Scaffold system
Tube & coupler JGJ 130 (China) scaffold: bay lengths, depths and parts list
Tube & coupler JGJ 130 (China) has bay lengths of 1.5 m and 1.2 m and depths of 1.3 m and 1.05 m in ScaFix. Enter your walls, and ScaFix draws the Tube & coupler JGJ 130 (China) scaffold in 3D and works out its parts list. Any other size: Scaffold calculator.
By Ole Emil Frikstad Urstad · How the numbers are computed ·

How many parts does Tube & coupler JGJ 130 (China) need for a house?
ScaFix plans Tube & coupler JGJ 130 (China) with the bay lengths 1.5 m and 1.2 m and scaffold depth 1.3 m and 1.05 m. On ScaFix’s 11.4 m × 5.3 m example house, scaffolded all round, Tube & coupler JGJ 130 (China) needs 1436 parts; HAKI Universal needs 652 on the same house.
Scaffold calculator
What is Tube & coupler JGJ 130 (China)?
Tube and coupler (扣件式钢管脚手架) is China’s scaffold of steel tubes joined with couplers (扣件): a type, with no single maker. ScaFix plans the double-row (双排) scaffold with the standard dimensions of JGJ 130-2011, table 6.1.1-1: lifts (步距) of 1.80 m, bays (立杆纵距) of 1.5 and 1.2 m and widths (立杆横距) of 1.05 and 1.30 m.
It suits estimates for double-row facade scaffolds up to the table’s allowable height. On ScaFix’s example house it needs 1436 parts. The rows count members by position (standards, ledgers, transoms, brace members), not tubes cut to length, so they are not an order list for tube stock. China’s disk-lock scaffold (盘扣式) has its own page, Disk-lock Type B.
What does the Tube & coupler JGJ 130 (China) documentation warn about?
There is no manufacturer rule for this type: every rule is from the Chinese standards. Ties follow JGJ 130-2011 table 6.4.2 and §6.4.3 as «two lifts, three bays» (二步三跨), within 300 mm of a node, and corners and open ends are tied on every lift (GB 55023-2022 §4.4.6).
Above a top platform of 28.8 m (ScaFix’s threshold: the table’s lower allowable height, 30 m, less the 1.2 m top rail) the scaffold must be designed, and solid sheeting is outside the table, so the plan says «calculation required» in both cases. From 24 m ScaFix counts transverse braces (横向斜撑) at corners and every 6 bays on every scaffold (§6.6.4), because it plans wall by wall and cannot see whether the scaffold is closed.
What bay lengths and depths does Tube & coupler JGJ 130 (China) have?
For Tube & coupler JGJ 130 (China), ScaFix offers bays of 1.5 m and 1.2 m and depths of 1.3 m and 1.05 m. ScaFix splits the example house’s 11.4 m wall into 1 × 1.2 m + 8 × 1.5 m, 1.05 m deep, with lifts of 1.8 m.
- System type
- Tube and coupler scaffold
- Variants in the system picker
- Tube & coupler JGJ 130 (China)
- Bay lengths · Depths
- 1.5 m, 1.2 m · 1.3 m, 1.05 m
- Source
- JGJ 130-2011 表6.1.1-1 (named in ScaFix’s catalogue; no checked PDF link yet)
- Source of bay lengths and depths
- JGJ 130-2011 表6.1.1-1 (p. 27) (read 23 October 2026)
- How ScaFix plans Tube & coupler JGJ 130 (China)
- 1.8 m lifts; ties every 3.6 m vertically, every 4.5 m (3 × 1.5 m) / 3.6 m (3 × 1.2 m) along the wall (estimate); diagonals in every bay of every lift
How far apart are Tube & coupler JGJ 130 (China) wall ties? (≈, not yet checked)
Tube & coupler JGJ 130 (China) wall ties sit every 3.6 m in height and every ≈ 4.5 m along the wall with the 1.5 m bay. Rule: JGJ 130-2011 表6.1.1-1 (p. 27, PDF p. 36: 二步三跨, lb 1.05 / 1.30 m, h 1.80 m, [H] 32 / 30 m, w0 = 0.4 kN/m²), 表6.4.2 (PDF p. 41: 竖向 ≤ 3h, 水平 ≤ 3la, ≤ 40 m²), §6.4.3 (PDF p. 41–42: «偏离主节点的距离不应大于 300mm», «从底层第一步纵向水平杆处开始设置»), §6.4.4 (PDF p. 42: 开口型两端, ≤ 层高且 ≤ 4m). That is a regulation or standard, not the manufacturer’s manual; check the tie pattern in the manufacturer’s instructions. The lowest Tube & coupler JGJ 130 (China) tie row sits no higher than 2.5 m. With the 1.2 m bay the spacing is ≈ 3.6 m. A tie sits on a standard, so along the wall the Tube & coupler JGJ 130 (China) spacing is always a whole number of bays. Estimate – no manufacturer rule on file; follow the supplier's manual.
