What does Hungarian law require of a scaffold?

A scaffold must be designed, erected and maintained so that it neither collapses nor shifts. Fall protection is a 1 m high guardrail in three rows, spaced at most 0.3 m, with a toe board and a mid rail (Annex 4, point 5.4). An authorised person inspects it before use, at regular intervals and after storms.

Before you rely on this guide

This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.

Which Hungarian laws apply to scaffolding?

Three texts apply together: Act XCIII of 1993 on labour safety (Mvt.), Joint Decree 4/2002 (II. 20.) SzCsM–EüM on the minimum safety requirements of construction sites, and Decree 10/2016 (IV. 5.) NGM on the use of work equipment. Most scaffold detail sits in Annex 4 of the 2002 decree, chapter III, points 5 and 6.

LawWhat it says about scaffolds
Joint Decree 4/2002 (II. 20.) SzCsM–EüM, consolidated text in force since 1 January 2026Annex 4, chapter III: point 5 falls from height, point 6 scaffolds (design, inspection, decks, guardrails, bracing, mobile towers)
Decree 10/2016 (IV. 5.) NGM, text in force since 31 December 2023Sections 59–62: design to a national standard, erection and dismantling plan, responsible person, training, stability
Act XCIII of 1993, text in force since 1 October 2026Section 21 commissioning, section 28(2) working platforms, section 11 Hungarian-language safety standards
Government Decree 320/2014 (XII. 13.)Section 2: who the labour-safety authority is

Section 62 of the 2016 decree points back to the construction decree: mobile towers and scaffolds used in construction follow the construction-site rules and the relevant national standards. We read the consolidated texts in the Hatályos Jogszabályok Gyűjteménye on 10 November 2026; the binding version is the one promulgated in the Magyar Közlöny.

Who may erect a scaffold in Hungary?

A scaffold may be erected by workers trained in the specific knowledge, risks and prevention of scaffold work (Annex 4, point 6.17.6). Under section 60(1) of Decree 10/2016 NGM, erection, dismantling and major alteration happen under the direct control of a responsible person whom the employer appoints in writing for their professional experience.

The training must cover the erection, dismantling or alteration plan of the scaffold in question, safe working methods, measures against falls of people and objects, rules for bad and stormy weather, the permitted loads and every other hazard of the work. The responsible person and the erectors must have the plan and instructions at hand (section 60(4)). Point 6.19.2, in the mobile-tower section, adds that towers are assembled only by trained people following the assembly instructions.

Neither decree names a formal qualification. Scaffolding can be learned as a trade: the training requirements of the carpenter trade (Ács) in the national register of trades list «Zsaluzó, állványozó» (formwork and scaffold erector) as its related partial qualification (IKK training requirements).

Layher Blitz scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Layher Blitz around the example house, as ScaFix draws it in 3D.

Does a scaffold need a design in Hungary?

Yes, as a rule. Point 6.8 requires a scaffold design except for trestles made of standard components, ladder scaffolds up to 20.0 m and metal scaffolds loaded to at most 2000 N/m². Point 6.9 accepts a structural sketch for, among others, such metal scaffolds up to 6 m high and scaffolds built only from standard components.

Section 59 of Decree 10/2016 NGM approaches the same question from the manufacturer's documents: strength and stability calculations are needed when design data for the chosen configuration are missing or do not cover it, unless the scaffold follows the manufacturer's instructions or the rules for standard components. Every scaffold is built, used and dismantled to an erection and dismantling plan drawn up by an appointed person; a standard (type) plan is allowed. The 2002 decree also asks that the plan give step-by-step safety instructions for erection, dismantling and moving (point 6.14.1), that the permitted working load be marked on the scaffold itself (6.10.8), and that the full documentation include a list of every main and auxiliary material (6.12.10).

When must a scaffold be inspected?

An authorised person inspects the scaffold before it is put into use, regularly at set intervals, and after modification, a period out of use, stormy weather, an earthquake or anything else that may have affected its strength or stability (Annex 4, point 6.3). The time and result of each inspection are recorded in writing (point 6.13.1).

Use may start only after a favourable result and with appropriate permission. The inspection covers conformity with the design and the standards, the foundations, joints, bracing and ties, and the guardrails, mid rails, toe boards and access (6.13.2); it is repeated after any alteration, use other than designed, or removal of members such as cross braces (6.13.4). The decree sets no interval for the regular inspections.

Section 21 of the Mvt. requires the employer to order the operation of dangerous work equipment in writing. Scaffolds are not on the list of dangerous equipment in Annex 1/a of Decree 5/1993 MüM, yet point 6.6 of the 2002 decree still requires the safety commissioning of construction scaffolds to follow the decree and the related laws.

What guardrails and toe boards does Hungarian law require?

A scaffold needs at least a toe board, a mid rail and a guardrail (point 5.1). The protection described in point 5.4 is a 1 m high guardrail in three rows with gaps of at most 0.3 m, and point 5.6 makes it mandatory wherever work is done above 2 m. The decree gives no minimum toe-board height.

RequirementValuePoint
Spacing of the posts carrying the railsat most 3.0 m6.16.1
Guardrails on working levels above 2.0 m, walkways, ramps and stairsrequired6.16.2
Temporary stairs1.0 m two-row guardrail with toe board6.18.3.1
Deck edge to building faceat most 30 cm, else an inner guardrail or personal protection6.15.1.7
Mesh size of safety nets and grillesat most 10 × 10 cm5.4

The toe-board height therefore comes from the manufacturer's instructions; we do not quote the MSZ EN 12811-1 value because the standard is a paid text we cannot cite from a readable source.

