On a US job the competent person is the one name OSHA's scaffold rules keep coming back to. This page lists each duty Subpart L gives that person, the separate jobs of the qualified person and the engineer, and a walk-round and shift log you can use from tomorrow.
See the scaffold for your wall
By Ole Emil Frikstad Urstad · Checked against 29 CFR 1926 Subpart L (61 FR 46107, 30 August 1996, as amended), 1926.450(b); 1926.451(a)(6), (b)(10)–(11), (d)(3)(i), (d)(10), (d)(18), (e)(9), (f)(3)–(7), (f)(12), (g)(2), (g)(4)(xiv); 1926.452(a)(10), (b)(10), (c)(6), (i)(8); 1926.454; 29 CFR 1926.32 (eCFR, Title 29 up to date as of 27 October 2026), (f) competent person (29 October 2026) · How the numbers are computed ·

What does a competent person do on a scaffold?
Under 29 CFR 1926.451 the competent person inspects the scaffold for visible defects before each work shift, supervises and directs anyone who erects, moves, alters or dismantles it, decides whether work may go on in high winds, checks suspension ropes and connections, and trains erectors and inspectors under 1926.454(b).
The person must also have authority to fix hazards at once.
Before you rely on this guide
This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.
Who counts as a competent person under OSHA?
A competent person is someone who can recognise existing and predictable hazards on the job and who has the employer's authority to correct them straight away. Both halves matter. OSHA sets no card, course or licence for the role, so the employer names the person and must be able to show both the knowledge and the authority.
The wording is the same in the scaffold definitions of 1926.450(b) and the general construction definitions of 1926.32(f): "one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them."
In practice that rules out two common choices. A foreman who knows scaffolds but has to phone the office before closing a bay lacks the authority half. A safety manager with authority who has never inspected a frame scaffold lacks the knowledge half. Subpart L adds a third point: the person who supervises erection must be competent "qualified in scaffold erection, moving, dismantling or alteration", 1926.451(f)(7), so the knowledge has to fit the scaffold type in front of them.
Which Subpart L clauses name a competent person?
Twelve duties in 29 CFR 1926.451 and 1926.454 name the competent person, and the OSHA Scaffolding eTool lists the same set. They fall into five groups: inspecting the scaffold and its ropes, supervising erection and alteration, judging weather, evaluating suspension supports and mixed components, and training erectors. The table gives each clause.
| Clause | What the competent person must do |
|---|---|
| 1926.451(f)(3) | Inspect scaffolds and components for visible defects before each work shift and after any occurrence that could affect structural integrity |
| 1926.451(f)(7) | Supervise and direct erecting, moving, dismantling or altering, and select the experienced, trained employees who do it |
| 1926.451(f)(12) | Decide whether work may continue during storms or high winds, and then only with personal fall arrest or wind screens |
| 1926.451(g)(2) | Determine whether fall protection for erectors and dismantlers of supported scaffolds is feasible and safe |
| 1926.451(e)(9)(i) | Determine whether safe access for erectors and dismantlers is feasible or would create a greater hazard |
| 1926.451(d)(3)(i) | Evaluate direct connections of suspension scaffold outrigger beams before use and confirm the surfaces can carry the loads |
| 1926.451(d)(10) | Inspect suspension ropes before each workshift and after any occurrence that could affect them |
| 1926.451(d)(18) | Evaluate whether two-point and multi-point suspension scaffolds must be tied or secured against sway |
| 1926.451(b)(10) | Determine that a scaffold is structurally sound before components from different makers are modified to fit together |
| 1926.451(b)(11) | Determine that galvanic action between dissimilar metals will not reduce component strength below the capacity rule |
| 1926.451(g)(4)(xiv) | Inspect manila or synthetic rope used as toprails or midrails as often as needed to keep its strength |
| 1926.454(b) | Train everyone who erects, disassembles, moves, operates, repairs, maintains or inspects scaffolds |
The eTool groups these duties the same way (OSHA Scaffolding eTool FAQ). Two of them, (g)(2) and (e)(9), have applied since September 2, 1997, when the erector rules took effect.

Competent person, qualified person or engineer: who signs what?
