# Scaffolding rules in Belgium: the Code, the 2001 site decree and inspections

> Scaffolding rules in Belgium for planners and foreign contractors: the Code on well-being at work, the 2001 site decree, inspections, guardrails, training.

Canonical: https://scafix.app/scaffolding-guides/scaffolding-rules-belgium · Updated 2026-11-25

In Belgium, two federal texts govern scaffolds: the Code on well-being at work, mainly Book IV Title 5, and the royal decree of 25 January 2001 on temporary or mobile construction sites. Together they require a competent person, a calculation note, an assembly plan, inspections before use and after changes, and guardrails above a 2 m fall.

### What are the scaffolding rules in Belgium?

Belgian scaffolds follow two federal texts. The Code on well-being at work (Book IV Title 5) requires a competent person, a calculation note, an assembly plan, an instruction note and training; the 2001 construction-site decree requires inspection by a competent person before use, periodically, and after changes, bad weather or earth tremors.

### Before you rely on this guide

> This guide summarises published rules to help you plan and is not legal advice. It has not been reviewed by a qualified scaffold designer or engineer. ScaFix is a planning aid, not structural approval: the manufacturer's instructions, the scaffold design and a competent person's inspection decide what is built and used on site. How these guides are written, sourced and corrected: [editorial and review policy](https://scafix.app/about/editorial-and-review-policy).

### Which laws cover scaffolding in Belgium?

Two federal texts do. Book IV Title 5 of the Code on well-being at work holds the scaffold chapter, articles IV.5-7 to IV.5-15. The royal decree of 25 January 2001 on temporary or mobile construction sites adds site rules, including the scaffold inspection duty in its annex III. Both are published in Dutch and French.

Title 5 does not stand alone. The FPS says it supplements Title 2, the provisions for all work equipment, which stay applicable to equipment for temporary work at height wherever Title 5 has no specific provision ([FPS theme page](https://werk.belgie.be/nl/themas/welzijn-op-het-werk/arbeidsmiddelen/tijdelijke-werkzaamheden-op-hoogten)). The Code gathers the implementing decrees of the Well-being at Work Act of 4 August 1996, except the 2001 construction-site decree, which stands outside it ([FPS, the Code](https://werk.belgie.be/nl/themas/welzijn-op-het-werk/algemene-beginselen/codex-over-het-welzijn-op-het-werk)). A scaffold on a building site therefore answers to both.

For readers from abroad: the FPS's English pages for workers posted to Belgium say that all parties who perform work on temporary or mobile construction sites in Belgium must comply with the safety and health provisions laid down by royal decree ([FPS, construction sites](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-2)). For temporary work at height, the FPS's English page sends readers to the French and Dutch pages for the legal text ([FPS, work equipment](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-5)). Where this page quotes a decree in English, the translation is ours; where it quotes the FPS's own English, it says so.

### Who does what on a scaffold in Belgium?

The Code splits the duties between the employer who erects, dismantles or alters the scaffold and the employer who uses it; in most cases, the FPS notes, these are different firms. The erector supplies the calculation and instruction notes; the user's competent person checks that the scaffold still matches the calculation note.

- **Competent person** (art. IV.5-7): appointed by the user employer, trained to watch over the prevention of falling people and objects, the safety measures when the weather changes, and the permissible loads, and to carry out the checks of art. IV.5-13. The erector's competent person also draws up and adapts the assembly, dismantling and alteration plan.
- **Calculation note** (art. IV.5-8): the erector must have the manufacturer's instructions, accompanied by a note with a strength and stability calculation, and passes the note to the user when they are different employers.
- **Assembly plan** (art. IV.5-9): drawn up by the erector's competent person when the manufacturer's instructions contain none; a general plan, completed with details if the scaffold's complexity requires it, and kept available to the inspectors for the whole duration of the works.
- **Instruction note** (art. IV.5-10): written by the erector's competent person, with every instruction needed to cover the risks of erection, dismantling, alteration or use, and passed to the user.
- **Marking** (art. IV.5-12): parts not ready for use carry general-danger warning signs and are fenced off by physical barriers.
- **User's duties** (art. IV.5-13): the user keeps the scaffold in line with art. IV.5-11 at all times, keeps its workers off parts not ready for use, and takes on the erector's duties if it alters the scaffold.

