How to make the PDF report and share the project

Open Share in the project and press Export PDF. The report has a cover page with the project's key figures and a 3D overview, one page per wall with a 2D elevation and parts list, a total page and safety information. CSV, Excel, image, 3D model, DXF, IFC and drawing sets are in Pro.

ScaFix Basic or Pro See the plans and what they cost

What you need

  • ScaFix Basic or Pro
  • A project with walls.

Step by step

  1. Step 1 Open Share

    Press Share at the top of the panel (on a phone: Share in the toolbar). At the top is the PDF project report with the button Export PDF; below are more formats marked Pro.

    The Share tab with PDF project report and the button Export PDF, and more formats – CSV, Excel, image, 3D model, DXF, IFC model, drawing set and everything in one ZIP – marked Pro.
  2. Step 2 Export the PDF

    Press Export PDF. The report downloads, and ScaFix tells you how many pages it has.

    The Share tab after the export with the message that a PDF report of 8 pages was downloaded.
  3. Step 3 Read the cover page

    The cover page has the project name, the number of walls, the total length, the total number of parts, the unit, the 3D overview and the important safety information. If there is a warning under the 3D overview, read it before you use the report.

    Page 1 of the PDF report for House, 12 Mill Lane: 4 walls, 30 m, 390 parts, metric, the 3D overview and the safety information box.
  4. Step 4 Read the wall pages

    Each wall or wall group has a page with the system, length, wall height, number of parts, a 3D overview, a 2D elevation of the scaffold with the bay lengths and level heights, and the parts list. The last page is the total.

    Page 2 of the PDF report: HAKI Ram, 30 m, 8 m, 390 parts, the 3D overview, the 2D elevation of the scaffold and the parts list.

Under More → the project settings you can upload your logo. It appears on the report and on the toe boards in 3D.

Common mistakes

  • The report is missing a wall. Check that Scaffold on this wall is on for that wall.
  • The wrong unit. Choose metres or feet and inches under Account before you export.
  • The report sent as an approval. The report is a planning aid; the safety information on the cover page applies.