Skip to content

Stair tower

PERI UP Flex 75 stair tower

PERI UP Flex 75 stair tower: platform 2.5 × 1.5 m, heights 4.3–20.3 m, with the parts per height from the manufacturer's tables. A stair tower is anchored to the building or scaffold, as the manual requires.

By Ole Emil Frikstad Urstad · How the numbers are computed ·

Try one week – €9.90See the demo house in 3DSee ScaFix

€9.90 for 7 days. Does not renew.

PERI UP Flex 75 stair tower in the ScaFix 3D model
PERI UP Flex 75 stair tower, drawn from the manufacturer's table.

How many parts does a PERI UP Flex 75 stair tower at 8.3 m need?

At 8.3 m platform height (outdoors) on the 2.5 × 1.5 m platform, the manufacturer's table lists 186 parts, about 1,126 kg in total: Frames 25, Braces 75, Guardrails 11, Toe boards 17, Stairs 16, Castors and base 4, Other 38. The stair tower is anchored, not ballasted.

Platform heights in the manufacturer's tables

Each cell is the range of platform heights the manual has a row for, with the number of rows. ScaFix offers exactly these rows and no others.

Platform heights in the manufacturer's tables
PlatformIndoorsOutdoorsRows
2.5 × 1.5 m4.3–20.3 m (8)4.3–20.3 m (8)8 rows

Parts list: PERI UP Flex 75 at 8.3 m (outdoors)

The manufacturer's table for this row, with stabilisers and ballast weights; the part names are the manufacturer's.

Parts list: PERI UP Flex 75 at 8.3 m (outdoors)
GroupArticle no.PartQty
Frames100000Top Standard UVH 1005
Frames100009Standard UVR 20012
Frames100012Standard UVR 3004
Frames100014Base Standard UVB 244
Braces114595Ledger UH 50 Plus2
Braces114629Ledger UH 75 Plus5
Braces114632Ledger UH 100 Plus2
Braces114641Ledger UH 150 Plus33
Braces114648Ledger UH 250 Plus33
Guardrails100742Stair Guardrail UAG8
Guardrails100830Stair Guardrail UAH3
Toe boards110073Toeboard Steel UPY 1001
Toe boards110160Toeboard Steel UPY 1508
Toe boards110208Toeboard Steel UPY 2507
Toe boards110514Toeboard Steel UPY 751
Stairs111117Staircase UAS 75 x 250/200, Alu4
Stairs123771Steel Deck UDG 25 x 25012
Castors and base100411Adj. Base Plate UJB 38-50/304
Other100863Spindle Locking UJS4
Other109764UH Spigot2
Other110792Ledger to Ledger Coupler UHA Half w. Spigot2
Other110793Ledger to Ledger Coupler UHA Half14
Other111053Locking Pin Ø 48/5716

Limits that apply

  • A stair tower is anchored to the building or the scaffold. Anchorage, foundations and the connection are not in the manufacturer's parts list and are designed separately.
  • Load as the manufacturer states it: Maximum persons and calculated leg load per height: see the manufacturer's sheet
  • ScaFix lists the parts from the manufacturer's tables. It is not a structural approval: the assembly and use instructions on site govern, and a competent person inspects the tower.

Sources

The manufacturer's documents (PERI UP Flex Stair 75 compliance sheets and PERI UP Flex Stair 75 IFAU v2.0) and the standard, read on 23 October 2026.

Questions and answers

How high can a PERI UP Flex 75 stair tower go?

The manufacturer's tables run from 4.3 m to 20.3 m. ScaFix offers exactly those heights.

Is a stair tower ballasted?

No. A stair tower is anchored to the building or the scaffold; the anchorage is designed separately, as the manual says.

Does ScaFix approve the stair tower?

No. ScaFix gives the parts list from the manufacturer's tables; it is not a structural approval. Follow the assembly instructions on site.