| Bay length | Bays between ties | Tie spacing along the wall |
|---|---|---|
| 1.5 m | 3 | ≈ 4.5 m |
| 1.2 m | 3 | ≈ 3.6 m |
How each system's tie rule was checked, with its source: verification status of all systems.
Good to know
China's tube and coupler scaffold (扣件式钢管脚手架), a type with no single maker. ScaFix has no manufacturer rule for it: every rule is from JGJ 130-2011 and the mandatory code GB 55023-2022. Above the table's allowable height (a top platform of 28.8 m) and with solid sheeting the plan says calculation required. For the disk-lock type (盘扣式) see Disk-lock Type B.
Sources for Tube & coupler JGJ 130 (China)
Tie rule for Tube & coupler JGJ 130 (China): JGJ 130-2011 表6.1.1-1 (p. 27, PDF p. 36: 二步三跨, lb 1.05 / 1.30 m, h 1.80 m, [H] 32 / 30 m, w0 = 0.4 kN/m²), 表6.4.2 (PDF p. 41: 竖向 ≤ 3h, 水平 ≤ 3la, ≤ 40 m²), §6.4.3 (PDF p. 41–42: «偏离主节点的距离不应大于 300mm», «从底层第一步纵向水平杆处开始设置»), §6.4.4 (PDF p. 42: 开口型两端, ≤ 层高且 ≤ 4m). ScaFix is a planning tool, not a structural approval.
- 建筑施工扣件式钢管脚手架安全技术规范 JGJ 130-2011 · 中华人民共和国住房和城乡建设部 (上海市住房和城乡建设管理委员会) · JGJ 130-2011 · ZH · link checked 11 Nov 2026
Close-ups from the 3D model


The example house with Tube & coupler JGJ 130 (China)
| Wall | Length | Height | Bays |
|---|---|---|---|
| Wall 1 + 3 | 11.4 m | 4.5 m | 1 × 1.2 m + 8 × 1.5 m |
| Wall 2 + 4 (gable) | 5.3 m | 6 m | 4 × 1.5 m |
What is on the Tube & coupler JGJ 130 (China) parts list for the example house?
ScaFix counts 1436 parts of Tube & coupler JGJ 130 (China) for the example house, planned 1.05 m deep with ladder access and decks at 2.4 m, 4.2 m and 6 m. The largest groups are system-specific parts (520), ledgers and beams (260) and frames and standards (192).
| Part | Length | Count |
|---|---|---|
| Frames and standards | ||
| Standards | 1.8 m | 132 |
| Standards | 1 m | 60 |
| Ledgers and beams | ||
| Ledgers | 1.5 m | 152 |
| Ledgers | 1.2 m | 12 |
| Transoms | 96 | |
| Decks | ||
| Decks without ladder | 1.5 m | 48 |
| Decks without ladder | 1.2 m | 4 |
| Decks with ladder | 1.5 m | 4 |
| Guardrails | ||
| Front guardrails | 1.5 m | 152 |
| Front guardrails | 1.2 m | 12 |
| Toeboards | ||
| Toeboards | 1.5 m | 52 |
| Toeboards | 1.2 m | 4 |
| Diagonals | ||
| Diagonals | 1.5 m | 52 |
| Diagonals | 1.2 m | 4 |
| Ends | ||
| End guardrails | 16 | |
| Wall ties and fittings · estimate – no manufacturer rule on file; follow the supplier's manual | ||
| Wall ties | ≈28 (estimate) | |
| Wall-anchor fittings | ≈28 (estimate) | |
| Base jacks and legs | ||
| Base jacks / legs | 60 | |
| System-specific parts | ||
| Couplers | 520 | |
Tube & coupler JGJ 130 (China) · Scaffold depth: 1.05 m · Decks at: 2.4 m, 4.2 m, 6 m · Decks with ladders · Parts in all: 1436
Calculated with ScaFix, a scaffold planning app for browser and iPhone (115 scaffold systems from 57 manufacturers, checked 10 November 2026).
