 1: Požadavky na výrobky, vydáno 1. 8. 2004 (katalogový záznam) (read 10 November 2026)
- ČSN EN 1004-1 Pojízdná dílcová věžová lešení – Část 1, vydáno 1. 8. 2023 (katalogový záznam) (read 10 November 2026)
- Zákon č. 22/1997 Sb. o technických požadavcích na výrobky, § 4 odst. 1, znění od 1. 10. 2025 (zakonyprolidi.cz) (read 10 November 2026)
- SÚIP, kampaň SLIC 2024: Pád z výšky ve stavebnictví (pdf) (read 10 November 2026)