Frame vs ringlock scaffolding: 16 US systems on one house

Sixteen scaffold systems sold in the US, from Waco frames to SafLock rosettes, put on one small gabled house, 37 ft 5 in by 17 ft 5 in with 14 ft 9 in eaves, and counted by the same rules. The gaps between them come from frame widths, bay lengths in feet and each maker’s bracing and tie rules, which this page traces back to the manuals.

· How the numbers are computed ·

Waco Frame scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
ScaFix render of the 37 ft 5 in × 17 ft 5 in (11.4 × 5.3 m) example house with a Waco frame scaffold on all four walls.

Is frame or ringlock scaffolding better for a US house?

For a plain house wall, frame scaffolding. On the same 37 × 17 ft house the frame systems need 318 to 370 pieces, the ringlock, cuplock and wedge systems 533 to 693. A frame welds two posts and a bearer into one part; modular systems spend their extra pieces on nodes for corners, height changes and industrial loads.

Which US house and which 16 systems?

One small gabled house carries every system: 37 ft 5 in long and 17 ft 5 in deep (11.4 × 5.3 m), eaves at 14 ft 9 in (4.5 m), ridge at 19 ft 8 in (6 m). It is the same house the ScaFix system pages use, wrapped on all four sides, with no setting changed from the default. Because each run carries on round its corner, the scaffold is a little longer than the walls it covers. The inputs are the same for every system; where ScaFix has no maker’s rule for bays, bracing or ties, the text says so.

The comparison covers every US system in the ScaFix catalogue that produces a facade parts list: eight frame systems and eight modular ones. StepUp Shoring is left out because it is a shoring system for carrying loads, not an access scaffold. What the families are and where else they are used is explained in types of scaffolding; the European cuplock, ringlock and frame comparison on the same house is in cuplock vs ringlock vs frame.

How many parts does each US frame scaffold need?

Frame systemFrame widthBaysFrames + top-lift postsDeck unitsGuardrails + end railsToe boardsCross bracesTies + tie fittingsBase jacksPiecesScaffold area
Waco Frame5 ft (1.52 m)1750 + 133451 + 16346822 + 22423522,364 ft² (220 m²)
WACO Narrow Frame2 ft 3⅝ in (0.70 m)1644 + 163248 + 8326432 + 32403482,382 ft² (221 m²)
WACO RED Box Frame5 ft (1.52 m)1656 + 103652 + 20367224 + 24403702,156 ft² (200 m²)
WACO RED Access Frame5 ft (1.52 m)1648 + 123248 + 16326424 + 24403402,382 ft² (221 m²)
StepUp Frame & Brace3 ft (0.91 m)1652 + 123450 + 12346824 + 24403502,256 ft² (210 m²)
Metaltech Saferstack5 ft (1.52 m)1452 + 63044 + 20306020 + 20363182,222 ft² (206 m²)
Metaltech Saferstack Mason5 ft (1.52 m)1452 + 83246 + 20326420 + 20363302,101 ft² (195 m²)
Metaltech Saferstack Ladder Arch5 ft (1.52 m)1452 + 63044 + 20306020 + 20363182,222 ft² (206 m²)

Each row adds up to its pieces cell. The frame column counts full frames and the short 1 m (3 ft 3 in) frames that make up height; the guardrail column includes a rail in the bottom field of every bay, a ScaFix stiffening rule the methodology explains. Scaffold area is the elevation from the ground to the top of the scaffold, overhang included.

Bil-Jax Ring Lock scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
The same house planned with Bil-Jax Ring Lock: standards, ledgers, decks and guardrails on every side.

How many parts do the US ringlock, cuplock and wedge systems need?

Modular systemWidthBaysStandardsLedgers + transomsDeck unitsGuardrails + end railsToe boardsBracesTies + fittings (+ couplers)Base jacksPiecesScaffold area
Bil-Jax Ring Lock2 ft 5 in (0.73 m)161201563396 + 8324020 + 20405652,238 ft² (208 m²)
BrandSafway SafLock3 ft 9 in (1.15 m)2014419241120 + 16404026 + 26486932,243 ft² (208 m²)
StepUp RingLock2 ft 5 in (0.73 m)161201563396 + 8324020 + 20405652,238 ft² (208 m²)
Catari US Ringlock2 ft 5 in (0.73 m)161201563396 + 832820 + 20405332,235 ft² (208 m²)
AT-PAC Ringlock2 ft 5 in (0.73 m)161201563396 + 8321229 + 29 + 8405632,235 ft² (208 m²)
StepUp Cuplock4 ft (1.22 m)161201563396 + 16324020 + 20405732,238 ft² (208 m²)
Excel Modular Scaffold4 ft (1.22 m)161201563396 + 16324024 + 24405812,310 ft² (215 m²)
Safway Systems Scaffold4 ft (1.22 m)161201563396 + 8321620 + 20405412,454 ft² (228 m²)

Here too every row sums to its total. Most of the modular lists share the same skeleton, 120 standards and 156 ledgers and transoms over 16 bays, so the totals split on three things: bracing, ties and, for SafLock, the bay grid.

