Which software do scaffolding contractors in the US use?
Match the software to the task: a frame or ringlock layout with a component count from wall dimensions, no CAD needed, is ScaFix's job (browser and iPhone, 115 systems); a 3D model with a bill of materials, Avontus Designer or Scaffcalc; rental billing and inventory, Avontus Quantify; modelling inside SketchUp or Tekla, ScaffPlan. This page is published by ScaFix.
US scaffolding contractors use software for four jobs: designing the scaffold, listing the gear, running rental and stock, and handling the job on site, all under OSHA 29 CFR 1926.451. ScaFix, which publishes this page, is one of the tools compared: it lays out frame and system scaffolds in 3D from a building's wall dimensions and counts every component.
By Ole Emil Frikstad Urstad · How the numbers are computed ·

Method and disclosure
Every product claim below comes from the vendor's own website as it read on 24 November 2026; where a site gave no answer, the table says «not stated». Nothing was trialled, no user ratings were gathered, and no listing was paid for. ScaFix wrote this page and sits in the top row of the table, so read that row as the publisher's own description. Prices are not quoted.
Two things shape the US market. Frame scaffolds are common on house and light commercial work next to ringlock and other system scaffolds, so the software has to handle US frame heights and bay lengths in feet. And OSHA's supported-scaffold rule, 29 CFR 1926.451, applies whatever software drew the plan.
Which tools are on the US shortlist?
Six products qualified: each vendor's site describes scaffold design, a bill of materials, rental or inspections, and each can be bought in or delivered to the US. For each one the table gives the vendor's own summary, the platform, and where the company says it is based, with «not stated» where the site was silent.
| Product | Vendor's own summary | Platform | Base, as stated |
|---|---|---|---|
| ScaFix (this page's publisher) | 3D layout of frame and system scaffolds from wall dimensions or a PDF plan, with every component counted, for 115 systems including Waco frames and BrandSafway SafLock | Web browser on PC, Mac and Android; iPhone and iPad apps | — |
| Avontus Designer | «Detailed 3D scaffold models» with a bill of materials; reads IFC, PDF and AutoCAD files | Downloaded with a serial number; OS not stated | Spring, Texas (about page) |
| Avontus Quantify | Scaffold inventory and rental: equipment on and off rent, stock levels, every job from start to finish | Not stated; Quantify Web for phones and tablets | Spring, Texas |
| Scaffcalc | Drag-and-drop 3D design and one-click material lists | Phone, tablet or desktop, no installation | Gothenburg, Sweden; no US office mentioned |
| ScaffPlan | Design, sales and estimating, field operations, gear lists generated from the model | SketchUp and Tekla; Revit to follow | ScaffPlan Pty Ltd; no US office mentioned |
| BrandSafway BrandNet | BrandSafway's «proprietary software application», which «provides design, estimating and planning services» for industrial access | Not stated | Atlanta, Georgia |

Which tool fits which US scaffolding job?
On a house or a light commercial facade in frames or ringlock, ScaFix sets out the scaffold from the wall dimensions and counts the components with no CAD seat. When a job needs a model from IFC or AutoCAD files, rental billing, or SketchUp and Tekla, ScaFix gives way to Avontus Designer, Scaffcalc, Avontus Quantify or ScaffPlan.
Four kinds of firm, four answers:
- Residential and facade contractor. What the job needs is a layout, a component count and a quote. ScaFix draws one elevation or the whole house in Waco frames or ringlock and counts it; for a single wall in feet and inches there is the scaffolding calculator in feet. A CAD-based modeller is more than this work calls for.
- Industrial or complex-scaffold designer. Here the building model drives the scaffold, so a modeller that imports it beats ScaFix's wall-by-wall approach: Avontus Designer takes IFC, PDF and AutoCAD, ScaffPlan runs in Tekla and SketchUp, and Scaffcalc works in a browser.
- Rental yard. Billing for time on rent and tracking stock is a separate discipline, and Avontus Quantify is built around it. ScaFix only tells you what a planned scaffold needs.
- Plant or refinery work. BrandSafway describes BrandNet as its proprietary software application, providing design, estimating and planning services for industrial access; its page does not say whether other firms can license it.
What does ScaFix count for a 40 ft frame scaffold?
On a straight wall 40 ft (12.19 m) long and 20 ft (6.10 m) high in Waco frames, ScaFix sets out 4 bays of 10 ft (3.05 m), decks 2 levels and counts 93 components, including 10 wall ties. Put the same wall in BrandSafway SafLock, a ringlock system, and the count is 152.