All six points are in Book IV Title 5 ([Dutch text](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IV%20titel%205%20Arbeidsmiddelen%20voor%20tijdelijke%20werkzaamheden%20op%20hoogte.pdf), [French text](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/Code%20livre%20IV%20titre%205%20Equipements%20de%20travail%20pour%20des%20travaux%20temporaires%20en%20hauteur.pdf)). As guidance, the FPS adds that the user should describe the activities it plans in a specification («lastenboek», «cahier des charges») or an equivalent document ([FPS theme page](https://werk.belgie.be/nl/themas/welzijn-op-het-werk/arbeidsmiddelen/tijdelijke-werkzaamheden-op-hoogten)).

### How must a scaffold be built under Belgian law?

Article IV.5-11 sets the build. No part may move relative to the whole during use; the scaffold must carry its loads and resist the weather, in particular the wind; it is anchored or tied to a point of sufficient strength, or protected against slipping and overturning by equally effective means, on a firm enough bearing surface.

The same article requires decks sized for the work and the loads, with parts that cannot move in normal use; no dangerous gaps between the [deck](https://scafix.app/scaffolding-glossary/deck) edges and the building; safe accesses in sufficient number between the decks; and protection against falls and falling objects at every level during erection, dismantling, alteration and use ([Title 5, art. IV.5-11](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IV%20titel%205%20Arbeidsmiddelen%20voor%20tijdelijke%20werkzaamheden%20op%20hoogte.pdf)). Title 5 gives no figure for tie spacing or for the gap to the façade; how ties are usually set out is explained in [scaffold ties and anchoring](https://scafix.app/scaffolding-guides/scaffold-ties-and-anchoring).

Title 5 also puts collective protection before personal protection and lets it be interrupted only at the access to a ladder or a stair. Where a [guardrail](https://scafix.app/scaffolding-glossary/guardrail) must come off for a specific task, effective compensating measures come first, and the guardrail goes back when the task ends (art. IV.5-2 § 4 and § 6). Work at height is done only when the weather does not endanger the workers (art. IV.5-3).

### When must a scaffold be inspected in Belgium?

A competent person must inspect a scaffold before it is put into use, then periodically, and after any modification, period of non-use, exposure to bad weather or earth tremors, or any other circumstance that may have affected its strength or stability. That is annex III, part B, section II, point 6.c of the 2001 decree.

The Dutch text says «op gezette tijden» and the French «à des intervalles périodiques»; for the weather, «blootstelling aan weer en wind» and «exposition à des intempéries». Neither gives a number of days. Article 50 makes contractors apply annex III insofar as no specific or stricter provisions have been laid down under the Well-being at Work Act ([2001 decree, Dutch](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/KB_tijd_mob.pdf); [French](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/AR_chant_TM_8%20%282%29.pdf)).

The Code adds two layers. Under art. IV.5-13, the user's competent person verifies that the scaffold, «in all circumstances» (our translation), still matches the calculation note. Under the general work-equipment rule, art. IV.2-14, equipment whose safety depends on its installation gets an initial check after installation and before first use and after each assembly at a new site, and equipment exposed to deterioration gets periodic checks and exceptional checks after alterations, accidents, natural phenomena and long periods out of use ([Title 2](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IV%20titel%202%20Bepalingen%20van%20toepassing%20op%20alle%20arbeidsmiddelen.pdf)).

The results are recorded in writing and kept available to the inspectors, and equipment used outside the company carries material proof of its last check. The FPS's English summary of that article adds: «The employer generally determines the frequency and appoints the competent person for the inspection» ([FPS, work equipment](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-5)). Neither Title 5, art. IV.2-14 nor annex III states a number of days. What to look at on the day is in the [scaffold inspection checklist](https://scafix.app/scaffolding-guides/scaffold-inspection-checklist).

### What guardrails does a scaffold in Belgium need?

Where workers can fall more than 2 m, work and access areas need guardrails with an intermediate rail and a toeboard, solid or mesh panels, or another device of equivalent safety. The top rail sits between 1 m and 1.2 m high (Annex IX.1-2 of the Code, [FPS English summary](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-4)).

That protection may be interrupted only at the access to a ladder.

