In New Zealand, erecting or dismantling scaffolding from which anyone could fall 5 metres or more is notifiable work, with written notice at least 24 hours ahead. Anyone building a scaffold with any part 5 m or more above the ground needs a certificate of competence, or must be a trainee under a holder's direct supervision.

· How the numbers are computed ·

Acrow QUICKSTAGE scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Acrow QUICKSTAGE around the example house, as ScaFix draws it in 3D.

What are the main scaffolding rules in New Zealand?

The 5 m line decides most scaffold jobs in New Zealand. Under the HSE Regulations 1995, erecting or dismantling scaffolding with a possible fall of 5 m or more is notifiable (reg 2), written notice goes in at least 24 hours ahead (reg 26), and its erectors need a certificate of competence (reg 53).

Before you rely on this guide

This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.

Which laws govern scaffolding in New Zealand?

Two pieces of legislation do the work. The Health and Safety at Work Act 2015 sets the general duty, and the Health and Safety in Employment Regulations 1995, still in force, hold the scaffold rules themselves: notifiable work, protection against falls, the supply of scaffolding and the certificates that scaffolders must carry.

Section 36 of the 2015 Act requires a PCBU, a person conducting a business or undertaking, to ensure so far as is reasonably practicable the health and safety of its own workers and of workers whose activities it influences or directs. The 1995 regulations appear on the legislation site as the latest version as at 20 October 2025, administered by the Ministry of Business, Innovation, and Employment, and regulation 2 now defines «Act» as the 2015 Act. Much of the regulation text still speaks of «every employer», so a planner reads the two together.

One trap for anyone searching: the newer General Risk and Workplace Management Regulations 2016 hold no falls rule at regulations 21 and 22. There, regulation 21 deals with remote or isolated work and regulation 22 with atmospheres that could catch fire or explode, so the fall thresholds a scaffold planner needs still come from the 1995 regulations.

Which heights trigger the rules?

Three heights matter in the 1995 regulations. Where an employee could fall more than 3 m, the employer must provide means to prevent it; at 5 m, erecting or dismantling scaffolding becomes notifiable; and once any part of a scaffold is 5 m or more above the ground, its erectors need a certificate of competence.

The thresholds below are taken from the HSE Regulations 1995, version as at 20 October 2025.

ThresholdWhat it triggersRegulation
A fall of more than 3 mMeans to prevent the fall, suitable for the purpose, so far as is reasonably practicablereg 21(2)
A fall of 5 m or more while scaffolding is erected or dismantledThe work is notifiablereg 2, notifiable work (c)(ii)
Notifiable work about to beginWritten notice at least 24 hours before the startreg 26(3)
Any part of the scaffold 5 m or more above the groundErectors hold a current certificate of competence, or train under a holder's direct supervisionreg 53(1) and (2)
Construction work that cannot be done safely without scaffoldingScaffolding is provided, suitable, of sound material, with a reserve of strength and sufficient in amountreg 22(2)

Mind the wording. The fall duty starts at more than 3 m, while the notifiable-work and certificate rules start at 5 m or more, so a scaffold whose top reaches exactly 5 m is caught by both of the later rules (regs 2, 21 and 53).

Kwikstage scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Kwikstage around the example house, as ScaFix draws it in 3D.

When is scaffolding notifiable work, and what goes in the notice?

Erecting or dismantling scaffolding from which any person may fall 5 metres or more is notifiable work under regulation 2. Before it begins, the employer, which includes a person who controls the workplace, lodges a written notice at least 24 hours ahead, saying what, where, by whom and for how long.

Regulation 26(3) lists the particulars: the nature and location of the work; the name, address and contact details of the employer; the intended date of commencement; and the estimated duration (reg 26). Emergency work after damage caused by an earthquake, explosion, fire, flood, lightning, rain, slip, storm or washout is exempt under regulation 26(4).