The engine behind both numbers applies each manufacturer's bay lengths, lift heights and tie spacing, as the ScaFix app does when it plans a whole building. Treat them as estimates for planning and quoting: the manufacturer's instructions and a competent person govern the erected scaffold. Frame, ringlock and the other US systems are compared in the US scaffold systems guide; the feet calculator returns bays, lifts, decked levels and scaffold area for your own wall, and the full component list is in the ScaFix app.
Which OSHA rules must a scaffold plan meet?
Four requirements of 29 CFR 1926.451 shape a supported scaffold plan: platforms at least 18 in (46 cm) wide, ties once height passes four times the base width, fall protection above 10 ft (3.1 m), and a competent person's check before every shift. Software draws the scaffold; it signs none of that off.
| Requirement | In short | Paragraph |
|---|---|---|
| Decking | Working platforms planked or decked fully between the front uprights; 18 in (46 cm) wide for most scaffold types | (b)(1), (b)(2) |
| Restraint | Guying, tying or bracing once height exceeds four times the minimum base width | (c)(1) |
| Tie intervals | 20 ft (6.1 m) apart vertically on scaffolds up to 3 ft (0.91 m) wide, 26 ft (7.9 m) on wider ones, and at most 30 ft (9.1 m) apart horizontally | (c)(1)(ii) |
| Falls | Protection for workers more than 10 ft (3.1 m) above a lower level | (g)(1) |
| Guardrail height | Top rail 38–45 in (0.97–1.14 m) above the platform on scaffolds made or first used after 1 January 2000 | (g)(4)(ii) |
| Inspection | A competent person looks for visible defects ahead of each shift | (f)(3) |
When ScaFix counts ties it follows each manufacturer's rule; on Waco frames its grid, at most 4 m (13 ft 1 in) up and 6 m (19 ft 8 in) along, is tighter than OSHA's intervals in the table. It remains a planning aid and does no OSHA compliance check. The rule in full is in OSHA scaffolding requirements, and the inspection duty in the competent person guide.
Where do US scaffolders get training and industry guidance?
From the trade association and the manufacturers. The Scaffold & Access Industry Association, of North Kansas City, Missouri, gives its vision as leading the advancement and promotion of safety in the scaffold and access industry. Planning software adds nothing to a crew's qualifications: it shows where the components go, and trained people still erect and inspect the scaffold.
The association is at saia.org. Each manufacturer publishes instructions for its own system, and it is those instructions, not a program's default, that set the ties and bracing.
What does ScaFix not do?
ScaFix lays out system and frame scaffolds and counts them. It bills no rentals, runs no yard, engineers no suspended or industrial scaffold and certifies nothing under OSHA. Rental firms pair it with rental software, and a scaffold outside the manufacturer's standard configurations goes to a qualified engineer.
Product descriptions reflect the vendors' websites on 24 November 2026. ScaFix publishes this page and is one of the products in it; ScaFix is a planning aid, not an engineered design or an OSHA compliance check.
Frequently asked questions
What is the best scaffolding software for a small US contractor?
The right tool follows what a small contractor spends the day on, so choose by that: ScaFix, this page's publisher, for a 3D layout and component count from wall dimensions without CAD; Avontus Designer for a 3D model from IFC or AutoCAD files; Avontus Quantify for rental and inventory. Facade quoting seldom needs a full CAD design suite.
Does ScaFix plan US frame scaffolds in feet?
Yes. Waco frames and other US frame systems are in ScaFix's catalogue, and the calculator in feet accepts input such as 40 ft or 12' 6". A wall 40 ft long and 20 ft high in Waco frames comes out at 4 bays of 10 ft, with 93 components counted in the ScaFix app.
Does scaffolding software check OSHA compliance?
No. Not one product on this page claims to certify a scaffold under OSHA 29 CFR 1926.451. ScaFix counts ties on each manufacturer's grid, which on Waco frames is tighter than OSHA's spacing, yet a competent person still inspects before every shift and an engineer designs anything outside the manufacturer's configurations.
Which software handles scaffold rental and inventory?
Avontus Quantify, according to its own site: it tracks equipment going on and off rent, stock, and each job from start to finish, and Quantify Web runs on phones and tablets. ScaFix, which publishes this page, counts what a planned scaffold needs but neither bills rentals nor manages a yard.
Sources
Primary sources used for this article, with the date each was read.
- OSHA, 29 CFR 1926.451 General requirements (scaffolds) (read 24 November 2026)
- Avontus Designer product page (read 24 November 2026)
- Avontus Quantify product page (read 24 November 2026)
- Avontus, about (offices) (read 24 November 2026)
- Scaffcalc home page (read 24 November 2026)
- ScaffPlan home page (read 24 November 2026)
- BrandSafway BrandNet, advanced scaffold design (read 24 November 2026)
- Scaffold & Access Industry Association (read 24 November 2026)