How does Tube & coupler JGJ 130 (China) compare with similar systems?
Against similar systems on the same house, Tube & coupler JGJ 130 (China) comes to 1436 parts: HAKI Universal (652, −784), Layher Allround (515, −921) and PERI UP (605, −831). HAKI Universal comes closest, 784 parts apart; it is planned 1.01 m deep, Tube & coupler JGJ 130 (China) 1.05 m deep.
| System | Bays on the long wall | Depth | Parts in all | Against Tube & coupler JGJ 130 (China) |
|---|---|---|---|---|
| Tube & coupler JGJ 130 (China) | 1 × 1.2 m + 8 × 1.5 m | 1.05 m | 1436 | this page |
| HAKI Universal | 5 × 2.5 m | 1.01 m | 652 | -784 (-55%) |
| Layher Allround | 4 × 3.07 m | 0.73 m | 515 | -921 (-64%) |
| PERI UP | 1 × 0.75 m + 3 × 3 m + 1 × 2.5 m | 0.75 m | 605 | -831 (-58%) |
Tube & coupler JGJ 130 (China) against HAKI Universal and Layher Allround, family by family
Against HAKI Universal (652 parts) on the example house, the Tube & coupler JGJ 130 (China) list (1,436) has 392 more system-specific parts, 116 more guardrails and 104 more ledgers and beams. Against Layher Allround (515), it has 520 more system-specific parts, 140 more ledgers and beams and 96 more frames and standards.
Only the Tube & coupler JGJ 130 (China) list carries couplers (520); the lists of HAKI Universal and Layher Allround have no such row. The HAKI Universal list has end toeboards (12), right-angle couplers for wall ties (18) and aluminium planks (128), which the Tube & coupler JGJ 130 (China) list does not. The Layher Allround list has U-lift-off preventers (34), end toeboards (8) and right-angle couplers for wall ties (8), which the Tube & coupler JGJ 130 (China) list does not.
How many parts does Tube & coupler JGJ 130 (China) need per wall size?
127 parts at 3 × 4 m and 1219 at 15 × 12 m is ScaFix’s count for one straight wall of Tube & coupler JGJ 130 (China), 1.05 m deep. At 6 × 6 m the list has 302 parts with 8 ties (estimated), rising to 24 ties at 15 × 12 m.
| Wall (length × height) | Bays | Decked lifts | Frames and standards | Decks | Base jacks and legs | Wall ties and fittings | Parts in all |
|---|---|---|---|---|---|---|---|
| 3 × 4 m | 2 × 1.5 m | 2 | 18 | 4 | 6 | 8 | 127 |
| 6 × 6 m | 4 × 1.5 m | 3 | 40 | 12 | 10 | 16 | 302 |
| 9 × 8 m | 6 × 1.5 m | 4 | 70 | 24 | 14 | 22 | 539 |
| 12 × 10 m | 8 × 1.5 m | 5 | 108 | 40 | 18 | 32 | 844 |
| 15 × 12 m | 10 × 1.5 m | 6 | 154 | 60 | 22 | 48 | 1219 |
Tube & coupler JGJ 130 (China): technical data in ScaFix
| Item | Value in ScaFix | Document |
|---|---|---|
| Make-up frame heights | 0.9 m | ScaFix catalogue |
| First tie row, at most | 2.5 m | ScaFix setting (no clause) |
| Anchoring calculated above (top platform) | 28.8 m | ScaFix value from JGJ 130-2011 表6.1.1-1 ([H] 30 m) |
| Base jack the tie pattern assumes, at most | 0.5 m | GB 55023-2022 §4.4.15 «当插入的立杆钢管直径为48.3mm及以上时,伸出长度不应大于500mm» |
How ScaFix builds Tube & coupler JGJ 130 (China): lifts, bottom rail, ties and access
- Net and tarpaulin. With a tarpaulin on Tube & coupler JGJ 130 (China) the manufacturer requires a calculation (JGJ 130-2011 表6.1.1-1 covers scaffolds closed with dense mesh (密目式安全立网) at w0 = 0.4 kN/m²).
