System comparison
Layher Allround compared with other scaffold systems
Layher Allround (Layher, modular scaffold with rosettes) beside 17 other systems on ScaFix’s example house: the 12 nearest its 515 parts, plus its head-to-head partners.
By Ole Emil Frikstad Urstad · How the numbers are computed ·

How does Layher Allround compare with other scaffold systems?
On ScaFix’s 11.4 m × 5.3 m example house, Layher Allround takes 515 parts at 0.73 m deep. Of the 17 systems listed here, 2 need fewer parts and 15 as many or more; the closest are Kwikstage with 533 and Rusztowanie warszawskie (HIGHER) with 534. Counts use ScaFix’s catalogue sizes: they compare setups, not quality.

Layher Allround and 17 other systems
| System | Parts in all | Against Layher Allround |
|---|---|---|
| Layher Allround | 515 | – |
| Kwikstage | 533 | +18 (+3%) |
| Rusztowanie warszawskie (HIGHER) | 534 | +19 (+4%) |
| Pilosio MP | 537 | +22 (+4%) |
| Condor MULTICOM | 541 | +26 (+5%) |
| DELTA MODUŁ | 541 | +26 (+5%) |
| Safway Systems Scaffold | 541 | +26 (+5%) |
| Tubesca-Comabi M368 | 541 | +26 (+5%) |
| ЛСК-60 (LSK-60) | 541 | +26 (+5%) |
| MJ OPTIMA | 545 | +30 (+6%) |
| Acrow QUICKSTAGE | 549 | +34 (+7%) |
| Plettac Distribution PDM | 549 | +34 (+7%) |
| Yağmur Ringlock | 553 | +38 (+7%) |
| ALFIX Modul | 565 | +50 (+10%) |
| PERI UP | 605 | +90 (+17%) |
| HAKI Universal | 652 | +137 (+27%) |
| ALFIX 70 | 318 | -197 (-38%) |
| Layher Blitz | 308 | -207 (-40%) |
Layher Allround in Layher’s own document
DIBt Z-8.22-64 (23.04.2018): ledgers 0.73–4.35 m (p. 3); standard facade build 0.73 m wide with bays up to 3.07 m (p. 11). ScaFix’s catalogue plans Layher Allround with bays of 3.07 m, 2.57 m and depths of 1.4 m, 1.09 m, 0.73 m.
Head-to-head pages with Layher Allround
- ALFIX 70: 318 parts against 515 for Layher Allround. The largest gap is in ledgers and beams: 120 with Layher Allround, 0 with ALFIX 70.
- Layher Blitz: 308 parts against 515 for Layher Allround. The largest gap is in ledgers and beams: 120 with Layher Allround, 0 with Layher Blitz.
- ALFIX Modul: 565 parts against 515 for Layher Allround. The largest gap is in ledgers and beams: 156 with ALFIX Modul, 120 with Layher Allround.
- PERI UP: 605 parts against 515 for Layher Allround. The largest gap is in ledgers and beams: 156 with PERI UP, 120 with Layher Allround.
- HAKI Universal: 652 parts against 515 for Layher Allround. The largest gap is in system-specific parts: 128 with HAKI Universal, 0 with Layher Allround.
Questions and answers
Which scaffold system comes closest to Layher Allround in parts?
On ScaFix’s example house, Kwikstage with 533 parts and Rusztowanie warszawskie (HIGHER) with 534, against 515 for Layher Allround. The table lists 17 systems, from 308 to 652 parts.
Does ScaFix plan Layher Allround with every size Layher makes?
Not necessarily. ScaFix plans Layher Allround with bays of 3.07 m, 2.57 m and depths of 1.4 m, 1.09 m, 0.73 m; DIBt Z-8.22-64 (23.04.2018) lists ledgers 0.73–4.35 m (p. 3); standard facade build 0.73 m wide with bays up to 3.07 m (p. 11).
Sources
Tie rule for Layher Allround: DIBt Z-8.22-64 (23.04.2018, valid until 02.05.2027) Anl. C p. 2 §C.5 Ausf. B + Anl. D p. 3. The approval document for DIBt Z-8.22-64 (23.04.2018, valid until 02.05.2027), as the DIBt publishes it. ScaFix is a planning tool, not a structural approval.
Try one week – €0.98See the demo house in 3DSee ScaFix
First week €0.98, then €9.98/week. Full Pro. Cancel anytime.