Scaffolding Center SC 70 scaffolding around a house of 11.4 × 5.3 m with a gabled roof (eaves 4.5 m, ridge 6 m), drawn by the ScaFix 3D model
Scaffolding Center SC 70 around the example house, as ScaFix draws it in 3D.

How do the Scaffolding Center systems differ?

ScaFix has 2 Scaffolding Center systems: Scaffolding Center SC 70 and Scaffolding Center SC 73. On the same example house (11.4 m × 5.3 m), Scaffolding Center SC 73 needs 272 parts and Scaffolding Center SC 70 288. The two systems share no bay length, so their bay grids differ.

Pair by pair: bay lengths and depths

Each pair of Scaffolding Center systems, from the catalogue the engine plans with. «Only in» lists the bay lengths one system has and the other lacks; the last column is the parts total of each on the example house.

Scaffolding Center systems compared head to head
PairTypeShared bay lengthsOnly in the firstOnly in the secondShared depthsParts on the house
Scaffolding Center SC 70 – Scaffolding Center SC 73Same type: Frame–3 m, 2.5 m, 2 m, 1.5 m3.07 m, 2.57 m, 2.07 m, 1.57 m, 1.09 m, 0.73 m–288 / 272

Parts group by group on the same house

Each Scaffolding Center system planned on ScaFix’s example house (11.4 m × 5.3 m) with the default settings. The rows are the groups of the app’s parts list; «–» means the system has no part in that group. How the example is set up is on the methodology page.
Parts groupScaffolding Center SC 70Scaffolding Center SC 73
Frames and standards6060
Decks3232
Guardrails4848
Toeboards3232
Diagonals88
Ends88
Wall ties and fittings6044
Base jacks and legs4040
Bays on the long wall55
Depth0.74 m0.73 m
All parts288272

Questions and answers

Can I mix parts from two Scaffolding Center systems in ScaFix?

No. ScaFix plans each wall with one system’s own parts and never mixes systems in a parts list. Whether two systems of one maker may be combined on site is for Scaffolding Center’s instructions to say. ScaFix is a planning aid, not a structural approval.

Why do the parts totals of the Scaffolding Center systems differ?

A wall is filled with each system’s own bay lengths, so a shorter bay means more bays, standards and ledgers; the depth changes the transoms and decks, and frame systems count frames where modular systems count standards and ledgers. The totals say nothing about price or load class.