- Notices in the editor. JGJ 130-2011 §6.6: the scaffold is braced with scissor braces (剪刀撑) of coupled tubes, each 4 to 6 bays and at least 6 m wide at 45–60°, continuous from bottom to top: over the whole outer face from 24 m, and below 24 m at both ends, at corners and at most 15 m apart. The app counts one diagonal tube per bay and lift over the whole outer face. Transverse braces (横向斜撑): one per lift at each open end (§6.6.5) and, from 24 m, one line at each corner and every 6 bays (§6.6.4-2 asks this of a closed scaffold; the app plans wall by wall and cannot see whether the scaffold is closed, so it counts the 6-bay lines on every scaffold from 24 m). The «diagonal» rows are a count of brace members, not tubes to order: work out the real tube lengths and couplers from the drawing. JGJ 130-2011 §7.3.12: top rail with its upper edge 1.2 m above the deck, mid rail half-way and a toe board at least 180 mm high, all on the inside of the outer standards. The app draws the rails at 1.0 m and 0.5 m and a 1.0 m top lift: fix the rails at the standard's heights and let the top standards reach above the top rail.
Tube & coupler JGJ 130 (China) on a 12 m × 6 m wall: pieces and estimated weight
| Part group | Pieces | Estimated weight |
|---|---|---|
| Frames and standards | 72 | 410 kg |
| Ledgers and beams | 100 | 468 kg |
| Decks | 24 | 234 kg |
| Guardrails | 64 | 342 kg |
| Toeboards | 24 | 68 kg |
| Diagonals | 30 | 262 kg |
| Ends | 6 | 24 kg |
| Wall ties and fittings | 20 | 28 kg |
| Base jacks and legs | 18 | 65 kg |
| System-specific parts | 200 | 240 kg |
| In all | 558 | 2141 kg |
What is different about Tube & coupler JGJ 130 (China) compared with HAKI Universal
- On the same straight 12 m × 6 m wall the engine gives Tube & coupler JGJ 130 (China) 558 parts and HAKI Universal 225; the biggest differences: System-specific parts 200 against 40, Ledgers and beams 100 against 48 and Guardrails 64 against 15.
Documents behind the Tube & coupler JGJ 130 (China) rules in ScaFix
| Used for | Document and passage |
|---|---|
| Wall-tie rule | JGJ 130-2011 表6.1.1-1 (p. 27, PDF p. 36: 二步三跨, lb 1.05 / 1.30 m, h 1.80 m, [H] 32 / 30 m, w0 = 0.4 kN/m²), 表6.4.2 (PDF p. 41: 竖向 ≤ 3h, 水平 ≤ 3la, ≤ 40 m²), §6.4.3 (PDF p. 41–42: «偏离主节点的距离不应大于 300mm», «从底层第一步纵向水平杆处开始设置»), §6.4.4 (PDF p. 42: 开口型两端, ≤ 层高且 ≤ 4m) |
| Ties under a tarpaulin | JGJ 130-2011 表6.1.1-1 covers scaffolds closed with dense mesh (密目式安全立网) at w0 = 0.4 kN/m² |
Compare Tube & coupler JGJ 130 (China)
Closest to Tube & coupler JGJ 130 (China) by type and longest bay in ScaFix’s catalogue: SIGMA RTM (Modular scaffold with rosettes, longest bay 3.07 m), Japanese wedge scaffold (Modular scaffold with wedge connections, longest bay 1.8 m) and RUBO RK (Modular scaffold with wedge connections, longest bay 2.53 m).
Pick Tube & coupler JGJ 130 (China) if…
- you build in lifts of 1.8 m: that is this system’s lift height in ScaFix, against 2 m for most systems.
Other scaffolds for sites in Japan, China and Korea
ScaFix has a page of its own, with bay lengths, widths and the parts list, for these scaffolds used on sites in Japan, China and Korea: beside this one, the Japanese frame scaffold (枠組足場), the Japanese wedge scaffold, B and A type (くさび緊結式足場), China’s cup-lock scaffold to JGJ 166-2016 (碗扣式钢管脚手架), the Chinese disk-lock scaffold, Type B and the Korean system scaffold to KCS 21 60 10 (시스템비계). Each page names the standard or source its set-up was taken from.