Scaffold system
Cup-lock JGJ 166 (China) scaffold: bay lengths, depths and parts list
Cup-lock JGJ 166 (China) has bay lengths of 1.5 m and 1.2 m and depths of 1.2 m and 0.9 m in ScaFix. Enter your walls, and ScaFix draws the Cup-lock JGJ 166 (China) scaffold in 3D and works out its parts list. Any other size: Scaffold calculator.
By Ole Emil Frikstad Urstad · How the numbers are computed ·

How many parts does Cup-lock JGJ 166 (China) need for a house?
ScaFix plans Cup-lock JGJ 166 (China) with the bay lengths 1.5 m and 1.2 m and scaffold depth 1.2 m and 0.9 m. On ScaFix’s 11.4 m × 5.3 m example house, scaffolded all round, Cup-lock JGJ 166 (China) needs 845 parts; Cuplock needs 675 on the same house.
Scaffold calculator
What is Cup-lock JGJ 166 (China)?
Cup-lock (碗扣式钢管脚手架) is China’s scaffold of standards with cup joints: a type, with no single maker. ScaFix plans the double-row (双排) scaffold with the dimensions of JGJ 166-2016, table 6.2.1: lifts of 1.8 m on a 0.6 m cup module, bays of 1.5 and 1.2 m and widths of 0.9 and 1.2 m.
It suits estimates for double-row facade scaffolds up to the table’s allowable height. On ScaFix’s example house it needs 845 parts. The rows are generic cup-lock parts counted by position, not a Chinese parts list. On the 1.2 m width ScaFix plans 1.2 m bays, as the table does. Each corner and open end takes a diagonal line across the scaffold’s width (§6.2.6-2), which is on the list; the horizontal braces §6.2.8 asks for above 24 m are not on it. China’s disk-lock (盘扣式) and tube and coupler (扣件式) scaffolds have their own pages.
What does the Cup-lock JGJ 166 (China) documentation warn about?
There is no manufacturer rule for this type: every rule is from JGJ 166-2016 and GB 55023-2022. Ties are «two lifts, three bays» (§6.2.9), with corners and open ends tied on every lift. Above a top platform of 32.5 m, and with solid sheeting, the plan says «calculation required». ScaFix braces every third bay at every height.
What bay lengths and depths does Cup-lock JGJ 166 (China) have?
Cup-lock JGJ 166 (China) is planned in ScaFix with 2 bay lengths, 1.5 m and 1.2 m, and 2 depths, 1.2 m and 0.9 m. On the example house the longest wall, 11.4 m, becomes 8 × 1.5 m (0.9 m deep, 1.8 m lifts).
- System type
- Modular scaffold with cup joints (cuplock)
- Variants in the system picker
- Cup-lock JGJ 166 (China)
- Bay lengths · Depths
- 1.5 m, 1.2 m · 1.2 m, 0.9 m
- Source
- JGJ 166-2016 表6.2.1 (named in ScaFix’s catalogue; no checked PDF link yet)
- Source of bay lengths and depths
- JGJ 166-2016 表6.2.1 (PDF p. 45–46) (read 23 October 2026)
- How ScaFix plans Cup-lock JGJ 166 (China)
- 1.8 m lifts; ties every 3.6 m vertically, every 4.5 m (3 × 1.5 m) / 3.6 m (3 × 1.2 m) along the wall (estimate); nodes every 0.6 m; diagonals at least one per 3 bays in every lift
How far apart are Cup-lock JGJ 166 (China) wall ties? (≈, not yet checked)
Cup-lock JGJ 166 (China) wall ties sit every 3.6 m in height and every ≈ 4.5 m along the wall with the 1.5 m bay. Rule: JGJ 166-2016 表6.2.1 (PDF p. 45–46: 二步三跨, 步距 1.8 m, 横距 0.9 / 1.2 m, 纵距 1.5 / 1.2 m, [H] 34–50 m by w0), §6.2.9-2 (PDF p. 48: «水平投影间距不得超过三跨,竖向垂直间距不得超过三步,… 悬臂高度不得超过两步»), §6.2.9-3 (PDF p. 49: 转角处、开口型端部, ≤ 层高且 ≤ 4m), §6.2.9-4, -7 (PDF p. 49: «从底层第一道水平杆处开始设置», «距架体碗扣主节点距离不应大于 300mm»). That is a regulation or standard, not the manufacturer’s manual; check the tie pattern in the manufacturer’s instructions. The lowest Cup-lock JGJ 166 (China) tie row sits no higher than 2.5 m. With the 1.2 m bay the spacing is ≈ 3.6 m. A tie sits on a standard, so along the wall the Cup-lock JGJ 166 (China) spacing is always a whole number of bays. Estimate – no manufacturer rule on file; follow the supplier's manual.
| Bay length | Bays between ties | Tie spacing along the wall |
|---|---|---|
| 1.5 m | 3 | ≈ 4.5 m |
| 1.2 m | 3 | ≈ 3.6 m |
How each system's tie rule was checked, with its source: verification status of all systems.
