Manufacturer comparison
StepUp Scaffold systems compared head to head
Every pair of StepUp Scaffold systems in the ScaFix catalogue: which bay lengths and depths they share, which only one of them has, and what the planning engine counts for each on the same example house, parts group by parts group.
By Ole Emil Frikstad Urstad · How the numbers are computed ·

How do the StepUp Scaffold systems differ?
ScaFix has 3 StepUp Scaffold systems: StepUp RingLock, StepUp Cuplock and StepUp Frame & Brace. On the same example house (11.4 m × 5.3 m), StepUp Frame & Brace needs 350 parts and StepUp Cuplock 573. All of them offer the 1.52 m bay length.
Pair by pair: bay lengths and depths
Each pair of StepUp Scaffold systems, from the catalogue the engine plans with. «Only in» lists the bay lengths one system has and the other lacks; the last column is the parts total of each on the example house.
| Pair | Type | Shared bay lengths | Only in the first | Only in the second | Shared depths | Parts on the house |
|---|---|---|---|---|---|---|
| StepUp Cuplock – StepUp Frame & Brace | Different types: Cuplock / Frame | 3.05 m, 2.44 m, 2.13 m, 1.83 m, 1.52 m, 1.22 m | 0.91 m | – | 1.52 m | 573 / 350 |
| StepUp RingLock – StepUp Cuplock | Different types: Ringlock (rosette) / Cuplock | 1.52 m | 3.05 m, 2.44 m, 2.13 m, 1.83 m, 1.22 m, 0.91 m | 3.05 m, 2.44 m, 2.13 m, 1.83 m, 1.22 m, 0.91 m | – | 565 / 573 |
| StepUp RingLock – StepUp Frame & Brace | Different types: Ringlock (rosette) / Frame | 1.52 m | 3.05 m, 2.44 m, 2.13 m, 1.83 m, 1.22 m, 0.91 m | 3.05 m, 2.44 m, 2.13 m, 1.83 m, 1.22 m | – | 565 / 350 |
Parts group by group on the same house
| Parts group | StepUp RingLock | StepUp Cuplock | StepUp Frame & Brace |
|---|---|---|---|
| Frames and standards | 120 | 120 | 64 |
| Ledgers and beams | 156 | 156 | – |
| Decks | 33 | 33 | 34 |
| Guardrails | 96 | 96 | 50 |
| Toeboards | 32 | 32 | 34 |
| Diagonals | 40 | 40 | 68 |
| Ends | 8 | 16 | 12 |
| Wall ties and fittings | 40 | 40 | 48 |
| Base jacks and legs | 40 | 40 | 40 |
| Bays on the long wall | 5 | 5 | 5 |
| Depth | 0.73 m | 1.22 m | 0.91 m |
| All parts | 565 | 573 | 350 |


Questions and answers
Can I mix parts from two StepUp Scaffold systems in ScaFix?
No. ScaFix plans each wall with one system’s own parts and never mixes systems in a parts list. Whether two systems of one maker may be combined on site is for StepUp Scaffold’s instructions to say. ScaFix is a planning aid, not a structural approval.
Why do the parts totals of the StepUp Scaffold systems differ?
A wall is filled with each system’s own bay lengths, so a shorter bay means more bays, standards and ledgers; the depth changes the transoms and decks, and frame systems count frames where modular systems count standards and ledgers. The totals say nothing about price or load class.