Rules and safety
Scaffolding regulations in Canada: CSA Z797 and the provincial rules in Ontario, British Columbia and Alberta
Scaffold rules in Canada are provincial and territorial: the province where the site sits decides the guardrails, ties and inspections. This guide compares three of them, Ontario, British Columbia and Alberta, from texts opened on 24 November 2026. Quebec's code could not be verified, so Quebec is not covered here.
See the scaffold for your wall
By Ole Emil Frikstad Urstad · Checked against Ontario O. Reg. 213/91, Construction Projects (current from 20 April 2026), ss. 26, 26.1(1)–(2), 26.3(1), (4)–(5), 126(1) and (3), 128(1)(g), 129(1)–(3), 130(1)–(5), 131, 134(1)–(3), 135(1)–(2); WorkSafeBC Occupational Health and Safety Regulation, Part 13, ss. 13.2(1), 13.3, 13.11(1) and (4), 13.14(1)–(2), 13.15, 13.17(1)–(5); WorkSafeBC Occupational Health and Safety Regulation, Parts 4 and 11, ss. 4.54, 4.55(a), 4.56(c), 4.58(5)(a); 11.2(1)–(2), 11.3(1)(a); Alberta Occupational Health and Safety Code (Alta Reg 191/2021), current as of 31 March 2025, ss. 139(1), (3), (5), 140(1), 315(1), 321(1) and (3), 323, 324(1), 325(1)–(3) and (5), 326(1)–(7), 329(4)(c) and (5), 330(1), 331; Standards Council of Canada standards database, CSA Z797-09 (R2014), status (cancelled) and «Superseded By: CAN/CSA-Z797-18» (24 November 2026) · How the numbers are computed ·

Is there one scaffolding regulation for all of Canada?
No. Each province and territory sets its own scaffold rules, and this guide covers only Ontario, British Columbia and Alberta; Quebec could not be verified. Among the three, Ontario requires engineer design above 15 m, British Columbia an inspection before use on every shift, and Alberta a colour-coded tag at each entry point.
Before you rely on this guide
This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.
Who writes the scaffold rules in Canada?
Each province and territory publishes its own occupational health and safety regulation, and the scaffold rules live in those texts. Federally regulated workplaces come under the Canada Occupational Health and Safety Regulations (Part III) instead; that text, Quebec and the other provinces and territories are not covered here, only Ontario, British Columbia and Alberta.
The versions read: O. Reg. 213/91, Construction Projects, made under Ontario's Occupational Health and Safety Act, in the current consolidation in force from 20 April 2026; Parts 4, 11 and 13 of the WorkSafeBC Occupational Health and Safety Regulation; and the Alberta OHS Code in the King's Printer consolidation current to 31 March 2025, so any Alberta amendment made after that date is not reflected here.
Coming from the United States? OSHA's scaffold rules are American federal rules, covered on our page on OSHA scaffolding requirements. On a Canadian site the provincial text is the one to read, and its figures are not the same.
How do Ontario, British Columbia and Alberta compare?
On the points a scaffold planner meets first, the three provinces share a 3 m line for fall protection and then part ways: when a scaffold platform needs a guardrail, the minimum platform width, how tightly the scaffold is tied, when an engineer must design it, and how it is inspected and tagged (ON, BC, AB).
The figures in this table come from O. Reg. 213/91, the WorkSafeBC OHS Regulation and the Alberta OHS Code, read on 24 November 2026; section numbers are in brackets.
| Point | Ontario (O. Reg. 213/91) | British Columbia (OHS Regulation) | Alberta (OHS Code) |
|---|---|---|---|
| Fall protection starts at | A fall of more than 3 m; guardrail system first (ss. 26, 26.1) | A fall of 3 m (10 ft) or more; guardrails first where practicable (s. 11.2) | A fall of 3 m or more; guardrail first (s. 139) |
| Guardrail on a scaffold platform | Where a worker may fall 2.4 m or more; top 0.9–1.1 m, toe board at least 89 mm (s. 26.3) | The applicable CSA or ANSI standard's rule (ss. 4.56(c), 13.2); Part 4 defines a top rail of 102–112 cm (s. 4.54) | Top member 920–1,070 mm, uprights at most 3 m apart (s. 315); toe board at least 140 mm (s. 321) |
| Minimum platform width | 460 mm (s. 135) | 50 cm nominal (s. 13.14) | 500 mm (s. 330) |
| Tying | Secured at vertical intervals of no more than 3 × the least lateral dimension at the base (s. 128(1)(g)) | Guyed or secured once the height exceeds 3 × the minimum base dimension (s. 13.17) | Single- and double-pole: one tie per 4.6 m vertical and 6.4 m horizontal, 3 m × 3 m if hoarded (s. 324) |
| Engineer required | Above 15 m, or 10 m for tube and clamp (s. 130) | Above 38 m (125 ft), above 25 m (80 ft) with stairways, plus covered-scaffold bracing and other listed cases (s. 13.11) | Load above 367 kg/m² on scaffold types not otherwise named in the Code (s. 325(3)–(4)) |
| Inspection and tags | Written pre-use inspection of engineered scaffolds (s. 130); no tag rule found | Before use on each shift and after any modification (s. 13.3); no tag rule found | Colour tag at each entry (s. 326); listed types inspected at least every 21 days |
Two cautions sit behind the table. Alberta's tie spacing in section 324 applies only to single- and double-pole scaffolds; for metal scaffolding, section 331 points to the manufacturer's specifications or ones certified by a professional engineer (Alberta OHS Code). And Alberta's 21-day inspection in section 326(3) names particular scaffold types, but every scaffold's tag expires 21 calendar days after the inspection it records (s. 326(4)) and a scaffold with an expired tag or no tag may not be used (s. 326(6)).