Good to know
China's cup-lock scaffold (碗扣式钢管脚手架), a type with no single maker. ScaFix has no manufacturer rule for it: every rule is from JGJ 166-2016 and the mandatory code GB 55023-2022. Above a top platform of 32.5 m (the table's lowest allowable height, 34 m, less 1.5 m) and with solid sheeting the plan says calculation required.
The part rows are generic cup-lock parts counted by position.
Sources for Cup-lock JGJ 166 (China)
Tie rule for Cup-lock JGJ 166 (China): JGJ 166-2016 表6.2.1 (PDF p. 45–46: 二步三跨, 步距 1.8 m, 横距 0.9 / 1.2 m, 纵距 1.5 / 1.2 m, [H] 34–50 m by w0), §6.2.9-2 (PDF p. 48: «水平投影间距不得超过三跨,竖向垂直间距不得超过三步,… 悬臂高度不得超过两步»), §6.2.9-3 (PDF p. 49: 转角处、开口型端部, ≤ 层高且 ≤ 4m), §6.2.9-4, -7 (PDF p. 49: «从底层第一道水平杆处开始设置», «距架体碗扣主节点距离不应大于 300mm»). ScaFix is a planning tool, not a structural approval. ScaFix plans each scaffold system from the documents that system's page names (the manufacturer's manual or approval, where one is on file); the rules come from EN 12811-1 and the national authority.
- 建筑施工碗扣式钢管脚手架安全技术规范 JGJ 166-2016 · 中华人民共和国住房和城乡建设部 (中国建筑工业出版社) · JGJ 166-2016 (备案号 J 823-2016) · ZH (not published online)
Close-ups from the 3D model


The example house with Cup-lock JGJ 166 (China)
| Wall | Length | Height | Bays |
|---|---|---|---|
| Wall 1 + 3 | 11.4 m | 4.5 m | 8 × 1.5 m |
| Wall 2 + 4 (gable) | 5.3 m | 6 m | 4 × 1.5 m |
What is on the Cup-lock JGJ 166 (China) parts list for the example house?
For the example house, Cup-lock JGJ 166 (China) needs 845 parts at 0.9 m deep, with decks at 2.4 m, 4.2 m and 6 m and ladder access. By count, 242 ledgers and beams, 180 frames and standards and 152 guardrails lead the list.
| Part | Length | Count |
|---|---|---|
| Frames and standards | ||
| Standards | 1.8 m | 124 |
| Standards | 1 m | 56 |
| Ledgers and beams | ||
| Ledgers | 1.5 m | 152 |
| Transoms | 90 | |
| Decks | ||
| Decks without ladder | 1.5 m | 49 |
| Decks with ladder | 1.5 m | 4 |
| Guardrails | ||
| Front guardrails | 1.5 m | 152 |
| Toeboards | ||
| Toeboards | 1.5 m | 52 |
| Diagonals | ||
| Diagonals | 1.5 m | 26 |
| Diagonals | 0.9 m | 8 |
| Ends | ||
| End guardrails | 20 | |
| Wall ties and fittings · estimate – no manufacturer rule on file; follow the supplier's manual | ||
| Wall ties | ≈28 (estimate) | |
| Wall-anchor fittings | ≈28 (estimate) | |
| Base jacks and legs | ||
| Base jacks / legs | 56 | |
Cup-lock JGJ 166 (China) · Scaffold depth: 0.9 m · Decks at: 2.4 m, 4.2 m, 6 m · Decks with ladders · Parts in all: 845
Calculated with ScaFix, a scaffold planning app for browser and iPhone (115 scaffold systems from 57 manufacturers, checked 10 November 2026).
How does Cup-lock JGJ 166 (China) compare with similar systems?
