Roof-edge protection by scaffold: the eaves rules in the UK, the US and Australia

In the UK, HSE recommends that the working platform of an eaves scaffold sits no more than 300 mm below the eaves, behind a guard-rail of at least 950 mm. Australia's housing code allows a catch platform up to 1 m below the roof edge on pitches up to 26°, and the US sets no distance at all.

· How the numbers are computed ·

Kwikstage scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Kwikstage around the example house, as ScaFix draws it in 3D.

What is an eaves scaffold, and how close must it be?

An eaves scaffold is a facade scaffold whose top lift is brought up to the roof edge, so its platform and guard-rail stop a roofer who slips down the slope. The platform goes as close to the eaves as the job allows: within 300 mm in the UK, 500 mm to 1 m in Australia depending on pitch.

Before you rely on this guide

This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.

Why is the eaves the place to protect on a pitched roof?

Because two of the four places HSE names for falls from a traditional pitched roof end at the eaves: falls from the eaves themselves, and slips down the slope that end over them (the others are falls into the building and from gable ends). A scaffold lift at eaves level stops both and gives a working platform.

That list is paragraph 131 of HSE's HSG33, Health and safety in roof work (fifth edition, 2020); paragraph 157 describes the eaves platform as «a good standard of edge protection, a working platform and storage space for materials». HSE's roof work page is shorter still: «You must also fit edge protection to the eaves of any roof and on terraced properties to the rear as well as the front.» A person sliding down a slope loads the edge protection far harder than one leaning on it, which is why HSG33 (paragraph 154) asks you to tell the supplier the roof pitch.

How far below the eaves may the platform be?

In the UK the working platform should be as close as possible to the eaves, and HSE recommends no more than 300 mm below eaves level. Australia's model housing code allows a catch platform up to 1 m below the roof edge on pitches up to 26°, and 500 mm above 26° or on a slippery roof.

The UK figure is paragraph 157 of HSG33, a recommendation rather than a legal limit. The roofing contractors' body NFRC (HSGS04, October 2022) asks for 300 mm before roofing work starts and accepts up to 450 mm once the finished roof build-up is allowed for. The Australian figures are section 10.4 of the model code as approved by SafeWork NSW (August 2019), which also wants the platform within 225 mm of the building face or protected on its inner edge.

CountryPlatform below the roof edgeGuard heightWhere it is written
UKAs close as possible; recommended no more than 300 mmTop guard-rail at least 950 mm, no gap over 470 mmHSG33 para 157; Work at Height Regulations 2005, Sch. 2
USNo distance set: the scaffold must catch the worker and cut the fall below 6 ftScaffold top rail 38–45 in above the platformOSHA letter, 10 Apr 2001; 1926.451(g)(4)(ii)
AustraliaUp to 1 m (pitch to 26°); up to 500 mm (over 26°, or slippery)At least 900 mm above where the roofline meets the guardrailModel code (NSW), 10.4

The table sets the three rules side by side, each from its own document; the platform figures are guidance in the UK and Australia, and the US leaves the distance to the employer.

HAKI Universal scaffolding (2.5 m bays, 1.01 m deep) around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
HAKI Universal (2.5 m bays, 1.01 m deep) around the example house, as ScaFix draws it in 3D.

How high must the guard-rail stand?

In the UK the law sets the top guard-rail at least 950 mm above the edge a person could fall from, with no gap over 470 mm. Australia measures at least 900 mm above where the roofline projection meets the guardrail. A US supported scaffold has its top rail between 38 and 45 inches.

The UK figures are Schedule 2, paragraph 3, of the Work at Height Regulations 2005, which also asks for suitable toe-boards and protection strong enough for its purpose; HSG33's Figure 23 shows the same 950 mm and 470 mm at the eaves, and NFRC adds a toe-board of at least 150 mm and a platform five boards wide. In Australia, the SafeWork NSW fact sheet repeats the 900 mm, measured 300 mm inside the roof edge on pitches over 10°, with gaps no larger than 450 mm. The US height is 29 CFR 1926.451(g)(4)(ii) for scaffolds placed in service after 1 January 2000.

What changes on a steep roof?

The steeper the roof, the more the edge protection must hold. In the UK, edge protection on a steep roof must safely contain a person sliding down it, by design or by meeting BS EN 13374. Australia adds infill panels above 26° and says that above 35° neither a guardrail nor a catch platform is enough on its own.

