What does Slovak law require of a scaffold?

Only a holder of a valid scaffolder card erects and dismantles a scaffold (section 14(1) of Decree 147/2013 Coll.). Its guardrail has two rails, a top rail at least 1 m high, a toe board of at least 0.15 m and gaps of at most 0.47 m (Annex 6, points 3.4 and 3.9). Handover needs a signed record.

Before you rely on this guide

This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.

Which Slovak regulations apply to scaffolding?

Three implementing regulations apply together: Decree No. 147/2013 Coll. on safety in construction work, Government Regulation No. 396/2006 Coll. on construction sites and Government Regulation No. 392/2006 Coll. on work equipment. Above them sits Act No. 124/2006 Coll. on occupational safety and health, which governs the scaffolder card and its training.

RegulationWhat it says about scaffolds
Decree No. 147/2013 Coll., version in force since 1 June 2015Section 14 scaffolder card; Annex 6: guardrails, decks, stability, handover, exclusion zone, weather
Government Regulation No. 396/2006 Coll., version since 1 January 2023Annex 3, Part B, Section II: falls from height (points 5.1, 5.2), scaffolds (points 6.1 to 6.5)
Government Regulation No. 392/2006 Coll.Annex 2, point 5.3: calculations, assembly plan, supervision by a competent person
Act No. 124/2006 Coll., version since 1 July 2025Section 16 and Annex 1a(p): the card for erecting and dismantling scaffolds
Decree No. 356/2007 Coll.Annex 8, point 07.2: content and length of scaffolder training

The last amendment of Decree 147/2013 was Decree No. 100/2015 Coll.; on 10 November 2026 the version history on the Slov-lex portal listed nothing later. The text published in the Collection of Laws is the binding one.

Who may erect and dismantle a scaffold in Slovakia?

Only a person holding a valid scaffolder card («preukaz lešenára») may erect and dismantle a scaffold, under section 14(1) of Decree 147/2013 Coll. Scaffold erection is a designated work activity in Annex 1a(p) of Act 124/2006 Coll., so the card is issued by a body authorised to provide the training, after a course and an examination.

Annex 8 of Decree 356/2007 Coll. sets the course: at least 1 hour of general rules, at least 4 hours of specific requirements, modules by scaffold type (tube-and-coupler at least 3 hours; system, mobile and stand-alone scaffolds at least 2 hours each) and at least 16 hours of practical training. The card names the scaffold types it covers. Refresher training lasts at least 4 hours and its date is entered on the card; the Slovak labour ministry states that card holders must complete it every 5 years. Section 16 of Act 124/2006 Coll. also governs how cards are issued, refreshed and withdrawn.

HAKI Universal scaffolding (2.5 m bays, 1.01 m deep) around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
HAKI Universal (2.5 m bays, 1.01 m deep) around the example house, as ScaFix draws it in 3D.

Does a Slovak scaffold need calculations or an assembly plan?

Yes, unless it is built in a standard configuration covered by the manufacturer's documents. Annex 2, point 5.3.1 of Government Regulation 392/2006 Coll. requires strength and stability calculations whenever none exist for the chosen scaffold or they do not cover the intended changes. A competent person draws up the plan for assembly, use and dismantling (point 5.3.2).

That plan may be the manufacturer's standard plan completed with the details of the particular scaffold. Erection, dismantling and substantial alteration take place under the supervision of a competent person, and the plan must be available to the person in charge and to the workers (point 5.3.6). Government Regulation 396/2006 Coll. adds that every scaffold must be properly designed, erected and maintained so that it is structurally, functionally and operationally safe (Annex 3, Part B, Section II, point 6.1).

When is a scaffold handed over for use?

A scaffold or part of it may be handed over for use only once it is fully complete and equipped, and access to unfinished parts must be prevented (Annex 6, point 4.1 of Decree 147/2013 Coll.). The scaffolder then draws up a handover and acceptance record for the type of scaffold, with the details the decree prescribes.