What does Ontario's Construction Projects regulation require?
Ontario sets its scaffold rules in O. Reg. 213/91. A scaffold must take twice its likely maximum load within allowable stresses and four times that load without overturning (s. 126), its platforms must carry at least 2.4 kN/m² (s. 134), and only a competent worker may supervise its erection, alteration and dismantling (s. 131).
A guardrail system comes before every other method: travel restraint, fall restricting, fall arrest and safety nets are used, in that order, only where a guardrail is not practicable (s. 26.1). On a scaffold platform the guardrail is required where a worker may fall 2.4 m or more. It has a top rail 0.9 to 1.1 m above the surface, an intermediate rail midway and a toe board of at least 89 mm, stands no more than 300 mm from the edge of the work surface, and resists a 675 N sideways point load on the top rail (s. 26.3).
Section 135 shapes the platform: at least 460 mm wide, planks laid tightly side by side across the full width once it is 2.4 m or more above a surface, no unguarded openings, and every component secured against slipping. Sawn lumber planks are number 1 grade spruce, at least 48 by 248 mm, spanning no more than 2.1 m and overhanging their supports by 150 to 300 mm (s. 135). Each platform component carries at least 2.2 kN (s. 134(2)).
Every scaffold is secured at vertical intervals of no more than three times its least lateral dimension, measured at the base (s. 128(1)(g)). Above 15 m from its base support, or 10 m for a tube and clamp system, it must be designed by an engineer and erected to that design, with drawings that give the erection instructions and rated loads (s. 130).
For those engineered scaffolds, an engineer or a competent worker designated by the project's supervisor inspects the scaffold before use and states in writing whether it matches the drawings, and the constructor keeps the drawings and that statement at the project while the scaffold stands (s. 130(3)–(5)). That pre-use check belongs to section 130: we found no general every-shift inspection rule in sections 125 to 136.
Rolling scaffolds need a braking device on every castor or wheel, applied whenever a worker is on the scaffold, and guy wires or outriggers once the platform height exceeds three times the least lateral dimension. One with a platform more than 2.4 m above its base is moved with a worker aboard only if that worker wears a full body harness attached to a fixed support and the surface is firm and level (s. 129).
What does WorkSafeBC's regulation require of scaffolds?
British Columbia anchors scaffolds to standards and makers' data. A work platform must meet the CSA or ANSI standard in effect when it was manufactured, another standard the Board accepts, or failing both a professional engineer's requirements (s. 13.2), and major components follow the manufacturer's technical data, kept at the workplace (s. 13.15).
Of the three texts compared here, BC asks for the most frequent inspection: ladders, work platforms and their components, scaffolds included, are inspected before use on each shift and after any modification, and any condition that might endanger workers is remedied before use (s. 13.3). No tag requirement appears in Part 13.
A professional engineer's instructions govern, among other cases, a scaffold more than 38 m (125 ft) high, one more than 25 m (80 ft) high with stairways, the bracing of a scaffold enclosed by a tarpaulin or other cover, and scaffolds that support a temporary floor or a crane or hoist that is not manually powered. A signed copy stays at the workplace during installation, use and disassembly (s. 13.11).
Platforms have a nominal width of at least 50 cm (20 in), with no more than one opening, up to 25 cm (10 in) wide; guardrails may be left off beside a structure that gives equivalent protection if the gap is 30 cm (12 in) or less (s. 13.14). The scaffold stands plumb and level on bearing plates or sills, is rigidly braced, is guyed or secured to the building once its height exceeds three times its minimum base dimension, and its height adjustment devices extend no more than 2/3 of their length or 60 cm (24 in), whichever is less, unless the manufacturer specifies otherwise (s. 13.17).