What load and width must the decks have?

Unless another rule says otherwise, decks must allow safe work at a working load of at least 2000 N/m² on top of stored and moved materials (point 6.15.1.4). Minimum widths are 0.5 m on wooden ladder scaffolds, 0.6 m on tube scaffolds for plastering, 1.0 m for masonry and material storage, and the frame width on frame scaffolds.

The maximum stored material, how it is stored and the storage area must be shown visibly on the scaffold, for example on a sign. Planks are joined only over a support with at least 0.5 m overlap and may never rest on gutters, balcony ledges or lightning conductors (6.15.1.5); decks above each other leave 190 cm clear headroom (6.15.1.8).

How must a scaffold be braced and tied?

A scaffold is braced in two planes at right angles to each other during erection and at every stage of construction (point 6.14.2). Before bracing it against an existing building, the erector must confirm the building can take the expected loads (6.14.4). The decree gives no number or pattern of ties; that comes from the manufacturer or the design.

The detailed scaffold design shows how and where the scaffold is tied to the building (6.12.5). Base plates sit on sole boards or an equivalent load spreader and are protected from water (6.14.5); heavy scaffolds built or kept in winter need foundations down to frost depth (6.14.6). Section 61(1) of the 2016 decree requires the standards to be secured against slipping at their bearing points.

What applies to mobile towers?

A mobile tower must be secured against unintended movement (point 6.5). Its platforms run the full tower width at most 2 m apart, the hatches may not sit above each other, and workers climb inside the tower only, never up the outside (6.19.1). Trained people assemble it to the instructions, and nobody may stay on it while it is moved.

That last rule and the requirement for purpose-made brakes or locks come from section 61(1) of Decree 10/2016 NGM. The product standard is MSZ EN 1004-1:2021, which according to the MSZT catalogue covers towers up to 12 m indoors and 8 m outdoors.

Is there a wind-speed limit for scaffold work in Hungary?

No, the 2002 decree sets no wind speed for scaffold work. It requires an inspection after stormy weather (points 6.3 and 6.13.1) and training in the rules for stormy conditions, and section 56 of Decree 10/2016 NGM allows temporary work at height only when the weather does not endanger the worker's health and safety.

The one wind speed in the decree, 36 km/h, applies to lifting precast elements into place (point 12.5.5), not to scaffolds. Wind limits for a given scaffold therefore come from the manufacturer's instructions and its design.

Which Hungarian standards apply to scaffolds?

The main standards are MSZ EN 12810-1 and -2 for facade scaffolds of prefabricated components, MSZ EN 12811-1 for performance requirements and general design, MSZ EN 1004-1 for mobile towers, and the national MSZ 13020:2019, which covers the erection, use and dismantling of prefabricated metal working scaffolds, including handover between users.

StandardSubjectValid from
MSZ EN 12810-1:2004Facade scaffolds of prefabricated components, product specifications1 July 2004 (Hungarian edition available)
MSZ EN 12810-2:2004Particular methods of structural design1 July 2004
MSZ EN 12811-1:2004Scaffolds, performance requirements and general design1 July 2004
MSZ EN 1004-1:2021Mobile access and working towers1 March 2021
MSZ 13020:2019Erection, use and dismantling of prefabricated metal scaffolds1 December 2019, in Hungarian; amendment 1 from 1 November 2024

MSZ 13020 does not cover mobile towers, timber or tube-and-coupler scaffolds. Section 11 of the Mvt. counts a national standard with labour-safety content published entirely in Hungarian as a labour-safety rule. The standards are paid texts, so we quote no values from them.

Who enforces the rules in Hungary?

The labour-safety authority enforces them. Under section 2 of Government Decree 320/2014 (XII. 13.) that authority is the minister responsible for employment policy together with the Budapest and county government offices (kormányhivatal), which may inspect any workplace in their area regardless of where the employer is registered (section 13(1)).

Inspections are run by the employment-supervision and labour-safety departments of the government offices. Under section 21(3) of the Mvt., the safety pre-check before commissioning is a specialist labour-safety task done by a suitably qualified expert.

What ScaFix does and does not do

ScaFix lays out the scaffold in 3D from the bay lengths and rules of the chosen system and produces a parts list with guardrails, toe boards, braces and wall ties. It is a planning aid, not a structural calculation or an approval: it does not replace the scaffold design, the training, the written appointment of a responsible person or the inspection the Hungarian decrees require.

Frequently asked questions

Is a scaffolder qualification mandatory in Hungary?

No, not under Decrees 4/2002 SzCsM–EüM and 10/2016 NGM as we read them: both require training, and the 2016 decree adds a responsible person appointed in writing for their experience. Scaffolding is still taught as a trade, as the formwork and scaffold erector partial qualification linked to the carpenter trade.

How often must a scaffold be inspected in Hungary?

Point 6.3 of the 2002 decree requires regular inspections at set intervals but gives no interval, so the employer sets it. A Hungarian scaffold is also inspected before first use and after alteration, a long break, stormy weather or an earthquake, and every inspection's time and result is recorded in writing.

How wide may the gap between deck and wall be in Hungary?

At most 30 cm, under point 6.15.1.7 of Annex 4 to Decree 4/2002 SzCsM–EüM. Where the work or the shape of the facade makes that impossible, the inner side of the scaffold also gets a guardrail, or the workers are protected against falling with personal protective equipment instead.