Against similar systems on the same house, Cup-lock JGJ 166 (China) comes to 845 parts: Cuplock with 675 (−170), SGB CUPLOK with 769 (−76) and StepUp Cuplock with 573 (−272). SGB CUPLOK comes closest, 76 parts apart at 1.3 m deep (Cup-lock JGJ 166 (China): 0.9 m).
| System | Bays on the long wall | Depth | Parts in all | Against Cup-lock JGJ 166 (China) |
|---|---|---|---|---|
| Cup-lock JGJ 166 (China) | 8 × 1.5 m | 0.9 m | 845 | this page |
| Cuplock | 1 × 1.25 m + 2 × 3 m + 3 × 1.8 m | 1.3 m | 675 | -170 (-20%) |
| SGB CUPLOK | 1 × 1.25 m + 2 × 3 m + 3 × 1.8 m | 1.3 m | 769 | -76 (-9%) |
| StepUp Cuplock | 1 × 0.91 m + 3 × 3.05 m + 1 × 2.44 m | 1.22 m | 573 | -272 (-32%) |
Cup-lock JGJ 166 (China) against Cuplock and SGB CUPLOK, family by family
Against Cuplock (675 parts) on the example house, the Cup-lock JGJ 166 (China) list (845) has 68 more ledgers and beams, 56 fewer wall ties and fittings and 48 more frames and standards. Against SGB CUPLOK (769), it has 104 fewer wall ties and fittings, 68 more ledgers and beams and 48 more frames and standards.
The Cuplock list has right-angle couplers for wall ties (56), which the Cup-lock JGJ 166 (China) list does not. The SGB CUPLOK list has right-angle couplers for wall ties (80), which the Cup-lock JGJ 166 (China) list does not.
How many parts does Cup-lock JGJ 166 (China) need per wall size?
For one straight wall, ScaFix plans Cup-lock JGJ 166 (China) with 86 parts at 3 × 4 m and 750 parts at 15 × 12 m, at 0.9 m depth. A 6 × 6 m wall comes to 193 parts including 8 ties (estimated); at 15 × 12 m it is 24 ties.
| Wall (length × height) | Bays | Decked lifts | Frames and standards | Decks | Base jacks and legs | Wall ties and fittings | Parts in all |
|---|---|---|---|---|---|---|---|
| 3 × 4 m | 2 × 1.5 m | 2 | 18 | 5 | 6 | 8 | 86 |
| 6 × 6 m | 4 × 1.5 m | 3 | 40 | 13 | 10 | 16 | 193 |
| 9 × 8 m | 6 × 1.5 m | 4 | 70 | 25 | 14 | 22 | 338 |
| 12 × 10 m | 8 × 1.5 m | 5 | 108 | 41 | 18 | 32 | 525 |
| 15 × 12 m | 10 × 1.5 m | 6 | 154 | 61 | 22 | 48 | 750 |
Cup-lock JGJ 166 (China): technical data in ScaFix
| Item | Value in ScaFix | Document |
|---|---|---|
| Make-up frame heights | 0.6 m | ScaFix catalogue |
| Node pitch on the standard | 0.6 m | ScaFix catalogue |
| First tie row, at most | 2.5 m | ScaFix setting (no clause) |
| Anchoring calculated above (top platform) | 32.5 m | ScaFix value from JGJ 166-2016 表6.2.1 (lowest [H], 34 m) |
| Base jack the tie pattern assumes, at most | 0.5 m | GB 55023-2022 §4.4.15 «当插入的立杆钢管直径为48.3mm及以上时,伸出长度不应大于500mm»; JGJ 166-2016 prints no base-jack limit for the façade scaffold — its §6.3.3 says of the same jack «伸出立杆的长度不宜大于 300mm»: keep the jack within 300 mm where you can |
How ScaFix builds Cup-lock JGJ 166 (China): lifts, bottom rail, ties and access
- Net and tarpaulin. With a tarpaulin on Cup-lock JGJ 166 (China) the manufacturer requires a calculation (JGJ 166-2016 表6.2.1 covers scaffolds closed with dense mesh (外挂密目安全网封闭)).
- Limits. The Cup-lock JGJ 166 (China) tie pattern assumes a base jack of at most 0.5 m (GB 55023-2022 §4.4.15 «当插入的立杆钢管直径为48.3mm及以上时,伸出长度不应大于500mm»; JGJ 166-2016 prints no base-jack limit for the façade scaffold — its §6.3.3 says of the same jack «伸出立杆的长度不宜大于 300mm»: keep the jack within 300 mm where you can).