The house exemption is narrower than many expect. Regulation 2 leaves work on a residential building of up to and including 2 full storeys out of the general item for falls of 5 m or more, but that carve-out is written into item (c)(i) only. The scaffolding item, (c)(ii), has none, so scaffolding on a two-storey house is notifiable whenever a fall of 5 m or more is possible while it goes up or comes down (reg 2).

The regulation still sends the notice to «the nearest such office of the Department». How WorkSafe New Zealand, the regulator, receives notices today was not verified for this page, so check the current route on worksafe.govt.nz before the job is booked.

Who may erect a scaffold that reaches 5 m?

An employer must, so far as is reasonably practicable, make sure that every employee who erects, maintains, repairs or dismantles scaffolding with any part 5 m or more above the ground holds a current certificate of competence for that kind of scaffolding (regulation 53).

A trainee may do the same work under a certificate holder's direct supervision (reg 53(2)). WorkSafe may recognise an organisation to issue certificates of competence of all kinds or of a particular kind (reg 28). Which body issues scaffolding certificates today was not confirmed on a WorkSafe page for this guide, so ask the scaffolder for the certificate itself and check that its class covers the scaffold you are planning.

Below 5 m, regulation 53 does not ask for a certificate, yet the primary duty of care in section 36 of the 2015 Act still applies to the work, whatever the height.

What changed in the scaffolder certificate classes in 2025?

Since 20 October 2025 there have been four classes of scaffolder certificate: elementary, intermediate, advanced and proprietary system suspended. The Health and Safety in Employment (Scaffolding) Amendment Regulations 2025 (SL 2025/200) revoked the old «basic scaffolding» and «suspended scaffolding» definitions and inserted new ones into regulation 2 of the 1995 regulations.

The class contents below are summarised from regulation 2 and regulation 27(5) of the HSE Regulations 1995, as amended on 20 October 2025.

ClassElements it covers (regulation 2)
ElementaryBasic falsework, façade scaffolding, fall arrest systems, modular scaffolding systems standing on their own, gin wheels, ropes, static lines, tower scaffolding up to 33 m high, tube and coupler scaffolding; no intermediate or advanced element
IntermediateBarrow ramps, catch nets, a hoist cantilevered from scaffolding with a load limit of up to 250 kg used only for material, mast climbers, scaffolding for perimeter safety screens or shutters, spurred scaffolding, sloping platforms
AdvancedBracket scaffolding for tank work and formwork, cantilevered scaffolding, hung scaffolding (from a chain, tube or wire rope), load platforms cantilevered from scaffolding, safety nets that protect the public
Proprietary system suspendedA class of its own in regulations 27(5) and 53(1)(d)

Each class builds on the ones beneath it: an applicant for intermediate must know every elementary element as well as the intermediate ones, and the advanced class rests on both (reg 35). A scaffolder whose certificate names the old basic class should ask the issuer how it reads under the new classes.

The Ministry for Regulation says the amendments came into force in October 2025 and that further work is under way, including consultation on a more risk-based approach to working at height and clearer guidance on when scaffolding is needed. Expect more change, and look at the legislation site again before each new job.

What must the scaffold itself provide?

The regulations describe outcomes rather than dimensions. Where construction work cannot be done safely without scaffolding, the employer must provide it, and it must be suitable for its purpose, properly constructed of sound material, built with a sufficient reserve of strength for the loads it may meet, and sufficient in amount (reg 22).

Regulation 21 adds the fall duty: where an employee may fall more than 3 metres, means to prevent the fall are provided and must suit their purpose. For the practical detail a planner looks for, WorkSafe New Zealand publishes good practice guidelines on scaffolding; they could not be opened for checking on the day this page was written, so read them at the source on worksafe.govt.nz rather than from a summary.

On the product side, AS/NZS 1576 is a joint Australian and New Zealand family of scaffolding standards. Its parts and scope are covered on our Australian scaffold rules page; this page does not state which edition a New Zealand job is held to, so settle that with the supplier and the designer.

