Scaffold system
Tubesca-Comabi R200 Progress scaffold: bay lengths, depths and parts list
Tubesca-Comabi R200 Progress has bay lengths of 1.5–3 m and a depth of 0.8 m in ScaFix. Enter your walls, and ScaFix draws the Tubesca-Comabi R200 Progress scaffold in 3D and works out its parts list. Any other size: Scaffold calculator.
By Ole Emil Frikstad Urstad · How the numbers are computed ·
How many parts does Tubesca-Comabi R200 Progress need for a house?
ScaFix plans Tubesca-Comabi R200 Progress with the bay lengths 3 m, 2.5 m, 2 m and 1.5 m and scaffold depth 0.8 m. On ScaFix’s 11.4 m × 5.3 m example house, scaffolded all round, Tubesca-Comabi R200 Progress needs 320 parts; Jamax needs 376 on the same house.
Scaffold calculator
What is Tubesca-Comabi R200 Progress?
Tubesca-Comabi R200 Progress is the French maker’s steel H-frame facade scaffold, planned from the assembly notice it shares with the M368 modular system, 100-00035775 (index 2, September 2024): frames 0.80 m wide and 2.00 m high, bays of 1.5, 2.0, 2.5 and 3.0 m, up to 24 m deck height.
It suits French facade work. The parts list names the notice’s own references: R3 frames, R08-A aluminium decks 0.73 m wide, SECURIT UP guardrails, PC toe boards and RCM diagonals, with the masses the notice prints. On ScaFix’s example house it needs 320 parts with 28 wall ties; on a straight 10 m × 6 m wall the engine gives 86 parts.
What does the Tubesca-Comabi R200 Progress documentation warn about?
The notice (§14.1, p. 68) ties both end frame lines every 4 m and the other lines every 8 m, staggered, under the deck; under a net every line every 4 m, under a tarpaulin every 2 m. Its SECURIT UP guardrail does not brace the facade (p. 66).
What bay lengths and depths does Tubesca-Comabi R200 Progress have?
ScaFix’s catalogue gives Tubesca-Comabi R200 Progress 4 bay lengths, 3 m, 2.5 m, 2 m and 1.5 m, and one depth, 0.8 m. ScaFix splits the example house’s 11.4 m wall into 1 × 1.5 m + 3 × 3 m + 1 × 2.5 m (0.8 m deep, 2 m lifts, ties every 4 m up the wall).
- Manufacturer · System type
- Tubesca-Comabi · Frame scaffold (facade scaffold)
- Bay lengths · Depths
- 3 m, 2.5 m, 2 m, 1.5 m · 0.8 m
- Source
- Tubesca-Comabi «Notice de montage M368/R200P/R200R» 100-00035775-ind.2 (09.2024), R200 PROGRESS (named in ScaFix’s catalogue; no checked PDF link yet)
- Source of bay lengths and depths
- Tubesca-Comabi notice 100-00035775 ind. 2 §6.1 p. 34, §4.1.5 p. 16 (read 23 October 2026)
- How ScaFix plans Tubesca-Comabi R200 Progress
- 2 m lifts; ties every 4 m vertically, every 6 m (2 × 3 m) / 5 m (2 × 2.5 m) / 4 m (2 × 2 m) along the wall; diagonals at least one per 4 bays in every lift
- iPhone app
- Tubesca-Comabi R200 Progress is on the web now and not in the iPhone app yet; the iPhone app does not open a project saved with it.
How far apart are Tubesca-Comabi R200 Progress wall ties?
Tubesca-Comabi R200 Progress wall ties sit every 4 m in height and every 6 m along the wall with the 3 m bay. Rule: Tubesca-Comabi «Notice de montage M368/R200P/R200R» 100-00035775-ind.2. The lowest Tubesca-Comabi R200 Progress tie row sits no higher than 3 m.
| Bay length | Bays between ties | Tie spacing along the wall |
|---|---|---|
| 3 m | 2 | 6 m |
| 2.5 m | 2 | 5 m |
| 2 m | 2 | 4 m |
| 1.5 m | 2 | 3 m |
How each system's tie rule was checked, with its source: verification status of all systems.