Subpart L splits the work three ways. A qualified person designs every scaffold and trains its users. A registered professional engineer designs a short list of tall or unusual scaffolds. The competent person runs the scaffold day to day: supervising erection, inspecting before each shift and stopping work. One person may hold several roles if they meet each definition.
| Role | Duties in Subpart L | Clauses |
|---|---|---|
| Qualified person | Designs the scaffold, which is then built and loaded to that design; trains every scaffold user; designs the rigging when a single-point rope is not kept vertical; designs swing stages wider than 36 in (0.91 m) | 1926.451(a)(6), 1926.454(a), 1926.452(o)(2)(i), (p)(1) |
| Registered professional engineer | Designs pole scaffolds over 60 ft (18.3 m), tube and coupler and fabricated frame scaffolds over 125 ft (38.1 m), outrigger scaffolds, and scaffolds moved horizontally with workers on them | 1926.452(a)(10), (b)(10), (c)(6), (i)(8); 1926.451(f)(5) |
| Engineer experienced in the design | Designs the connections of masons' multi-point adjustable suspension scaffolds | 1926.451(d)(3)(i) |
| Competent person | The twelve duties in the table above | 1926.451, 1926.454(b) |
The qualified person is defined by "a recognized degree, certificate, or professional standing" or by "extensive knowledge, training, and experience" with a proven ability to solve problems in the subject, 1926.450(b). A competent person need not be qualified in that sense, and a qualified designer who never visits the site cannot do the pre-shift inspection.
What should a pre-shift inspection cover?
A pre-shift inspection is a walk-round for visible defects, done by the competent person before anyone works on the scaffold that shift, and again after a storm, an impact or an alteration. It is not a redesign. Start at the ground and work up, and close any bay that fails until it is repaired.
The rule itself only says "visible defects" (1926.451(f)(3)). The checklist below turns the rest of Subpart L into things you can see:
- Footing. Base plates on mud sills or another firm foundation, no settlement, no blocks, bricks or other unstable supports, (c)(2).
- Plumb and bracing. Legs and frames plumb, every brace in place, coupling or stacking pins in frame joints, (c)(3) and 1926.452(c)(2) to (c)(3).
- Ties. Ties, guys or braces at the 4:1 height and at the spacing in (c)(1), none removed by other trades.
- Platforms. Fully planked, gaps of 1 in (2.5 cm) or less, planks over their supports by at least 6 in (15 cm) or cleated, no split or overloaded planks, no debris, (b) and (f)(13).
- Edges. Guardrails on open sides above 10 ft (3.1 m), toprail 38 to 45 in (0.97 to 1.14 m), midrails and toeboards where people work below, (g) and (h).
- Access. A ladder, stair or integral access wherever a platform is more than 2 ft (0.61 m) above or below the access point; nobody climbing cross braces, (e)(1).
- Loads and clearances. Nothing beyond the maximum intended load or rated capacity, (f)(1); power line clearances kept, (f)(6).
- Weather and surface. No snow, ice or slippery material on the platforms, (f)(8); a wind decision recorded if it is stormy, (f)(12).
- Suspended scaffolds. Ropes inspected, (d)(10); counterweights and tiebacks in place, (d)(3).
When something fails, OSHA leaves three choices: repair or replace the weakened part at once, brace it to meet the capacity rule, or take it out of service until repaired, 1926.451(f)(4). Mark the closed bay so the next crew sees it; 1926.200(h) allows accident prevention tags as a temporary warning on defective equipment.
Does OSHA require a written scaffold inspection log?
No section of Subpart L requires a written inspection record: 1926.451, 1926.452 and 1926.454 set the inspection and training duties but no form, signature or certificate. A log is still the simplest proof that the competent person did the check before each shift, and many owners and general contractors require one by contract.
A shift log that answers an inspector's first questions fits on one page. One line per scaffold per shift:
| Date and shift | Scaffold (location, grid or elevation) | Competent person (name) | Checks done (footing, ties, platforms, rails, access, loads) | Defects found (bay and lift) | Action (repaired, braced, closed) | Status at handover (in use, partly closed, closed) | Signature |
|---|---|---|---|---|---|---|---|
| Example: Tue, day shift | North elevation, grid A to D | (name) | All six | Lift 2, bay 3: split plank | Plank replaced before use | In use | (signature) |
Keep it with the scaffold drawings, the manufacturer's instructions and, where one exists, the engineer's design. If you work in a state plan state, check whether the state adds a record duty; the federal text does not.
What does 1926.454 add for erectors and inspectors?
Section 1926.454 makes the competent person a trainer as well. Everyone who erects, disassembles, moves, operates, repairs, maintains or inspects scaffolds must be trained by a competent person in the hazards, the correct procedures for that scaffold type, its design criteria and its maximum intended load, and retrained when the site, the equipment or their work shows a gap.
That second tier sits on top of the user training in 1926.454(a), which a qualified person gives to everyone who works on a scaffold: electrical, fall and falling-object hazards, the procedures for the fall protection and falling object protection systems in use, the proper use of the scaffold and its load capacity. Retraining under 1926.454(c) is required in at least three cases: changes at the worksite, changes in the scaffold or protective equipment, and work that shows the employee has not kept the skill. Note that the standard names topics, not hours or certificates; a training record is good practice, not a Subpart L rule.
Where do employers go wrong with the competent person?
