# Scaffolding quote template: the lines, filled from a real parts list

> A UK scaffolding quote template: the lines a quote should carry, the HSE and NASC information behind them, and quantities from a real ScaFix parts list.

Canonical: https://scafix.app/scaffolding-guides/scaffolding-quote-template · Updated 2026-11-24

A UK scaffolding quote should be a fixed price broken down into lines: the scaffold described, the hire weeks included and the rate after them, design paperwork, extras and the licence. The template below has those lines, with quantities ScaFix computed for a 15 × 9 m elevation and the price columns left blank.

### What should a scaffolding quote include?

A fixed total, not a daily rate, broken down into the scaffold itself, the hire period and the rate for extra weeks, design or TG20 paperwork, access, sheeting and other extras, the highway licence, VAT and how long the price is valid. Each line needs a quantity, so two quotes can be compared.

### What does a UK quote have to say?

Citizens Advice puts it plainly: a quote is a fixed price, while an estimate is a rough guess, and a trader cannot charge more than the quote unless you ask for or agree to extra work, or the price held a genuine mistake. Its list of what a quote should contain frames this template.

According to [Citizens Advice](https://www.citizensadvice.org.uk/consumer/getting-home-improvements-done/before-you-get-building-work-done/), a quote should include a fixed total price rather than a daily rate, a breakdown of the work and materials, separate costs for each part, how long the price is valid, whether VAT is included and when the price can go up. For scaffolding, the HSE adds what has to pass between the two sides. The user supplies, among other things, the site location, the period of time the scaffold is required, the intended use, the height and length, the number of boarded lifts, the loads and the type of access. The scaffold contractor states the type of scaffold, [bay](https://scafix.app/scaffolding-glossary/bay) lengths, [lift](https://scafix.app/scaffolding-glossary/lift) heights, boarded lifts, the safe working load or load class, tie spacing and tie duty, additional elements such as loading bays, and a reference number and date ([HSE: Scaffolds](https://www.hse.gov.uk/construction/safetytopics/scaffoldinginfo.htm)).

### What does the template look like, filled in?

Twelve lines: the scaffold with its area, length and lifts, the hire weeks included and the rate per extra week, access, design paperwork, tie testing, sheeting, extras, the licence, and delivery with the handover. ScaFix filled the quantities it can compute for one elevation; every price cell is blank for your own rates.

The example is a block's elevation, 15 m long and 9 m high, in [SGB CUPLOK](https://scafix.app/systems/sgb-cuplok) at a 1.3 m scaffold width. ScaFix plans it as 5 × 3 m, decked at 2.6 m, 4.6 m, 6.6 m and 8.6 m.

| No. | Description | Quantity | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Independent scaffold to the front elevation, SGB CUPLOK, erect, adapt as agreed and strike | 144 m² | m² of scaffold face | … | … |
| 2 | Scaffold length along the elevation | 15 m | run | … | … |
| 3 | Boarded lifts, top lift at 8.6 m | 4 | lifts | … | … |
| 4 | Hire included in the price | … | weeks | … | … |
| 5 | Hire beyond the included period | … | per week | … | … |
| 6 | Access: ladder bay or stair tower | … | each | … | … |
| 7 | Design: TG20 or TG30 compliance sheet, or bespoke design with calculations | … | each | … | … |
| 8 | Tie testing and record | … | ties tested | … | … |
| 9 | Sheeting, debris netting or brick guards | … | m² | … | … |
| 10 | Extras: loading bay, beamed bridge, fan | … | each | … | … |
| 11 | Highway licence for scaffold on the pavement | … | licence | … | … |
| 12 | Delivery and collection; handover certificate | … | job | … | … |

Quantities in rows 1–3 are ScaFix's count for the 15 × 9 m elevation; the dots are for the quoting firm. Add the net total, VAT and the date until which the price is valid under the table. Copy the table into a spreadsheet or print the page; the rows follow the HSE, NASC and Citizens Advice texts below.