Sources for Tubesca-Comabi R200 Progress
Tie rule for Tubesca-Comabi R200 Progress: Tubesca-Comabi «Notice de montage M368/R200P/R200R» 100-00035775-ind.2 (09.2024), R200 PROGRESS: §14.1 p. 68 (cas 1: extrémités tous les 4 m, autres files tous les 8 m en quinconce, 24 m², «immédiatement au-dessous du plancher (ou maximum à 0.15 m)»), p. 69 (protection couvreur: chaque file au dernier niveau de plancher), ch. 5 p. 30 (NR 24 / 20 / 16 m², R 12 / 10 / 8 m² pour une maille de 3 / 2,5 / 2 m), §6.1 p. 34 (> 24 m: étude BEAC). ScaFix is a planning tool, not a structural approval.
- M368 / R200 Progress & Record — Notice de montage – Cas usuels · Tubesca-Comabi · 100-00035775 ind. 2, 09.2024 · FR · link checked 10 Nov 2026
The example house with Tubesca-Comabi R200 Progress
| Wall | Length | Height | Bays |
|---|---|---|---|
| Wall 1 + 3 | 11.4 m | 4.5 m | 1 × 1.5 m + 3 × 3 m + 1 × 2.5 m |
| Wall 2 + 4 (gable) | 5.3 m | 6 m | 1 × 1.5 m + 1 × 3 m + 1 × 2.5 m |
What is on the Tubesca-Comabi R200 Progress parts list for the example house?
On the example house, ScaFix lists 320 parts for Tubesca-Comabi R200 Progress; depth 0.8 m, decks at 2.5 m and 4.5 m, ladder access. The list is led by 60 frames and standards, 60 base jacks and legs and 56 wall ties and fittings.
| Part | Length | Count |
|---|---|---|
| Frames and standards | ||
| Frames | 2 m | 40 |
| Frames | 1 m | 4 |
| Top-lift guardrail posts | 16 | |
| Decks | ||
| Decks without ladder | 3 m | 14 |
| Decks without ladder | 2.5 m | 8 |
| Decks without ladder | 1.5 m | 8 |
| Decks with ladder | 3 m | 4 |
| Guardrails | ||
| Front guardrails | 3 m | 30 |
| Front guardrails | 2.5 m | 12 |
| Front guardrails | 1.5 m | 12 |
| Toeboards | ||
| Toeboards | 3 m | 16 |
| Toeboards | 2.5 m | 8 |
| Toeboards | 1.5 m | 8 |
| Diagonals | ||
| Diagonals | 2.5 m | 8 |
| Diagonals | 1.5 m | 8 |
| Ends | ||
| End guardrails | 8 | |
| Wall ties and fittings | ||
| Wall ties | 28 | |
| Wall-anchor fittings | 28 | |
| Base jacks and legs | ||
| Base jacks / legs | 40 | |
| Base collars | 20 | |
Tubesca-Comabi R200 Progress · Scaffold depth: 0.8 m · Decks at: 2.5 m, 4.5 m · Decks with ladders · Parts in all: 320
Calculated with ScaFix, a scaffold planning app for browser and iPhone (115 scaffold systems from 57 manufacturers, checked 10 November 2026).
How does Tubesca-Comabi R200 Progress compare with similar systems?
Same house, same planning rules: Tubesca-Comabi R200 Progress takes 320 parts, against Jamax with 376 (+56), Layher Blitz with 263 (−57) and Plettac SL 70/100 with 316 (−4). The nearest count is Plettac SL 70/100, 4 parts away at 0.73 m deep (Tubesca-Comabi R200 Progress: 0.8 m).
| System | Bays on the long wall | Depth | Parts in all | Against Tubesca-Comabi R200 Progress |
|---|---|---|---|---|
| Tubesca-Comabi R200 Progress | 1 × 1.5 m + 3 × 3 m + 1 × 2.5 m | 0.8 m | 320 | this page |
| Jamax | 4 × 3 m | 0.68 m | 376 | +56 (+18%) |
| Layher Blitz | 4 × 3.07 m | 0.73 m | 263 | -57 (-18%) |
| Plettac SL 70/100 | 1 × 1.5 m + 3 × 3 m + 1 × 2.5 m | 0.73 m | 316 | -4 (-1%) |
How many parts does Tubesca-Comabi R200 Progress need per wall size?