Why do US frames need half the pieces?

A frame is two posts and a bearer welded into one part. Waco’s RED frames are 5 ft wide and 6 ft 7 in tall, and its narrow frames 2 ft 3⅝ in wide; the Waco name goes back to 1945, and BrandSafway is now the exclusive supplier (WACO RED brochure ORN1701, pp. 2–4). StepUp lists walk-through frames 3 ft, 42 in and 5 ft wide at 6 ft 4 in and 6 ft 7 in (StepUp Frame & Brace catalog, p. 6). On this house that means 44 to 56 frames (58 to 66 with the top-lift posts) where a ringlock needs 120 standards plus 156 ledgers and transoms.

Frames spend their pieces on bracing instead. Under 29 CFR 1926.452(c)(2) frames and panels must be braced by cross, horizontal or diagonal braces, and under (c)(3) joined vertically by coupling or stacking pins. ScaFix puts a cross brace on both faces of every bay and lift, which is why Waco’s 17 bays on two lifts come to 68 braces. Waco Frame also has the most bays, 17, because ScaFix plans it on 10, 7 and 5 ft spacings only; the others add 8 ft bays and fit each wall with fewer. Waco also sells 8 ft cross braces (ORN1701, p. 7); ScaFix’s Waco Frame entry does not use them yet, which costs it one bay and 4 braces.

Frame height sets the deck levels. The 6 ft 7 in Waco frames put the decks at 8 ft 2 in and 14 ft 9 in (2.49 and 4.5 m); the 5 ft tall Saferstack Mason frames at about 7, 12 and 17 ft (2.12, 3.65 and 5.17 m), the top one on the gables.

Why does SafLock need 20 bays?

SafLock is a rosette system: BrandSafway says each rosette holds up to eight connections, with no loose nuts, bolts or clamps, and that it is used throughout Canada (BrandSafway, SafLock). Its count is high for a geometric reason. ScaFix plans SafLock on 3.05, 2.13, 1.57 and 1.15 m ledgers (10 ft, 7 ft, 5 ft 2 in, 3 ft 9 in) and no 8 ft bay, so each long wall takes six bays and each gable four: 20 bays against 16. Four more bays add 24 standards, 36 ledgers and transoms, 24 guardrails and 8 base jacks, before anything else differs. Even SafLock’s narrowest width, 1.15 m (3 ft 9 in), is wider than the 0.73 m rosette systems.

What separates the other modular systems?

The node is the main design difference:

  • Rosettes. AT-PAC, headquartered in Roswell, Georgia, puts a rosette every 50 cm with four small holes at 90° and four larger ones for other angles, and says its Ringlock has DIBt certification (AT-PAC Ringlock). StepUp prints its RingLock horizontals in feet and millimetres, 10 ft = 3,050 mm (StepUp RingLock catalog, p. 5). Bil-Jax, which calls itself an American-made scaffolding manufacturer (Bil-Jax), sells Ring Lock horizontals by the foot, so ScaFix plans exact feet; on this house Bil-Jax and StepUp RingLock give the same totals with slightly different part lengths.
  • Cups. Excel verticals carry cups every 5.75 in (Excel technical manual, Rev. AL, PDF p. 15); StepUp also sells a cuplock line (StepUp Cuplock catalog).
  • Wedges in ring sets. BrandSafway’s Systems Scaffold hooks each horizontal or diagonal onto ring sets placed every 21 in up the post and locks it by hammering home a wedge (Systems Scaffold guide ORN 210, pp. 4–5). Its 9 ft and 6 ft bays overrun the walls a little more, hence the largest area.

The brace column is where the modular lists part company. Excel asks for bracing on one bay for every 30 ft of scaffold, generally every fourth bay, on the inside and outside rows, from the bottom to within 10 ft of the top (technical manual, PDF pp. 46–47). ScaFix applies a similar end-bay and every-fourth-bay rule on both faces to SafLock, Bil-Jax and StepUp, 40 braces each. AT-PAC is braced every fourth bay from the Doka Ringlock documents, which cover the same system (12), Safway Systems gets 16, and Catari, for which ScaFix has no maker’s rule, falls back on a general ringlock rule with 8. Check the bracing against the manual of the system you actually rent.

How many planks does a deck unit mean?