Under point 4.2 the record names the party handing over and the party accepting, identifies the scaffold, carries the signatures of both responsible persons and the date. Point 4.3 waives the record for standardised or type-designed scaffolds whose working deck is no higher than 1.5 m. While a scaffold is being erected or altered, unfinished parts carry safety signs and are physically fenced off (Government Regulation 392/2006 Coll., Annex 2, point 5.3.5).

Who inspects a scaffold, and when?

A competent person inspects the scaffold before it is accepted for use, at regular intervals, and after alteration, a break in work, exceptional weather or a seismic event. An inspection is also required after any other event that could affect the scaffold's strength or stability, as point 6.3 of Government Regulation 396/2006 Coll. sets out.

The regulation does not fix the length of the regular interval; the contractor sets it, usually in the assembly and use plan or following the manufacturer's instructions.

What guardrails, toe boards and decks are required?

A Slovak scaffold guardrail has two rails, its handrail top at least 1 m above the deck, a toe board at least 0.15 m high and no clear gap larger than 0.47 m. It goes on every open deck edge with a fall risk above 1.5 m (Decree 147/2013 Coll., Annex 6, points 3.4, 3.8 and 3.9).

RequirementValueAnnex 6 point
Fall protectionfrom 1.5 m height1.1
Gap between deck and facadeat most 0.25 m, otherwise an inner guardrail3.6
Clear height of a scaffold liftat least 1.8 m3.5
Pedestrian passage at ground levelat least 2.1 m3.5
Vehicle passage at ground levelat least 4.2 m3.5
Access hatch in a deckat least 0.6 × 0.5 m, accesses not stacked above each other3.10

Government Regulation 396/2006 Coll. puts collective protection first: a guardrail with toe board, handrail and intermediate rail. Personal fall protection is used only where the nature of the work rules collective protection out (points 5.1 and 5.2).

How must a scaffold be tied?

Decree 147/2013 Coll. requires the scaffold's spatial rigidity and stability to be secured, in particular by bracing, tying and propping (Annex 6, point 3.11). It sets no tie pattern or number of ties per square metre; these come from the manufacturer's instructions, a structural calculation or the assembly plan required by Government Regulation 392/2006 Coll.

The same regulation requires the scaffold's bearing parts to be secured against slipping and the supporting surface to have sufficient load-bearing capacity (Annex 2, point 5.3.3). Typical tie patterns and tie forces from manufacturer manuals are covered in scaffold ties and anchoring.

In what weather must work on a scaffold stop?

Exposed work at height stops in wind of 10.8 m/s or more (Beaufort 6), and from 8 m/s (Beaufort 5) on suspended structures, on ladders above 5 m and when using personal fall protection. Storms, heavy rain, snow, icing and visibility under 30 m also stop it (Decree 147/2013 Coll., Annex 6, point 12.1).

The same point adds temperature limits: below −10 °C and above +43 °C. Point 12.2 allows only urgent work to prevent or remove imminent damage, to the necessary extent and after additional safety measures.

How wide is the exclusion zone below the work?

The protective zone around work at height is at least 1.5 m wide for work from 3 m to 10 m, 2 m above 10 m up to 20 m, 2.5 m above 20 m up to 30 m, and one tenth of the building height above 30 m. This is point 7.3 of Annex 6 to Decree 147/2013 Coll.

On slopes over 25° each zone grows by 0.5 m, and where material is lifted with a gin wheel or hoist it grows by 1 m in every direction (points 7.4 and 7.5). The zone is fenced with a two-rail barrier at least 1 m high or protected by a fan or a netted scaffold (point 7.2). Where a footway is narrowed or moved towards the road, a two-rail barrier at least 1 m high separates it from traffic (point 7.7).

What applies to mobile towers?

Mobile scaffolds must be secured against unintended movement, under point 6.5 of Annex 3, Part B, Section II of Government Regulation 396/2006 Coll., and Government Regulation 392/2006 Coll. (Annex 2, point 5.3.3) requires suitable devices to prevent accidental movement during work at height. The product standard is STN EN 1004-1 of October 2021.

