Scaffold regulations: UK and US

The UK rules are in the Work at Height Regulations 2005, with the NASC TG20 guidance for tube-and-fitting scaffolds; the US rules are OSHA 29 CFR 1926 Subpart L. Here are the main requirements with their section numbers.

By Ole Emil Frikstad Urstad · How the numbers are computed ·

Layher Blitz scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Layher Blitz around the example house, as ScaFix draws it in 3D.

What are the main scaffold regulations?

In the UK, scaffolds are erected, altered and dismantled only under the supervision of a competent person by trained people, inspected after assembly and every 7 days where there is a fall of 2 m or more, with a top guard-rail of at least 950 mm and no gap over 470 mm. In the US, a competent person supervises erection and inspects before each shift; fall protection is needed above 10 ft (3.1 m); toprails are 38–45 in; and a scaffold taller than four times its base width must be tied.

United Kingdom

United Kingdom
TopicRequirementSource
CompetenceNobody plans, supervises or does work at height unless competent, or trained under a competent person's supervisionWAHR 2005 reg. 5
ErectionAssembly, dismantling or significant alteration only under a competent person's supervision, by people with specific trainingWAHR 2005 Sch. 3 Part 2
DesignStrength and stability calculations unless a note of calculations exists or the scaffold is a generally recognised standard configuration; TG20 compliance sheets serve as that for tube and fittingWAHR 2005 Sch. 3 Part 2; NASC TG20:21
InspectionAfter assembly, at suitable intervals and after exceptional events; platforms with a 2 m+ fall inspected within the previous 7 days; written report within 24 hoursWAHR 2005 reg. 12, Sch. 7
Guard-railsTop guard-rail at least 950 mm; gap between intermediate rail and other protection at most 470 mm; suitable toe-boardsWAHR 2005 Sch. 2
Mobile towersErected by trained people (advance guard rail or 3T method); inspected after assembly and every 7 days in construction; reduce to max 4 m to moveHSE tower scaffolds

United States (OSHA)

United States (OSHA)
TopicRequirementSource
Capacity and designEach scaffold supports its own weight and at least 4 times the intended load; designed by a qualified person; frame and tube scaffolds over 125 ft by a registered engineer29 CFR 1926.451(a), 1926.452
TiesHeight over 4:1 of the base: restrained at the 4:1 height, then every 20 ft (≤ 3 ft wide) or 26 ft vertically, at each end and every 30 ft horizontally29 CFR 1926.451(c)(1)
Supervision and inspectionErected, moved or dismantled under a competent person; inspected before each shift and after any event that could affect it29 CFR 1926.451(f), (g)
Fall protectionRequired above 10 ft (3.1 m); toprail 38–45 in on scaffolds placed in service after 1 Jan 2000, midrail midway; toeboards at least 3½ in where objects could fall29 CFR 1926.451(g), (h)
TrainingUsers trained by a qualified person; erectors and inspectors trained by a competent person; retraining when needed29 CFR 1926.454
Mobile scaffoldsBraced, casters locked when stationary; riding only on surfaces within 3° of level and at 2:1 or less while moving, among other conditions29 CFR 1926.452(w)

What ScaFix does – and doesn't

  • ScaFix plans the scaffold with each system's own bay lengths and rules (US systems with OSHA tie spacing) and lists every part, guardrails, toe boards, braces and ties included.
  • ScaFix is a planning tool, not a structural design: the manufacturer's instructions, a competent person and the inspections above always apply.

Sources

legislation.gov.uk, eCFR and HSE, read on 23 October 2026; TG20:21 from trade press (NASC's own page could not be opened).

Questions and answers

How often must a scaffold be inspected in the UK?

After assembly, after exceptional events and, for construction platforms with a fall of 2 m or more, within the previous 7 days (Work at Height Regulations 2005 reg. 12).

When does OSHA require a scaffold to be tied?

When its height is more than four times its least base dimension: ties at that height, then every 20 ft or 26 ft vertically and every 30 ft horizontally (29 CFR 1926.451(c)(1)).

Does ScaFix produce a TG20 compliance sheet or a structural design?

No. ScaFix is a planning tool with a parts list; designs and compliance sheets come from the scaffold designer.