How to put netting or sheeting on the scaffold

You choose netting or sheeting in Pro Studio under Scaffold → Ties, in the Cladding field: none, Netting or tarpaulin. Cladding raises the wind load, so ScaFix tightens the tie rule automatically and shows the new rule, the number of ties per wall and the source.

ScaFix Pro See the plans and what they cost

What you need

  • ScaFix Pro
  • A project in Pro Studio with a building and scaffold.

Step by step

  1. Step 1 Open Ties

    Go to Scaffold in Pro Studio and choose Ties. The panel shows the load class, the tie schedule by lift and the walls with their number of ties. You can Download tie schedule (CSV) or Copy the table. The red chip «ties to set on site» counts ties the parts list bills that cannot be set square into the wall there (at a corner or an open end). Ties says where they go. That is why the number of ties in the model and on the parts list can differ.

    Pro Studio with Ties open: the table with lift, height, ties and position, and the explanation of how the tie schedule is calculated.
  2. Step 2 Choose the cladding

    Under Cladding choose Netting or tarpaulin. ScaFix says that «nets and tarpaulins raise the wind load, so the rule tightens automatically», shows the rule for the system and that the cladding applies to the whole building. The ties per wall and the parts list are recalculated.

    The Cladding field set to Netting, the note that nets and tarpaulins raise the wind load, and Wall 1 with its number of ties and the rule with its source.
  3. Step 3 Read the rule per wall

    Under each wall is the Rule with its source, usually the manufacturer's instructions, and which numbers are DERIVED. Check against the instructions before you order.

Common mistakes

  • Cladding added without looking at the ties. Read the new rule and the count for each wall. Where the manufacturer requires a calculation for the cladding, it says so under the rule.
  • The wrong wall chosen. The cladding applies to the whole building; the ties are listed per wall.
  • The plan used as a wind calculation. Wind load on a clad scaffold must be assessed under the manufacturer's instructions and the rules on site.