Part 4 defines a guardrail as a top rail 102 to 112 cm (40 to 44 in) above the work surface with a midrail about halfway (s. 4.54). The general 122 cm (4 ft) trigger in section 4.55 does not apply to a scaffold that meets its applicable standard's guardrail requirements (s. 4.56), and temporary wooden guardrails on a scaffold may have posts up to 3 m (10 ft) apart unless an engineer designs them (s. 4.58). Fall protection applies from 3 m (10 ft) (s. 11.2), and a written fall protection plan is needed from 7.5 m (25 ft) where workers lack permanent guardrails (s. 11.3).
What does Alberta's OHS Code require?
Alberta names a standard and a load factor. Section 323 requires scaffolds used in construction, alteration, repair or demolition to comply with CSA S269.2-M87 (R2003), Access Scaffolding for Construction Purposes, and section 325 requires design for at least four times the load that may be imposed, with every worker told the maximum load (Alberta OHS Code).
A scaffold of a type the Code does not otherwise specifically refer to, carrying an evenly distributed load of more than 367 kg/m², is designed and certified by a professional engineer and built and used to those specifications (s. 325(3)–(4)). Metal scaffolding is erected, used, inspected, maintained and dismantled to the manufacturer's specifications or ones a professional engineer certifies (s. 331). Single- and double-pole scaffolds are braced and get one tie-in per 4.6 m vertically and per 6.4 m horizontally, or per 3 m both ways when hoarded (s. 324).
Platforms are at least 500 mm wide, leave no more than 250 mm open to the structure and run continuously around obstructions (s. 330). Planks extend 150 to 300 mm beyond a ledger, and overlapping planks at least 300 mm (s. 329). The guardrail's top member sits 920 to 1,070 mm above its base with a mid member halfway and uprights no more than 3 m apart at their centres (s. 315); toe boards stand at least 140 mm high and go on the outer edge of temporary scaffolding wherever materials could fall more than 3.5 m (s. 321).
Workers are protected from a fall of 3 m or more, with a guardrail as the first choice and a travel restraint system where a guardrail is not reasonably practicable (s. 139). Where a worker could fall 3 m or more without guardrail protection, the employer writes the procedures into a fall protection plan (s. 140).
How do Alberta's scaffold tags work?
In Alberta a scaffold is colour coded with a tag at each point of entry: green for «Safe for Use», yellow for «Caution: Potential or Unusual Hazard» and red for «Unsafe for Use», or similar wording (s. 326(1)). A red tag, an expired tag or no tag means nobody uses it.
- Workers may not use a scaffold that has a red tag, an expired green or yellow tag, or no tag at all (s. 326(6)).
- Each tag shows the duty rating, the date of the last inspection, the competent worker who made it, any precautions, and the tag's expiry date (s. 326(5)).
- A tag expires 21 calendar days after the inspection it records (s. 326(4)).
- Bracket, double-pole, needle-beam, outrigger, single-pole, suspended and swingstage scaffolds are inspected and tagged by a competent worker before first use and at intervals of no more than 21 calendar days while in use (s. 326(3)).
- The same listed types, if erected but not put into service or left unused for more than 21 consecutive days, carry a red tag until a competent worker inspects them (s. 326(2)).
- Those use bans do not apply to a competent worker who is erecting, inspecting or dismantling the scaffold (s. 326(7)).
Tags are an Alberta rule. Neither Ontario's regulation nor Part 13 of the BC regulation, as read for this guide, contains a scaffold tag requirement.
Where does CSA Z797 stand?
CSA Z797 is the code of practice for access scaffold, and its current edition could not be confirmed for this guide. The Standards Council of Canada database lists CSA Z797-09 (R2014) as withdrawn and superseded by CAN/CSA-Z797-18; whether a newer edition or a reaffirmation has followed since was not verified.
The provinces cite standards in their own ways. Alberta's Code still names CSA S269.2-M87 (R2003) in section 323; British Columbia points to whichever CSA or ANSI standard was in effect when the equipment was manufactured (s. 13.2); and the Ontario sections read here set their own figures. This guide does not reproduce any standard, so ask the supplier which edition its technical data refers to.
How does a 12 m by 9 m PERI UP wall work out?
On a façade 12 m long and 9 m high in PERI UP, ScaFix plans 4 bays and 4 decked levels over 115 m² of scaffold, and in the app ScaFix counts 258 parts and places 13 wall ties. Those ties follow the maker's own rule for PERI UP, not any province's tie formula.
That difference matters in Ontario, where section 128(1)(g) asks for securing at vertical intervals of no more than three times the least lateral dimension at the base, and in BC, where section 13.17(4) requires tying once the height exceeds three times the minimum base dimension (O. Reg. 213/91, OHS Regulation). ScaFix does not make that provincial check; it stays with the people on site.