How would a 10 m by 6 m house wall be planned?

Take a house wall 10 m long and 6 m high, scaffolded in Layher Allround. ScaFix lays it out in 3 bays with 2 decked levels and 51 m² of scaffold, and in the app ScaFix lists 143 parts and places 10 wall ties, following the maker's published rules for the system.

A scaffold for a 6 m wall has parts 5 m or more above the ground, so its erectors need certificates of competence, or trainees work under a holder's direct supervision (reg 53). If anyone could fall 5 m or more while it goes up or comes down, the job is also notifiable, two-storey house or not (reg 2), and the written notice is lodged at least 24 hours before work starts (reg 26).

The scaffolding calculator gives the bays, lifts, decked levels and area for a wall like this one; the parts total and the tie count are figures from ScaFix in the app with a plan. Layher Allround has its own system page, and for another common system there is a page on Kwikstage with a Kwikstage calculator to match.

Which scaffold suppliers have a base in New Zealand?

Two suppliers' own sites were read for this page. Layher Limited lists branches in Māngere, Auckland, and in Seaview, Lower Hutt, plus a Christchurch depot that handles distribution only. Acrow lists branches in Auckland, Taupo, Hamilton, Manawatū, Wellington and Christchurch, offering scaffold services with Ringlock, Layher, Tube & Clip, Acrowscaff and mobile towers.

Whichever supplier you choose, ask for the system's technical instructions before ordering, so that the scaffold plan matches the documents the erectors will work from on site.

What does ScaFix do on a New Zealand job, and what not?

ScaFix is a planning aid. It draws the wall in 3D, sets out bays and decked levels, and counts parts and ties in the app. It is not a structural calculation, approval, inspection or compliance check, and it stands in for neither a certified scaffolder nor the text of the regulations.

For the walk-round before use, our scaffold inspection checklist gives general points. It is not New Zealand's text, so set it beside WorkSafe New Zealand's own guidance rather than in place of it.

Working on a roof from the scaffold raises its own questions, covered in roof-edge protection with a scaffold. For other places, see the province-by-province guide to scaffolding rules in Canada or the overview of scaffolding rules by country.

Frequently asked questions

Do you need a ticket to put up scaffolding in New Zealand?

Yes, once any part of the scaffold is 5 m or more above the ground. Regulation 53 of the HSE Regulations 1995 requires a current certificate of competence for that type of scaffolding, and a trainee may do the work under the direct supervision of a certificate holder.

Below that height the general duty in the Health and Safety at Work Act 2015 still applies.

Is scaffolding on a two-storey house notifiable work?

Yes, if anyone could fall 5 m or more while the scaffold is erected or dismantled. The exemption for residential buildings of up to 2 full storeys covers only the general 5 m fall item in regulation 2, not the scaffolding item, so such work needs written notice at least 24 hours ahead.

What happened to the basic scaffolding certificate?

It was revoked on 20 October 2025 by the Health and Safety in Employment (Scaffolding) Amendment Regulations 2025 (SL 2025/200), along with the suspended scaffolding class. The four classes now are elementary, intermediate, advanced and proprietary system suspended. Elementary covers façade, modular and tube and coupler scaffolding and towers up to 33 m.

Does New Zealand use AS/NZS 1576?

Yes, as a shared reference: AS/NZS 1576 is a joint Australian and New Zealand family of scaffolding standards, described on our Australian rules page. This guide does not say which edition applies to a New Zealand job, because its current status was not verified when the page was written; confirm the edition with your supplier or scaffold designer.

Who enforces scaffolding rules in New Zealand?

WorkSafe New Zealand is the regulator. The rules sit in the Health and Safety at Work Act 2015 and the Health and Safety in Employment Regulations 1995, both administered by the Ministry of Business, Innovation, and Employment. WorkSafe's good practice guidelines on scaffolding are published at worksafe.govt.nz and are best read there for the practical detail.