The figures below are those of Annex IX.1-2 as the [Dutch](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IX%20titel%201%20Collectieve%20beschermingsmiddelen.pdf) and [French](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/Code%20livre%20IX%20titre%201%20%C3%A9quipements%20de%20protection%20collective.pdf) texts state them and the FPS summarises them in English.

| Element | Requirement in Annex IX.1-2 |
|---|---|
| Fall height that triggers collective protection | More than 2 m |
| Top rail | 1 m to 1.2 m above the work or access area |
| Intermediate rail | 40 to 50 cm above the work or access area |
| Toeboard | At least 15 cm high |
| Solid or mesh panels | At least 1 m high |
| Lower protection allowed | 70 cm, if a wall whose height plus thickness is at least 1.3 m, or a window sill where the opening is at most 2 m wide |
| Barriers fencing off no-go areas | Must meet the guardrail rules if closer than 1.5 m to the void |

The annex applies «in application of» Book IV Title 5, in particular art. IV.5-2 § 4 and § 5 (our translation), and art. IX.1-1 says collective protection that is part of a piece of work equipment counts as work equipment ([Book IX Title 1](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IX%20titel%201%20Collectieve%20beschermingsmiddelen.pdf)). The 2001 decree asks for «sufficiently high» guardrails with a toeboard, a handrail and an intermediate rail, without a figure (annex III, part B, section II, point 5.a, our translation; [French text](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/AR_chant_TM_8%20%282%29.pdf)).

### Does a scaffold in Belgium need a calculation note?

Yes. The employer who erects it must have the manufacturer's instructions, accompanied by a note with a strength and stability calculation. If that note is not available, or the planned configuration is not covered by it, a person who can show the necessary knowledge must make the calculation, under art. IV.5-8 of the Code.

The FPS's page on the calculation note is guidance, not law. It says the legislator found it «neither necessary nor appropriate» to make standards compulsory for the use of scaffolds (our translation). For a typical configuration («standaardopbouw»), a reference to the code used can be enough; any departure from that configuration must be shown and justified explicitly ([FPS, calculation note](https://werk.belgie.be/nl/themas/welzijn-op-het-werk/arbeidsmiddelen/tijdelijke-werkzaamheden-op-hoogten/berekeningsnota)).

In practice, the FPS writes, the details of the calculation are not needed, but the decision criteria for that particular scaffold are. If the scaffold follows recognised standards or a recognised code of good practice, a reference to them, with the input data and the results, is in principle enough, and those results must appear in the execution plan ([French version](https://emploi.belgique.be/fr/themes/bien-etre-au-travail/equipements-de-travail/travaux-temporaires-en-hauteur/note-de-calcul)).

### What training does scaffold work in Belgium require?

Two kinds. The Code requires training for every worker who works on a scaffold, and further training for those who erect, dismantle or alter one, without setting hours or a certificate. The 2001 decree adds a basic safety training for temporary or mobile construction sites lasting at least eight hours ([2001 decree, art. 50bis](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/KB_tijd_mob.pdf)).

Under art. IV.5-14, the user training covers the prevention of falling people and objects, the safety measures when the weather changes, and the permissible loads; the erector training adds understanding the assembly plan, safe erection, dismantling and alteration, and any other risk of that work. Art. IV.5-15 lets only trained workers work on or build a scaffold, and they must follow the assembly plan and the instruction note ([Title 5, French](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/Code%20livre%20IV%20titre%205%20Equipements%20de%20travail%20pour%20des%20travaux%20temporaires%20en%20hauteur.pdf)).

A worker is presumed to have the basic safety training with a certificate from another course, or with at least five years of work on temporary or mobile sites within the last ten years. It is given before work starts where possible, and in any case within one month of the worker starting; art. 50sexies extends it to self-employed people and employers who work on site themselves ([2001 decree, French](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/AR_chant_TM_8%20%282%29.pdf)). The FPS's English page says it applies to all persons, employers, workers and self-employed, working on a construction site in Belgium ([FPS, construction sites](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-2)).

### Which scaffold systems have a base in Belgium?

The makers' own pages show two. Layher's Benelux site lists a branch in Kontich, Belgium ([Layher contact](https://www.layher.nl/contact)), and offers the Allround ring system and the Blitz frame system; layher.be leads to that site ([Layher Benelux](https://www.layher.nl/)). [Scafom-rux](https://scafix.app/systems/scafom-rux-super)'s Belgium page names Orion Metal BVBA in Kaulille as its contact ([Scafom-rux Belgium](https://www.scafom-rux.com/en/get-in-touch/locations-how-to-find-us/belgium)).