ScaFix counts one deck unit per bay and level. Turn it into planks with the width you stock: Metaltech recommends three 19 in platforms side by side on its exterior frames, a 57 × 84 in working deck rated 75 lb/ft² (Metaltech, 2022), so 30 Saferstack deck units mean about 90 planks of the right length. StepUp’s RingLock catalog lists steel planks 9 in and 12.5 in wide (pp. 10–11). Whatever the plank, 1926.451(b)(1) requires each working level to be fully planked with gaps of no more than 1 in, and the SSFI guidelines printed in Waco’s brochure ask timber planks to overlap at least 12 in and run 6 in beyond the centre of the support, or be cleated (p. 20).

Why do the tie counts differ?

OSHA ties a supported scaffold once its height passes four times its base width, then every 20 ft on scaffolds 3 ft wide or less, 26 ft on wider ones, at no more than 30 ft along and with the top tie no further than the 4:1 height from the top; the full rule is in OSHA scaffolding requirements. What moves the counts on this house:

  • Width. A 2 ft 3⅝ in WACO Narrow frame reaches 4:1 at 9 ft 2½ in, so it gets 32 ties against 22 on the 5 ft Waco Frame. StepUp Frame & Brace, at 3 ft, falls in the 20 ft class.
  • Bay layout, not a different grid. ScaFix ties all three 5 ft Waco frames on the same planning grid, rows about 13 ft (4 m) apart and ties about 20 ft (6 m) apart along the run, closer than the regulation. Waco Frame’s 22 against 24 for the RED frames comes from where its bays and wall ends fall.
  • AT-PAC. Doka’s Ringlock is based on the AT-PAC Ringlock system and cites its DIBt approval Z-8.22-992 (Doka Ringlock user information, p. 8; Z-8.22-992), and Doka has owned AT-PAC outright since 2023 (Doka). ScaFix follows Doka’s anchor grid: 8 m offset over height plus at least one V-anchor every five bays (p. 75), hence 29 ties and 8 couplers.
  • Excel. ScaFix takes Excel’s 2 ft bearer as the base, which brings the first 4:1 tie down to 8 ft, hence 24.
  • No maker’s rule. For Bil-Jax, SafLock and Catari, ScaFix has no published tie rule from the maker and applies its own planning grid.

Sheeting, which needs far more ties, is covered in scaffold ties and anchoring.

Can you mix brands on one scaffold?

Only within narrow limits. 1926.451(b)(10) bars mixing components from different manufacturers unless they fit together without force and the user keeps the structure sound, and the SSFI guidelines in Waco’s brochure say frames and components of different makers shall not be intermixed. Identical totals for Bil-Jax and StepUp RingLock do not make their parts interchangeable.

Which system for a house, a plant or an interior job?

  • Houses and low-rise facades: a frame system, with the fewest pieces to haul and count. The rails still follow the 38 to 45 in toprail rule, see scaffold guardrail height.
  • Plants, refineries, round tanks, heavy loads: a modular system. Excel and Systems Scaffold aim at plant work with tube-and-clamp tie-offs to structural steel, and the rosette systems take any angle.
  • Small interior jobs: what people search for as baker scaffolding is a small rolling platform rather than a facade system; Bil-Jax lists its Pro-Jax at 4 ft high, 6 ft long and 29 in wide. Rolling units follow the tower rules in mobile scaffold towers.

How ScaFix fits in

ScaFix is a planning tool that turns wall dimensions or a PDF drawing into a 3D scaffold and a parts list for many systems, including all sixteen here. The Waco Frame, Bil-Jax Ring Lock and SafLock pages show the full lists. It is not a structural design.

This is planning information, not structural approval. The manufacturer’s instructions and 29 CFR 1926 Subpart L, or your state plan, decide how a scaffold is built, braced and tied; a qualified person designs it under 1926.451(a)(6), and a competent person inspects it before each work shift under 1926.451(f)(3).

Frequently asked questions

What is the difference between frame and ringlock scaffolding?

A frame is a prefabricated welded unit set in a line and joined with cross braces and coupling pins. Ringlock builds the same bay from loose standards, ledgers and braces wedged into rosettes, which takes more pieces but fits corners, curves and odd heights.

How many planks go on a 5 ft wide frame?

Metaltech recommends three 19 in platforms side by side for a 57 in deck on its exterior frames. With timber or other planks, count how many fill the width without gaps over 1 in, as 1926.451(b)(1) requires.

Can I use Waco cross braces on another brand of frame?

Only if the parts fit together without force and the scaffold stays structurally sound, under 1926.451(b)(10). The SSFI guidelines in Waco’s brochure advise against intermixing makers altogether.

Which US system has the most parts on a small house?

BrandSafway SafLock, with 693 pieces here, because its bay lengths skip 8 ft and the walls need 20 bays instead of 16. Metaltech Saferstack and Saferstack Ladder Arch have the fewest, 318 each.

Is baker scaffolding the same as frame scaffolding?

No. Baker scaffolding is a small rolling platform for interior work, while frame scaffolding is stacked frame by frame along a facade and tied to the building.