For one straight wall, ScaFix plans Tubesca-Comabi R200 Progress with 34 parts at 6 × 4 m and 341 parts at 30 × 12 m, 0.8 m deep. The 12 × 6 m wall takes 84 parts, 7 of them wall ties, rising to 19 ties at 30 × 12 m.
| Wall (length × height) | Bays | Decked lifts | Frames and standards | Decks | Base jacks and legs | Wall ties and fittings | Parts in all |
|---|---|---|---|---|---|---|---|
| 6 × 4 m | 2 × 3 m | 1 | 6 | 3 | 9 | 4 | 34 |
| 12 × 6 m | 4 × 3 m | 2 | 15 | 9 | 15 | 14 | 84 |
| 18 × 8 m | 6 × 3 m | 3 | 28 | 19 | 21 | 18 | 147 |
| 24 × 10 m | 8 × 3 m | 4 | 45 | 34 | 27 | 32 | 240 |
| 30 × 12 m | 10 × 3 m | 5 | 66 | 52 | 33 | 38 | 341 |
Tubesca-Comabi R200 Progress: technical data in ScaFix
| Item | Value in ScaFix | Document |
|---|---|---|
| Make-up frame heights | 1 m | Tubesca-Comabi Notice de montage M368/R200P/R200R-35775-ind.2, Septembre 2024, §6.1 p. 34 + §4.1.5 p. 16 (R200 PROGRESS) |
| First tie row, at most | 3 m | Tubesca-Comabi «Notice de montage M368/R200P/R200R» 100-00035775-ind.2 (09.2024), R200 PROGRESS: §14.1 p. 68 (cas 1: extrémités tous les 4 m, autres files tous les 8 m en quinconce, 24 m², «immédiatement au-dessous du plancher (ou maximum à 0.15 m)»), p. 69 (protection couvreur: chaque file au dernier niveau de plancher), ch. 5 p. 30 (NR 24 / 20 / 16 m², R 12 / 10 / 8 m² pour une maille de 3 / 2,5 / 2 m), §6.1 p. 34 (> 24 m: étude BEAC) |
| Tie rows behind a net, at most | 4 m | Tubesca-Comabi 35775 ind. 2 §14.1 p. 68 cas 2 «Pour le reste des files, un amarrage tous les 4m à la verticale en quinconce … 12 m²» |
| Tie rows under a tarpaulin, at most | 2 m | Tubesca-Comabi 35775 ind. 2 §14.1 p. 68 cas 3 «Un amarrage tous les 2 mètres à la verticale … 6 m²» |
| Anchoring calculated above (top platform) | 24 m | Tubesca-Comabi «Notice de montage M368/R200P/R200R» 100-00035775-ind.2 (09.2024), R200 PROGRESS: §14.1 p. 68 (cas 1: extrémités tous les 4 m, autres files tous les 8 m en quinconce, 24 m², «immédiatement au-dessous du plancher (ou maximum à 0.15 m)»), p. 69 (protection couvreur: chaque file au dernier niveau de plancher), ch. 5 p. 30 (NR 24 / 20 / 16 m², R 12 / 10 / 8 m² pour une maille de 3 / 2,5 / 2 m), §6.1 p. 34 (> 24 m: étude BEAC) |
| Base jack the tie pattern assumes, at most | 0.45 m | Tubesca-Comabi «Notice de montage M368/R200P/R200R» 100-00035775-ind.2 (09.2024), R200 PROGRESS: §14.1 p. 68 (cas 1: extrémités tous les 4 m, autres files tous les 8 m en quinconce, 24 m², «immédiatement au-dessous du plancher (ou maximum à 0.15 m)»), p. 69 (protection couvreur: chaque file au dernier niveau de plancher), ch. 5 p. 30 (NR 24 / 20 / 16 m², R 12 / 10 / 8 m² pour une maille de 3 / 2,5 / 2 m), §6.1 p. 34 (> 24 m: étude BEAC) |