On a straight wall 12 m long and 9 m high in one section, ScaFix plans [Layher Allround](https://scafix.app/systems/layher-allround) in 4 bays with 4 decked levels and 114 m² of scaffold area; the [parts list](https://scafix.app/scaffold-quantities-by-wall-size) in the app with a plan holds 289 parts, including 18 wall ties.

The numbers below are ScaFix's engine output for one straight wall in one section; parts and wall ties are from the parts list in the app with a plan.

| System | Wall (length × height) | Bays | Parts in the app | Wall ties in the app | Scaffold area |
|---|---|---|---|---|---|
| Layher Allround | 12 × 9 m | 4 | 289 | 18 | 114 m² |
| Layher Allround | 15 × 10 m | 5 | 355 | 24 | 146 m² |
| [Layher Blitz](https://scafix.app/systems/layher-blitz) | 12 × 9 m | 4 | 155 | 18 | 111 m² |
| Layher Blitz | 15 × 10 m | 5 | 190 | 24 | 139 m² |

These are ScaFix planning numbers, not the calculation note of art. IV.5-8: on site, the manufacturer's instructions and the competent person decide how the scaffold is anchored and checked.

### What does this page not cover?

Only the federal scaffold rules: Book IV Titles 2 and 5 and Book IX Title 1 of the Code, and the 2001 decree's parts named above. It does not cover municipal permits for scaffolds on the public road, regional building and planning rules, other chapters of the Code or the decree, or technical standards.

The use of the public road is a municipal matter. In Ghent, for example, the city issues a permit to occupy an agreed part of the public domain for a period, and lists «steiger / stelling met of zonder onderdoorgang» (a scaffold with or without a passage underneath) among the site items it covers ([Stad Gent](https://stad.gent/nl/wonen-bouwen/vergunning-inname-publieke-ruimte/vergunning-tijdelijke-werfzone-container-steiger-werfwagen-mobiele-kraan)). Check with the municipality where the building stands.

The 2001 decree also deals with the safety and health coordinator, the safety and health plan and the post-intervention file, which the FPS's English page describes ([FPS, construction sites](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-2)); this page leaves them out.

### What does ScaFix do, and what not?

ScaFix is a planning aid: it lays out the bays, decked levels and parts of a façade scaffold for planning and ordering. It is not a structural calculation, approval, inspection or compliance check, and it replaces neither the competent person nor the text of the Code or the 2001 decree.

To size one wall first, the [scaffolding calculator](https://scafix.app/scaffolding-calculator) gives bays, lifts, decked levels and area. Across the borders, see [scaffolding rules in the Netherlands](https://scafix.app/scaffolding-guides/scaffolding-rules-netherlands) and [scaffolding rules in France](https://scafix.app/scaffolding-guides/scaffolding-rules-france); [scaffolding rules by country](https://scafix.app/scaffolding-rules-by-country) compares the rest.

### Scaffolding rules in other countries

- [Norway](https://scafix.app/scaffolding-guides/scaffolding-rules-norway)
- [Sweden](https://scafix.app/scaffolding-guides/scaffolding-rules-sweden)
- [Denmark](https://scafix.app/scaffolding-guides/scaffolding-rules-denmark)
- [Germany](https://scafix.app/scaffolding-guides/scaffolding-rules-germany)
- [Poland](https://scafix.app/scaffolding-guides/scaffolding-rules-poland)
- [Netherlands](https://scafix.app/scaffolding-guides/scaffolding-rules-netherlands)
- [France](https://scafix.app/scaffolding-guides/scaffolding-rules-france)
- [United Kingdom](https://scafix.app/scaffolding-guides/uk-scaffolding-regulations-tg20)
- [United States](https://scafix.app/scaffolding-guides/osha-scaffolding-requirements)
- [Czechia](https://scafix.app/scaffolding-guides/scaffolding-rules-czech-republic)
- [Slovakia](https://scafix.app/scaffolding-guides/scaffolding-rules-slovakia)
- [Hungary](https://scafix.app/scaffolding-guides/scaffolding-rules-hungary)
- [Scaffolding rules by country](https://scafix.app/scaffolding-rules-by-country)

### Frequently asked questions

**Does Belgian law set a fixed scaffold inspection interval?** No. The 2001 construction-site decree requires inspection by a competent person before use, «at periodic intervals» and after changes, non-use, bad weather or earth tremors, without a number of days. The FPS's English summary of the general work-equipment rule says the employer generally determines the frequency and appoints the competent person for the inspection.