The UK wording is paragraph 155 of HSG33; its Appendix 7 says edge protection is chosen mainly by the gradient of the roof. The Australian thresholds are sections 10.3 and 10.5 of the model code (NSW): above 35° it recommends two or more of a work positioning system, a scaffold platform at the roof edge and a roof ladder. In the US, a steep roof is one steeper than 4 in 12 (1926.500), and from 6 feet up its workers need guardrail systems with toeboards, safety nets or personal fall arrest (1926.501(b)(11)).

Is a scaffold accepted as roof fall protection in the US?

Yes, if it reduces the fall to less than 6 feet and meets the scaffold rules of Subpart L. OSHA sets no distance to the eave: in its 2001 interpretation the scaffold is close enough if it will catch the employee in all reasonably foreseeable circumstances. A catch platform more than 10 feet up needs its own guardrails.

That is question 4 of the OSHA interpretation letter of 10 April 2001 (edited in 2012; its other answers rely on guidance OSHA later withdrew). The 6-foot trigger for roofing work is 1926.501(b)(10), (b)(11) and (b)(13) for low-slope roofs, steep roofs and residential construction, and the 10-foot guardrail rule for scaffolds is 1926.451(g)(1).

What does the extra lift add to a Kwikstage wall?

On a straight Kwikstage wall 12 m long with the eaves at 6 m, ScaFix decks the scaffold at 2.60 and 4.60 m when it plans for facade work. Turn on «Platform to roof» and ScaFix decks it at 2.00, 4.00 and 6.00 m, so the top platform sits level with the eaves.

That one setting moves the parts count in the app from 160 to 205: a third decked lift with its standards, ledgers, boards and rails. With the setting on, ScaFix puts the top platform at most 0.3 m under the wall height you enter; whether that suits your real eaves, gutter and HSE's 300 mm is checked on site, not by ScaFix. Turning on «Sloped roof» as well adds the roof-edge protection: ScaFix counts 5 roof-edge posts, 5 cantilever brackets and 4 panels, one panel per bay, for 219 parts in all, with 7 wall ties on this wall.

ScaFix plan of the 12 m wall, eaves at 6 mDecked levels (m)Parts in the appRoof-edge parts
Facade work, as drawn2.60 and 4.60160—
Platform to roof2.00, 4.00 and 6.00205—
Platform to roof and sloped roof (35°)2.00, 4.00 and 6.0021914

The rows are ScaFix's own engine runs of the same wall. The app sets the protection 1 m above the roof plane, and at a pitch of 45° to 60° it doubles the top ties.

What does ScaFix do, and what not?

ScaFix is a planning aid: it brings the top platform up to the eaves, adds the roof-edge parts and counts them before you order. It is not a structural calculation or an approval, it does not know your eaves detail or gutter, and it checks nothing against HSG33, OSHA or the Australian code. The competent person on site decides.

The scaffolding calculator gives the bays, lifts, decked levels and area of a wall in the browser; the extra lift and roof-edge parts above are ScaFix's app with a plan. How the app handles gables and roof-edge protection is shown in gables and roof-edge protection. The national rules behind the figures are in the UK scaffolding regulations and TG20, OSHA's scaffold requirements and AS/NZS 1576 for Australia; guard-rail heights elsewhere are compared in scaffold guardrail height.

Frequently asked questions

How far below the eaves should a scaffold platform be in the UK?

As close as possible, and HSE recommends no more than 300 mm below eaves level in HSG33. The roofing contractors' federation NFRC asks for 300 mm before roofing starts and accepts up to 450 mm once the finished roof build-up is allowed for. Neither figure is written into the Work at Height Regulations themselves.

Can a scaffold be used as roof edge protection in the US?

Yes. OSHA's interpretation of 10 April 2001 accepts a scaffold used by roofers if it reduces the fall distance to less than 6 feet and meets Subpart L. No distance to the eave is set: the scaffold must catch the worker in all reasonably foreseeable circumstances, and a catch platform more than 10 feet high needs guardrails.

What is the maximum distance below the roof edge for a catch platform in Australia?

Under the model housing code as approved by SafeWork NSW, no more than 1 m below the roof edge where the pitch is 26° or less, and no more than 500 mm where it is steeper or the roof is slippery. The guardrail stands at least 900 mm above the point where the roofline projection meets it.

Does the guard-rail height change on a pitched roof?

No, not in UK law: the legal minimum stays 950 mm above the edge a person could fall from, but steep roofs need edge protection able to contain a person sliding down, by design or to BS EN 13374. Australia measures at least 900 mm from the roofline projection and adds infill panels above 26°.