A scaffold for a 9 m wall stays well under Ontario's 15 m engineer line (s. 130) and BC's 38 m line (s. 13.11), yet the rest of the table applies in full: guardrails on platforms from 2.4 m in Ontario, an inspection before each shift in BC, and a tag at every entry in Alberta (s. 326).
The scaffolding calculator returns bays, lifts, decked levels and area for a single wall, and a feet edition suits crews who measure in imperial; parts and ties are counted in the ScaFix app under a plan. Both PERI UP and Layher Allround have system pages of their own.
Which scaffold suppliers operate in Canada?
Three suppliers' own pages were read. Layher Canada lists sales offices and yards in Edmonton, Quebec, Toronto and Vancouver; PERI Canada offers formwork systems, scaffolding and engineering services; and BrandSafway lists Canada in its location filter and offers sectional, Systems, tube and clamp, SafLock and CUPLOK scaffold.
None of those home pages mentions CSA standards or Canadian certification. BC's section 13.15 and Alberta's section 331 both make the manufacturer's data or specifications the reference, so ask the supplier for the rated loads and erection procedure of the system on your job (BC, Alberta).
What does ScaFix leave to the people on site?
Everything legal. ScaFix is a planning aid that turns a wall into bays, decked levels and a 3D model, with parts and ties counted in the app. It offers no structural calculation, no approval, no inspection and no compliance check, and the competent worker, the engineer and the provincial regulation's own wording all remain in charge.
For the site walk-round, our scaffold inspection checklist lists general points, and the guide to scaffold guardrail height goes deeper on rails. Neither replaces the provincial text.
Work at the eaves is covered in roof-edge protection with a scaffold. New Zealand's thresholds are set out in scaffolding rules in New Zealand, and further countries in scaffolding rules by country.
Frequently asked questions
Who regulates scaffolding in Canada?
Each province and territory, through its own occupational health and safety regulation; federally regulated workplaces follow the federal regulations, which this guide does not cover. Ontario uses O. Reg. 213/91 under its Occupational Health and Safety Act, British Columbia the WorkSafeBC Occupational Health and Safety Regulation, and Alberta the OHS Code.
This guide covers those three only; Quebec's code could not be verified.
How often must a scaffold be inspected in Canada?
Each province sets its own interval. British Columbia requires inspection before use on each shift and after any modification (s. 13.3). Alberta requires listed scaffold types to be inspected and tagged before first use and at least every 21 days (s. 326). Ontario's verified rule is a written pre-use inspection of engineer-designed scaffolds (s. 130).
When does a scaffold need an engineer in Canada?
In Ontario, above 15 m from its base support, or 10 m for tube and clamp (s. 130). In British Columbia, above 38 m (125 ft), above 25 m (80 ft) with stairways, and in other listed cases such as covered scaffolds (s. 13.11).
In Alberta, an evenly distributed load of more than 367 kg/m² on scaffold types the Code does not otherwise name (s. 325). Each text has further engineer rules for other scaffold types.
What is the current edition of CSA Z797?
The Standards Council of Canada lists CSA Z797-09 (R2014), Code of practice for access scaffold, as cancelled and superseded by CAN/CSA-Z797-18. Whether a later edition has replaced the 2018 one was not verified for this guide, so confirm the edition with CSA Group before relying on it.
Do Canadian scaffolds need green, yellow and red tags?
Yes in Alberta: section 326 of the OHS Code requires a colour-coded tag at each point of entry, showing the duty rating, inspection date, inspector and expiry. No scaffold tag requirement appears in Ontario's O. Reg. 213/91 or in Part 13 of British Columbia's regulation as read for this guide.
Sources
Primary sources used for this article, with the date each was read.
- Justice Laws, Canada Occupational Health and Safety Regulations (SOR/86-304), Part III (read 24 November 2026)
- Government of Ontario, O. Reg. 213/91 Construction Projects (current consolidation from 20 April 2026) (read 24 November 2026)
- WorkSafeBC, OHS Regulation Part 13: Ladders, Scaffolds and Temporary Work Platforms (read 24 November 2026)
- WorkSafeBC, OHS Regulation Part 11: Fall Protection (read 24 November 2026)
- WorkSafeBC, OHS Regulation Part 4: General Conditions (read 24 November 2026)
- Alberta King's Printer, Occupational Health and Safety Code (Alta Reg 191/2021), current as of 31 March 2025 (read 24 November 2026)
- Standards Council of Canada, standards database record for CSA Z797-09 (R2014) (read 24 November 2026)
- Layher Canada, home page (read 24 November 2026)
- PERI Canada, home page (read 24 November 2026)
- BrandSafway, home and locations pages (read 24 November 2026)