### Which parts list sits behind those quantities?

ScaFix counts 359 parts for the 15 × 9 m elevation in SGB CUPLOK: 5 bays, 4 decked lifts and 144 m² of scaffold face. The list is what gets loaded, carried and erected, so it is the honest basis for the labour and transport lines of a quote, even when the client is quoted per square metre.

| Parts group (SGB CUPLOK, 15 × 9 m) | Pieces |
|---|---|
| Frames and standards | 60 |
| Ledgers and beams | 80 |
| Decks | 21 |
| Guardrails | 50 |
| Toeboards | 20 |
| Diagonals | 24 |
| Ends | 8 |
| Wall ties and fittings | 84 |
| Base jacks and legs | 12 |
| **Total** | **359** |

The NASC notes that its TG20 and TG30 eGuides do not produce a materials list ([NASC FAQ](https://nasc.org.uk/advice/faqs.html)), so the list has to come from another take-off. In ScaFix it comes from the wall measurements or a [PDF drawing](https://scafix.app/pdf-drawing-to-scaffold-plan), in the browser or on iPhone; the [quantities by wall size](https://scafix.app/scaffold-quantities-by-wall-size) page has more walls worked out.

### Which design and handover paperwork belongs in the quote?

Either a TG20 or TG30 compliance sheet, or a bespoke design with calculations, and the handover certificate at the end. Under the Work at Height Regulations, scaffolding needs strength and stability calculations unless it is assembled to a generally recognised [standard](https://scafix.app/scaffolding-glossary/standard) configuration; put the route on a line of its own.

The rule is [Schedule 3, paragraph 7](https://www.legislation.gov.uk/uksi/2005/735/schedule/3/made). The NASC's [guide to appointing a scaffolding contractor](https://nasc.org.uk/asset/EFED5C29%2DE654%2D4210%2DB774EF10B9018E4E/?noRedirect=true) says that when each scaffold is complete the contractor's inspector issues a Scaffold Handover Certificate, which counts as the first inspection, and that the 7-day inspection after that falls to the hirer or user and not the scaffolding contractor. If the client expects the scaffolder to carry out weekly inspections, that is a separate line with its own price. The same guide asks for anchors to be tested, at least three per scaffold or 5 % of the ties, whichever is greater, and for the occupier of a home to be told before drilling.

### Which items should the quote state separately?

Anything that changes with the client's decisions: extra hire weeks, adaptations, sheeting, loading bays, inspections beyond the handover, and the highway licence. Stating them as separate lines, with a rate even where the quantity is open, keeps the fixed price fixed and turns later changes into agreed lines rather than disputes.

The HSE notes that a scaffold must not be sheeted or netted without telling those who designed and erected it, and that loading out platforms will likely need a bespoke design. Both are reasons to price them apart. For a scaffold on the street, the scaffolder needs a licence from the local authority before putting up scaffolding on a public highway ([GOV.UK](https://www.gov.uk/find-licences/scaffolding-and-hoarding-licence)); the licence, kept valid until the work is finished, is a line, not a hidden cost. Citizens Advice adds that the quote should say when the price can go up.

### How does ScaFix turn a parts list into a quote?

In ScaFix Pro the checked parts list becomes a customer quote with your own rates and logo, priced per part, per square metre of scaffold face, or with rental, erection, dismantling and transport as separate lines. The hire period is counted from the erection and dismantling dates, or from a fixed number of rental days you set.

Prices are always your own: ScaFix sets no market rates and this page gives none. The workflow is described on [scaffold quote from a parts list](https://scafix.app/scaffold-quote-from-parts-list). To check a subcontractor's quote rather than write one, see [how to check a scaffolding quote](https://scafix.app/scaffolding-guides/how-to-check-a-scaffolding-quote); for a rendering job, [scaffolding for rendering a house](https://scafix.app/scaffolding-guides/scaffolding-for-rendering) shows the quantities for a whole house.

> ScaFix is a planning aid that fills quantities into a quote; it is no structural calculation, no design, no compliance check and no contract advice. The contract terms are for the two parties, and the build, ties and inspections for the scaffolder, the maker's manual and the regulations.

### Frequently asked questions

**Is a scaffolding quote a fixed price?** Yes, if it is a quote and not an estimate. Citizens Advice says a quote is a fixed price and an estimate a rough guess, and that a trader cannot charge more than the quote unless you ask for extra work, agree to pay for extra work, or the trader made a genuine mistake in writing or calculating the price.