**Who is the competent person on a scaffold in Belgium?** The person the user employer appoints, trained to watch over the prevention of falling people and objects, the safety measures when the weather changes and the permissible loads, and to check that the scaffold still matches its calculation note (art. IV.5-7 and IV.5-13 of the Code). The erecting employer's competent person also draws up the assembly plan.

**What guardrail height applies on scaffolds in Belgium?** A top rail between 1 m and 1.2 m above the work or access area, an intermediate rail at 40 to 50 cm and a toeboard at least 15 cm high, wherever workers could fall more than 2 m. Solid or mesh panels must be at least 1 m high. Source: Annex IX.1-2 of the Code.

**Are scaffold standards compulsory in Belgium?** No, according to the FPS's guidance on the calculation note: the legislator found it neither necessary nor appropriate to make standards compulsory for the use of scaffolds. For a standard build, a reference to the recognised standard or code of good practice used, with input data and results, is in principle enough.

**Do foreign scaffolding firms working in Belgium follow these rules?** Yes. The FPS's English pages for workers posted to Belgium say that all parties working on temporary or mobile construction sites in Belgium must comply with the safety and health provisions laid down by royal decree, and that the basic safety training of at least eight hours applies to employers, workers and self-employed persons.

### Sources

Primary sources used for this article, with the date each was read.

- [Royal decree of 25 January 2001 on temporary or mobile construction sites, FPS consolidated text (Dutch)](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/KB_tijd_mob.pdf) (read 24 November 2026)
- [Arrêté royal du 25 janvier 2001 concernant les chantiers temporaires ou mobiles, FPS consolidated text (French)](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/AR_chant_TM_8%20%282%29.pdf) (read 24 November 2026)
- [Code on well-being at work, Book IV Title 5, work equipment for temporary work at height (Dutch)](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IV%20titel%205%20Arbeidsmiddelen%20voor%20tijdelijke%20werkzaamheden%20op%20hoogte.pdf) (read 24 November 2026)
- [Code on well-being at work, Book IV Title 5 (French)](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/Code%20livre%20IV%20titre%205%20Equipements%20de%20travail%20pour%20des%20travaux%20temporaires%20en%20hauteur.pdf) (read 24 November 2026)
- [Code on well-being at work, Book IV Title 2, provisions for all work equipment (Dutch)](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IV%20titel%202%20Bepalingen%20van%20toepassing%20op%20alle%20arbeidsmiddelen.pdf) (read 24 November 2026)
- [Code on well-being at work, Book IX Title 1, collective protective equipment (Dutch)](https://werk.belgie.be/sites/default/files/content/documents/Welzijn%20op%20het%20werk/Regelgeving/Codex%20boek%20IX%20titel%201%20Collectieve%20beschermingsmiddelen.pdf) (read 24 November 2026)
- [Code on well-being at work, Book IX Title 1 (French)](https://emploi.belgique.be/sites/default/files/content/documents/Bien-%C3%AAtre%20au%20travail/R%C3%A9glementation/Code%20livre%20IX%20titre%201%20%C3%A9quipements%20de%20protection%20collective.pdf) (read 24 November 2026)
- [FPS Employment, temporary work at height (theme page, Dutch)](https://werk.belgie.be/nl/themas/welzijn-op-het-werk/arbeidsmiddelen/tijdelijke-werkzaamheden-op-hoogten) (read 24 November 2026)
- [FPS Employment, calculation note for scaffolds (guidance, Dutch)](https://werk.belgie.be/nl/themas/welzijn-op-het-werk/arbeidsmiddelen/tijdelijke-werkzaamheden-op-hoogten/berekeningsnota) (read 24 November 2026)
- [FPS Employment, calculation note for scaffolds (guidance, French)](https://emploi.belgique.be/fr/themes/bien-etre-au-travail/equipements-de-travail/travaux-temporaires-en-hauteur/note-de-calcul) (read 24 November 2026)
- [FPS Employment, the Code on well-being at work (Dutch)](https://werk.belgie.be/nl/themas/welzijn-op-het-werk/algemene-beginselen/codex-over-het-welzijn-op-het-werk) (read 24 November 2026)
- [FPS Employment, posting to Belgium: work equipment (English)](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-5) (read 24 November 2026)
- [FPS Employment, posting to Belgium: collective protective equipment (English)](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-4) (read 24 November 2026)
- [FPS Employment, posting to Belgium: temporary or mobile construction sites (English)](https://employment.belgium.be/en/themes/international/posting/working-conditions-be-respected-case-posting-belgium/well-being-2) (read 24 November 2026)
- [Layher Benelux, contact and branches](https://www.layher.nl/contact) (read 24 November 2026)
- [Layher Benelux, home page (layher.be leads here)](https://www.layher.nl/) (read 24 November 2026)
- [Scafom-rux, locations: Belgium](https://www.scafom-rux.com/en/get-in-touch/locations-how-to-find-us/belgium) (read 24 November 2026)
- [Stad Gent, permit for a temporary site zone, container, scaffold, site cabin or crane](https://stad.gent/nl/wonen-bouwen/vergunning-inname-publieke-ruimte/vergunning-tijdelijke-werfzone-container-steiger-werfwagen-mobiele-kraan) (read 24 November 2026)