| Access decks with ladder, bay lengths | 3 m | Tubesca-Comabi notice 100-00035775 ind. 2 §4.2.2–4.2.3 p. 20–21, §4.4.3 p. 25, ch. 15 p. 75 |
| Hatch decks without ladder, bay lengths | 1.5 m, 2 m and 2.5 m | Tubesca-Comabi notice 100-00035775 ind. 2 §4.2.2–4.2.3 p. 20–21, §4.4.3 p. 25, ch. 15 p. 75 |
| Separate access ladder | 04030054 · 2 m | Tubesca-Comabi notice 100-00035775 ind. 2 §4.4.3 p. 25 «04030054 Échelle acier 2m00 – 6 barreaux» |
How ScaFix builds Tubesca-Comabi R200 Progress: lifts, bottom rail, ties and access
- Access. Tubesca-Comabi R200 Progress is climbed inside the scaffold, through access decks with a built-in ladder, which the maker lists for the 3 m bays (Tubesca-Comabi notice 100-00035775 ind. 2 §4.2.2–4.2.3 p. 20–21, §4.4.3 p. 25, ch. 15 p. 75).
- Notices in the editor. The starting height follows notice §11.1 (start frame R1): R200 PROGRESS starts every frame line on an R1 U start frame (1.20 m high). The notice prints no height for the stack, so the app keeps its usual levels – check the level of the first deck. Locking pins RCM12 (00080450, notice p. 16): the R200 PROGRESS start pins the elements with RCM12 (§11.1 step 4 p. 55), and the erection with provisional guardrails and without MDS pins each new level's frames (§11.3 step 12 p. 59; §11.4 step 5 p. 61, step 11 p. 62). Load class (notice §5.2.3 p. 32, §5.4 p. 33): with the R08-A 0.73 m decks the R200 PROGRESS is load class 3 (200 daN/m²) in 3.00 / 2.50 / 2.00 m bays; the table gives no load class for a 1.50 m bay. The R08A73 decks are marked «N» – without impact test on the deck (§5.2.1 p. 31).
Tubesca-Comabi R200 Progress on a 12 m × 6 m wall: pieces and estimated weight
| Part group | Pieces | Estimated weight |
|---|---|---|
| Frames and standards | 15 | 190 kg |
| Decks | 9 | 192 kg |
| Guardrails | 15 | 229 kg |
| Toeboards | 8 | 39 kg |
| Diagonals | 4 | 29 kg |
| Ends | 4 | 32 kg |
| Wall ties and fittings | 14 | 20 kg |
| Base jacks and legs | 15 | 91 kg |
| In all | 84 | 822 kg |
What is different about Tubesca-Comabi R200 Progress compared with Jamax
- On the same straight 12 m × 6 m wall the engine gives Tubesca-Comabi R200 Progress 84 parts and Jamax 125; the biggest differences: Wall ties and fittings 14 against 56, System-specific parts 0 against 10 and Base jacks and legs 15 against 10.
Compare Tubesca-Comabi R200 Progress
Closest to Tubesca-Comabi R200 Progress by type and longest bay in ScaFix’s catalogue: Tobler MATO 1 (same type, longest bay 3 m), Yağmur H-Type (same type, longest bay 3 m) and Metaltech Saferstack Ladder Arch (same type, longest bay 3.05 m).
Pick Tubesca-Comabi R200 Progress if…
- you want fewer pieces to handle: Tubesca-Comabi R200 Progress needs 320 parts on ScaFix’s example house, against a median of 333 for its type.