- Notices in the editor. JGJ 166-2016 table 6.2.1 gives allowable heights of 34 to 50 m by wind pressure. The app does not know the wind pressure and takes the lowest value (34 m at 0.6 kN/m²), less the 1.5 m the top standards reach above the working level (§6.2.5): above a top platform of 32.5 m the scaffold must be designed. §6.2.2: the erected height should not exceed 50 m; above 50 m, build the scaffold in sections or with equivalent measures. JGJ 166-2016 §6.2.6: the outer face is braced with the system's diagonals (竖向斜撑杆) at least every 5th bay below 24 m and every 3rd bay from 24 m, from the bottom to the top. The app counts a diagonal every 3rd bay at every height (the stricter value: more diagonals than the clause asks below 24 m). §6.2.6-2: every corner and each open end also takes a diagonal line across the scaffold's width, zig-zag from the bottom to the top; the app bills one transverse diagonal per lift at each open end and at each corner it knows. From 24 m §6.2.8 also asks for horizontal zig-zag braces (水平斜撑杆) at every tie level in the top 24 m; they are not on the parts list. JGJ 166-2016 §6.1.5-4: two guardrails at the cup joints 0.6 m and 1.2 m above the deck and a toe board at least 180 mm high on the inside of the outer standards; §6.2.5: the top standards should reach 1.5 m above the working level. The app draws the rails at 1.0 m and 0.5 m and a 1.0 m top lift: fix the rails at the cup joints and let the top standards reach 1.5 m. The parts on this list are the generic cup-lock parts, counted by position: ScaFix has no Chinese parts list for 碗扣式. The top standards are listed as 1.0 m on a 0.6 m cup module, the diagonals are one row per bay length, and the boards per width are the app's default. The list is not an order list: check every part against the supplier's own list.
Cup-lock JGJ 166 (China) on a 12 m × 6 m wall: pieces and estimated weight
| Part group | Pieces | Estimated weight |
|---|---|---|
| Frames and standards | 72 | 567 kg |
| Ledgers and beams | 100 | 544 kg |
| Decks | 25 | 295 kg |
| Guardrails | 64 | 419 kg |
| Toeboards | 24 | 68 kg |
| Diagonals | 18 | 134 kg |
| Ends | 6 | 24 kg |
| Wall ties and fittings | 20 | 28 kg |
| Base jacks and legs | 18 | 65 kg |
| In all | 347 | 2144 kg |
What is different about Cup-lock JGJ 166 (China) compared with Cuplock
- Bay lengths: Cup-lock JGJ 166 (China) 1.5 m and 1.2 m; Cuplock 3 m, 2.5 m, 1.8 m, 1.3 m and 1.25 m.
- Wall ties: Cup-lock JGJ 166 (China) every 3.6 m vertically, every 4.5 m (3 × 1.5 m) / 3.6 m (3 × 1.2 m) along the wall (estimate); Cuplock every 4 m vertically, every 3 m (1 × 3 m) / 2.5 m (1 × 2.5 m) / 1.8 m (1 × 1.8 m) along the wall (general default).
Documents behind the Cup-lock JGJ 166 (China) rules in ScaFix
| Used for | Document and passage |
|---|---|
| Wall-tie rule | JGJ 166-2016 表6.2.1 (PDF p. 45–46: 二步三跨, 步距 1.8 m, 横距 0.9 / 1.2 m, 纵距 1.5 / 1.2 m, [H] 34–50 m by w0), §6.2.9-2 (PDF p. 48: «水平投影间距不得超过三跨,竖向垂直间距不得超过三步,… 悬臂高度不得超过两步»), §6.2.9-3 (PDF p. 49: 转角处、开口型端部, ≤ 层高且 ≤ 4m), §6.2.9-4, -7 (PDF p. 49: «从底层第一道水平杆处开始设置», «距架体碗扣主节点距离不应大于 300mm») |
| Ties under a tarpaulin | JGJ 166-2016 表6.2.1 covers scaffolds closed with dense mesh (外挂密目安全网封闭) |
Compare Cup-lock JGJ 166 (China)
Closest to Cup-lock JGJ 166 (China) by type and longest bay in ScaFix’s catalogue: Kwikstage (Modular scaffold with wedge connections, longest bay 3.05 m), Cuplock (same type, longest bay 3 m) and SGB CUPLOK (same type, longest bay 3 m).
Pick Cup-lock JGJ 166 (China) if…
- you build in lifts of 1.8 m: that is this system’s lift height in ScaFix, against 2 m for most systems.
Other scaffolds for sites in Japan, China and Korea
ScaFix has a page of its own, with bay lengths, widths and the parts list, for these scaffolds used on sites in Japan, China and Korea: beside this one, the Japanese frame scaffold (枠組足場), the Japanese wedge scaffold, B and A type (くさび緊結式足場), China’s tube-and-coupler scaffold to JGJ 130-2011 (扣件式钢管脚手架), the Chinese disk-lock scaffold, Type B and the Korean system scaffold to KCS 21 60 10 (시스템비계). Each page names the standard or source its set-up was taken from.