Common questions
Safety and responsibility
ScaFix is a planning tool, not a structural calculation or approval. This is what that means in practice: who is responsible for the scaffold, what the notes in the editor and the warning in the PDF report mean, why the ties in the parts list are not a tie plan, and how to use the sources.
Is the scaffold approved once ScaFix has planned it?
No. ScaFix plans and counts. A parts list is not a structural calculation or an erection approval. Follow the manufacturer's assembly instructions and the rules for work at height.
Who is responsible for the scaffold?
Not ScaFix. Responsibility stays with the employer and the competent persons who erect, inspect and use the scaffold, under the rules where the job is done. A qualified person must check the structure, loads, foundation, ties and assembly before use.
What do the notes in the editor mean?
They say what the manufacturer's instructions require for your set-up, or where ScaFix made a choice, with the source. Read them before you use the plan.
What does the warning under the 3D overview in the PDF report mean?
That the 3D view contains fallback geometry or project warnings. Check the set-up in the editor before you use the report.
Is the number of ties in the parts list a tie plan?
No. The number follows the rule named in the note, with its source, for a standard scaffold. The wall, cladding, wind and extras can call for more ties; the tie plan is decided on site. See How to read the wall ties.
Can I trust the sources?
The source is named in the note: usually the manufacturer's assembly instructions or approval, with the page. For some systems ScaFix has no manufacturer rule; the note then says so, and the number follows a regulation, a standard or ScaFix's general grid and must be checked and calculated. Always check against the edition you have; manufacturers update their instructions.
Do the rules of my country apply?
ScaFix uses the rule named in the source for the system, usually the manufacturer's. The requirements of your country come on top; see scaffolding rules by country.
Who checks that the plan is right?
You and whoever is responsible for the scaffold. ScaFix shows what the numbers are based on, so they can be checked.