According to its record in the ÚNMS SR catalogue, STN EN 1004-1 (identical to EN 1004-1:2020) covers towers made of prefabricated elements up to 12 m indoors and 8 m outdoors. Mobile and stand-alone scaffolds are a separate training module for scaffolders under Decree 356/2007 Coll. The general checks are in mobile tower safety.

Which standards are used in Slovakia?

Slovakia uses the European scaffold standards in their STN versions: STN EN 12810-1 and -2 for facade system scaffolds, STN EN 12811-1 for performance requirements and general design, STN EN 12811-3 for load testing and STN EN 1004-1 for mobile towers. The ÚNMS SR catalogue also lists the national STN 73 8101 Scaffolding. Common regulations as still valid.

StandardEdition
STN EN 12810-1, facade scaffolds made of prefabricated components, product specificationsNovember 2004, identical to EN 12810-1:2003
STN EN 12810-2, particular methods of structural designNovember 2004, identical to EN 12810-2:2003
STN EN 12811-1, scaffolds, performance requirements and general designNovember 2004, identical to EN 12811-1:2003
STN EN 1004-1, mobile access and working towersOctober 2021, identical to EN 1004-1:2020
STN 73 8101, Scaffolding. Common regulationsapproved 1981, in force since 1 March 1983, amendment a of July 1986, text in Czech

Note 31 to Decree 147/2013 Coll. cites STN 73 8101 among examples of standards for protective structures. The standards are sold by ÚNMS SR, so this page states no values from them; EN 12811-1 load and width classes are explained in scaffold load classes.

Who enforces the rules?

Labour inspectorates, directed by the National Labour Inspectorate (Národný inšpektorát práce), enforce occupational safety on scaffolds under Act No. 125/2006 Coll. on labour inspection. Section 16 of Act 124/2006 Coll. also lets a labour inspectorate withdraw a card from a holder who seriously or repeatedly breaches safety rules in their professional work.

A new card can be requested no earlier than one year after the withdrawal decision becomes final. Contact details of the regional inspectorates are on the National Labour Inspectorate website.

What ScaFix does and does not do

ScaFix models the scaffold in 3D from the bay lengths and rules of the chosen system and produces a parts list with guardrails, toe boards, braces and ties. It is a planning aid, not structural approval: the scaffolder card, the manufacturer's instructions, the assembly plan and the handover record still apply.

Frequently asked questions

How often must a Slovak scaffolder refresh their training?

A Slovak scaffolder holding a card must complete refresher training, and the labour ministry states it is due every 5 years. Under Annex 8 of Decree 356/2007 Coll. the scaffolder refresher lasts at least 4 hours, covers changed requirements and current safety knowledge, and its date is written on the card itself.

Is a handover record needed for a low scaffold in Slovakia?

Not always. Annex 6, point 4.3 of Decree 147/2013 Coll. waives the handover and acceptance record for standardised or type-designed scaffolds with a working deck no higher than 1.5 m. For higher scaffolds the scaffolder always draws it up, with both parties, the scaffold's identification, signatures and the date.

Is STN 73 8101 still valid in Slovakia?

Yes. The ÚNMS SR catalogue lists STN 73 8101 Scaffolding. Common regulations as valid: approved in 1981, in force since 1 March 1983, with amendment a of July 1986, and published in Czech. Decree 147/2013 Coll. cites it in note 31 alongside STN EN 12810-1 and STN EN 12810-2.

Does a ScaFix parts list approve a scaffold in Slovakia?

No. A ScaFix parts list is a planning aid that counts guardrails, toe boards, braces and ties from the chosen system's bay lengths. Calculations and the assembly plan under Government Regulation 392/2006 Coll., the scaffolder card and the handover record under Decree 147/2013 Coll. remain mandatory.

Sources