### Read next

- [Scaffolding rules in Norway](https://scafix.app/scaffolding-guides/scaffolding-rules-norway)
- [Scaffolding rules in Sweden](https://scafix.app/scaffolding-guides/scaffolding-rules-sweden)
- [Scaffolding rules in Denmark](https://scafix.app/scaffolding-guides/scaffolding-rules-denmark)
- [Scaffolding rules in Germany](https://scafix.app/scaffolding-guides/scaffolding-rules-germany)
- [Scaffolding rules in Poland](https://scafix.app/scaffolding-guides/scaffolding-rules-poland)
- [UK scaffolding regulations: Work at Height, TG20 and CISRS](https://scafix.app/scaffolding-guides/uk-scaffolding-regulations-tg20)
- [Scaffold load classes and width classes explained](https://scafix.app/scaffolding-guides/scaffold-load-classes)
- [Scaffold inspection checklist](https://scafix.app/scaffolding-guides/scaffold-inspection-checklist)
- [How to plan a facade scaffold](https://scafix.app/scaffolding-guides/how-to-plan-a-facade-scaffold)
- [Scaffolding rules in the Netherlands](https://scafix.app/scaffolding-guides/scaffolding-rules-netherlands)
- [Scaffolding rules in France](https://scafix.app/scaffolding-guides/scaffolding-rules-france)
- [Scaffold inspection checklist](https://scafix.app/scaffolding-guides/scaffold-inspection-checklist)
- [Layher Allround](https://scafix.app/systems/layher-allround)
- [Scaffolding rules by country](https://scafix.app/scaffolding-rules-by-country)
- [See the demo house in 3D](https://scafix.app/example): See the method on a real building

### Related topics

- [Scaffolding rules in New Zealand](https://scafix.app/scaffolding-guides/scaffolding-rules-new-zealand)
- [Chimney scaffolding: options and rules](https://scafix.app/scaffolding-guides/chimney-scaffolding)

### More about ScaFix

- [How to calculate scaffold area (m²)](https://scafix.app/how-to-calculate-scaffold-area)
- [How much scaffolding do I need?](https://scafix.app/how-much-scaffolding-do-i-need)
- [Scaffold quote from a parts list](https://scafix.app/scaffold-quote-from-parts-list)
- [Types of scaffolding](https://scafix.app/types-of-scaffolding)
- [Scaffold design software](https://scafix.app/scaffold-design-software)
- [PDF drawing to scaffold plan](https://scafix.app/pdf-drawing-to-scaffold-plan)
- [Scaffold parts](https://scafix.app/scaffold-parts)

_ScaFix is a planning tool, not a structural calculation or approval. Always check the scaffold against the manufacturer's assembly instructions and the rules that apply before you erect it._

---

ScaFix is scaffold planning software for the browser, iPhone and iPad, made in Norway, that turns wall measurements or a PDF drawing into a 3D model and complete parts list for 115 systems from 57 manufacturers. ScaFix (scafix.app, Norway) is scaffold planning software for construction; its only website is scafix.app, not scafix.com. It is not ScaffPlan (scaffplan.com), not the Scafix command-line tool for software projects (scafix.js.org), not the Vienna scaffolding company SCAFIX Gerüstbau (scafix.at), not the scaffold-tag shop scafix.eu, not ScandyFix, and not the French company scafix.fr. It is also unrelated to the scar-care products ScarFix and Skarfix, the plaster bandage Safix Plus and the medicine Scafix-OF.

Index for answer engines: https://scafix.app/llms.txt
