When a German contract includes the VOB, scaffold work is measured by ATV DIN 18451, part of VOB/C. Its rules differ from a simple wall area in ways that change the invoice, and buyers from abroad often meet them for the first time on a German site.
See the scaffold for your wall
By Ole Emil Frikstad Urstad · How the numbers are computed ·

How is scaffolding measured under DIN 18451?
Facade scaffolds are billed in square metres, separated by type, agreed use, and load and width class. The 2023-09 edition measures the technically required dimensions at the outer faces of the scaffold (Bauprofessor). Openings such as windows are not deducted, a single-bay scaffold counts at least 2.5 m long, and hire is billed per started week.
Before you rely on this guide
This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: editorial and review policy.
When does DIN 18451 apply?
When the contract makes the VOB part of it. ATV DIN 18451 is the general technical specification for scaffold work in VOB Part C, current edition 2023-09, covering erecting, altering and dismantling scaffolds and making them available for use (DIN Media). Without the VOB, the contract's own measurement rules decide, and many German firms quote that way.
The Bavarian chamber of architects notes that disputes about scaffold measurement are frequent in practice, and that the tender and its agreed unit prices count alongside the standard (ByAK, 2020).
Which units does DIN 18451 use?
Three, by the kind of scaffold. Facade scaffolds are billed in square metres, room scaffolds in cubic metres and support scaffolds in metres, and the billing is always separated by scaffold type and agreed use. For standing scaffolds with lengthwise working levels, the 2023 edition adds a separation by load and width class.
| Scaffold | Unit | Separated by | Clause |
|---|---|---|---|
| Facade scaffold (Fassadengerüst) | m² | Type, agreed use, load class and width class | 0.5.1 |
| Room scaffold (Raumgerüst) | m³ | Type and agreed use | 0.5 |
| Support scaffold (Traggerüst) | m | Type and agreed use | 0.5 |
| Erecting, altering and dismantling | billed separately | 5 | |
| Making available for use (Gebrauchsüberlassung) | per started week, unless another period is agreed | General scaffolds and support scaffolds | 5.4.3 |
The units and clauses follow the excerpts on Bauprofessor; the binding text is the standard.

How are length and height measured?
At the outer faces of the scaffold, not at the wall. The 2023-09 edition takes the technically required dimensions at the outer faces of the scaffold structure, whether taken from a drawing, a digital model or on site. The height runs from the scaffold's standing surface upwards; the freely readable excerpt breaks off before the end of that rule.
The 2020 article from the Bavarian chamber of architects shows why the purpose matters. It describes a working scaffold measured on the scaffolded area, with the roof overhangs setting the length when roof work is done from it, and a protective scaffold measured on its own outer dimensions. Since 2023 the outer faces of the scaffold are the stated basis.
What is not deducted, and what are the minimums?
Openings, whatever their size. Clause 5.3.1 of the 2023 edition passes over openings for windows, doors, passages and building or plant parts, and also bridged parts such as extensions, balconies and oriels, as long as the load is not carried into the building; gaps of up to 2.5 m between dormers count too. Clause 5.4.1 sets a minimum length.
For small areas and single-bay scaffolds, the length is counted as at least 2.5 m when billing by area. ScaFix's engine shows what that means for one Layher Blitz bay of 1.57 m on a 6 m wall: it has 8 m² of scaffold area by ScaFix's rule. Counted at 2.5 m long, the same scaffold bills about 2.5 × 6 = 15 m².
How is the hire period counted?
Per started week. Clause 5.4.3 bills the hire separately for general and support scaffolds, each with its time unit: per started week, or per started unit of another agreed period such as a month. Support scaffolds count in calendar days. The period ends with the client's written release, but no earlier than three working days after the contractor receives it.
How a quote sets the base hire period and prices each extra week, including the 2007 Celle judgment on the four-week base period, is in the German guide to scaffold quoting software.
Which work is included, and which is extra?
DIN 18451 lists inspecting, maintaining and repairing the scaffold for technical wear as ancillary work that is not billed separately, while clearing the ground for the scaffold's footprint is a special service that must be listed in the tender. Erecting and dismantling scaffolds for other contractors' work is also a special service.
Other trades have their own rule. In plastering, painting and similar trades (DIN 18350, 18363 and 18366), scaffolding is ancillary work only where the surface is no more than 3.50 m above the standing surface; the 2016 VOB replaced the older 2 m rule with this criterion. Concrete and masonry work (DIN 18330, 18331) include working and protective scaffolds without a height limit.
What should a buyer check on a DIN 18451 invoice?
Whether the agreed rules were applied, position by position. An invoice can depart from the standard in four places: where the scaffold was measured, whether openings were deducted, how short single-bay scaffolds were counted and when the weeks of hire ended. The five questions below follow the clauses cited above:
- Is the VOB part of the contract, and does the tender agree anything else in detail?
- Are scaffold types and uses billed in separate positions, with load and width class for facade scaffolds?
- Was the area measured at the outer faces of the scaffold, without deducting windows?
- Is a single-bay scaffold shorter than 2.5 m counted at 2.5 m, and a longer one at its real length?
- Do the hire weeks end three working days after the written release, at the earliest?
The scaffold area itself, wall by wall, is explained in calculating scaffold area.
Planning information, not legal advice. The rules are summarised from published excerpts of ATV DIN 18451; the binding wording is the standard and the contract, and ScaFix's area follows its own rule, not this standard.
Frequently asked questions
Are windows deducted from the scaffold area under DIN 18451?
No. Clause 5.3.1 passes over openings such as windows, doors and passages whatever their size, as long as the load is not carried into the building. Bridged parts such as extensions, balconies and oriels are passed over too, and gaps of up to 2.5 m between dormers count.
What is the minimum length billed for a small scaffold?
2.5 m. For small areas and single-bay scaffolds, clause 5.4.1 counts the length as at least 2.5 m when billing by area. The 2023-09 edition measures the technically required dimensions at the outer faces of the scaffold, and the area is billed in square metres by type, agreed use, and load and width class.
How is scaffold hire billed under DIN 18451?
Per started week, or per started unit of another agreed period. It ends with the written release, but no earlier than three working days after the contractor receives it. Support scaffolds count in calendar days, and clause 5.4.3 bills the hire separately for general and support scaffolds.
Does DIN 18451 apply to every German scaffold contract?
No, only when the VOB is part of the contract. Otherwise the contract's own measurement rules apply. ATV DIN 18451 is part of VOB/C, and buyers from abroad often meet its rules for the first time on a German site. Other trades have their own rules, such as the 3.50 m limit in plastering and painting.
Sources
Primary sources used for this article, with the date each was read.
- DIN Media: DIN 18451:2023-09, VOB Vergabe- und Vertragsordnung für Bauleistungen, Teil C: ATV Gerüstarbeiten (read 25 October 2026)
- Bauprofessor: Gerüste (Abrechnung nach ATV DIN 18451, Gebrauchsüberlassung, Nebenleistungen) (read 25 October 2026)
- Bauprofessor: Gerüstarbeiten (Auszüge ATV DIN 18451, Ausgaben 2016-09 und 2023-09) (read 25 October 2026)
- Bayerische Architektenkammer: Rechenspiele im Gerüstbau, Deutsches Architektenblatt 09/2020, S. 10–11 (pdf) (read 25 October 2026)