Most failures come from treating the role as a title instead of a job: a competent person who is not on site when the shift starts, a name without authority to close the scaffold, an inspection skipped after wind or an alteration, and erectors never trained under 1926.454(b) for the scaffold type in use.
Scaffolding is a recurring enforcement topic: on OSHA's preliminary top 10 list for fiscal year 2026, updated October 5, 2026, the construction scaffold standard 1926.451 is the 4th most cited federal standard. Four habits close most of the gaps:
- Name one competent person per scaffold and shift, and make sure that person can close it without asking anyone.
- Inspect after events, not just at shift start. High winds, a vehicle strike, a removed tie or an added bracket all trigger (f)(3).
- Match competence to the type. A frame scaffold inspector is not automatically competent on a swing stage, where rope inspection under (d)(10) applies.
- Keep the design on site. The competent person checks the scaffold against the qualified person's design and the manufacturer's instructions; without them the walk-round has nothing to compare with.
The full Subpart L rule set, from capacity to guardrail heights, is in OSHA scaffolding requirements; suspended scaffolds have their own page, suspended scaffolding.
Where ScaFix fits, and where it does not
ScaFix is a planning tool, not a competent person and not a design. It turns wall dimensions into a 3D scaffold and a parts list for many US and European systems, which gives the competent person a drawing of what should be standing: bays, lifts, decks, rails and the planned ties.
It does not inspect anything, run an OSHA compliance check, produce the qualified person's design or keep the shift log. The four times capacity rule, the ties and the footing remain decisions for the qualified person and the competent person on site, as the methodology page explains.
Planning information only, not structural approval and not legal advice. Under 29 CFR 1926.451(a)(6) a qualified person designs the scaffold, under (f)(3) and (f)(7) a competent person inspects it before each shift and supervises its erection, and a state plan may add to the federal rules.
Frequently asked questions
Does OSHA require competent person certification for scaffolding?
No. Subpart L defines the competent person by ability and authority, 1926.450(b), and sets no card or certificate. Employers usually document the person's scaffold training, which is good evidence, but the federal standard does not require a certificate. The training duty in 1926.454 likewise names topics, not hours or certificates.
Can a competent person also be the qualified person?
Yes, if the same person meets both definitions. The roles stay separate: the qualified person designs the scaffold under 1926.451(a)(6), and the competent person supervises erection and inspects it before each shift under (f)(7) and (f)(3). A qualified designer who never visits the site cannot do the pre-shift inspection.
An employer must select a ___ person to oversee the safe use of scaffolding: which?
A competent person. Under 29 CFR 1926.451(f)(7) a scaffold is erected, moved, dismantled or altered only under the supervision and direction of a competent person, who also selects the experienced, trained employees who do that work. Under (f)(3) a competent person inspects the scaffold for visible defects before each work shift.
Does the competent person have to work for the scaffold contractor?
No, not under Subpart L, which does not say. It places the duties on the employer and defines the competent person by the ability to spot hazards and the authorization to take prompt corrective measures, 1926.450(b). Whoever fills the role needs that authority over the scaffold in question.
How often must a competent person inspect a scaffold?
Before each work shift and after any occurrence that could affect structural integrity, under 1926.451(f)(3). Suspension ropes follow the same rhythm under (d)(10). There is no fixed weekly interval as in the UK. Subpart L requires no written record either, but a shift log is the simplest proof that each check was done.
Who trains scaffold erectors under OSHA?
A competent person, under 1926.454(b), covering scaffold hazards, the correct procedures for that type, the design criteria and the maximum intended load. Ordinary scaffold users are trained by a qualified person under 1926.454(a), and retraining under 1926.454(c) follows changes at the worksite, in the scaffold or in the employee's work.
Does OSHA require scaffold tags?
Not in Subpart L, which has no tag rule. Status tags are a common site practice, and 1926.200(h) requires accident prevention tags as a temporary warning on defective equipment, such as a closed bay. Mark the closed bay so the next crew sees it, and note it in the shift log.
Sources
Primary sources used for this article, with the date each was read.
- 29 CFR 1926.450, Scope, application and definitions (competent person, qualified), via Cornell LII (read 29 October 2026)
- 29 CFR § 1926.32, Definitions (paragraph (f), competent person), eCFR (Title 29 up to date as of 27 October 2026) (read 29 October 2026)
- 29 CFR 1926.451, General requirements for scaffolds, via Cornell LII (read 29 October 2026)
- 29 CFR 1926.452, Additional requirements applicable to specific types of scaffolds, via Cornell LII (read 29 October 2026)
- 29 CFR § 1926.454, Training requirements, eCFR (Title 29 up to date as of 27 October 2026) (read 29 October 2026)
- OSHA Scaffolding eTool: Frequently Asked Questions (when a competent person, a qualified person or an engineer is required) (read 29 October 2026)