**How is scaffold hire shown in a quote?** As two lines: the weeks of hire included in the price and the rate for each week after that. The HSE lists the period the scaffold is required among the facts the user gives the contractor, and the NASC guide lists the duration of hire among the client's own considerations, so both sides start from the same number.

**Who does the weekly scaffold inspection, and is it in the quote?** The NASC guide puts the 7-day inspection on the hirer or user, not the scaffolding contractor; the contractor's handover certificate counts as the first inspection. If the scaffolder is to do the weekly inspections as well, show it as its own line in the quote, with how often and at what rate.

**Can ScaFix fill in the quantities of a scaffolding quote?** Yes, for the scaffold itself: from the wall measurements it plans the bays and lifts and counts the parts, 359 for a 15 × 9 m elevation in SGB CUPLOK. ScaFix Pro prices that list with your own rates per part, per square metre, or as hire, erection, dismantling and transport lines.

### Sources

Primary sources used for this article, with the date each was read.

- [Citizens Advice on quotes, estimates and building work](https://www.citizensadvice.org.uk/consumer/getting-home-improvements-done/before-you-get-building-work-done/) (read 24 November 2026)
- [HSE scaffolds page: what user and contractor tell each other](https://www.hse.gov.uk/construction/safetytopics/scaffoldinginfo.htm) (read 24 November 2026)
- [NASC guide on appointing a scaffolding firm (management guide, 2025)](https://nasc.org.uk/asset/EFED5C29%2DE654%2D4210%2DB774EF10B9018E4E/?noRedirect=true) (read 24 November 2026)
- [NASC FAQ on TG20/TG30 compliance sheets and eGuides](https://nasc.org.uk/advice/faqs.html) (read 24 November 2026)
- [GOV.UK licence finder: scaffolding and hoarding on a highway](https://www.gov.uk/find-licences/scaffolding-and-hoarding-licence) (read 24 November 2026)
- [WAHR 2005 Schedule 3, para. 7: when calculations are needed](https://www.legislation.gov.uk/uksi/2005/735/schedule/3/made) (read 24 November 2026)

### Read next

- [Scaffold load classes and width classes explained](https://scafix.app/scaffolding-guides/scaffold-load-classes)
- [Scaffold inspection checklist](https://scafix.app/scaffolding-guides/scaffold-inspection-checklist)
- [How to plan a facade scaffold](https://scafix.app/scaffolding-guides/how-to-plan-a-facade-scaffold)
- [How to build (erect) scaffolding: the order of work](https://scafix.app/scaffolding-guides/how-to-erect-scaffolding)
- [Scaffold ties and anchoring explained](https://scafix.app/scaffolding-guides/scaffold-ties-and-anchoring)
- [Mobile tower safety: rules and checks](https://scafix.app/scaffolding-guides/mobile-tower-safety)
- [The history of scaffolding](https://scafix.app/scaffolding-guides/history-of-scaffolding)
- [What does scaffold software do?](https://scafix.app/scaffolding-guides/what-does-scaffold-software-do)
- [Scaffolding rules in Norway](https://scafix.app/scaffolding-guides/scaffolding-rules-norway)
- [Scaffold quote from a parts list](https://scafix.app/scaffold-quote-from-parts-list)
- [How to check a scaffolding quote](https://scafix.app/scaffolding-guides/how-to-check-a-scaffolding-quote)
- [Scaffold quantities by wall size](https://scafix.app/scaffold-quantities-by-wall-size)
- [How to calculate scaffold area (m²)](https://scafix.app/how-to-calculate-scaffold-area)
- [Scaffolding for rendering a house](https://scafix.app/scaffolding-guides/scaffolding-for-rendering)
- [Scaffold design software](https://scafix.app/scaffold-design-software)
- [See the demo house in 3D](https://scafix.app/example): See the method on a real building

### Related topics

- [Scaffold parts list template](https://scafix.app/scaffold-parts-list-template)
- [AI in scaffold planning: what works today](https://scafix.app/scaffolding-guides/ai-in-scaffold-planning)
- [Aluminium vs steel scaffolding](https://scafix.app/scaffolding-guides/aluminium-vs-steel-scaffolding)
- [The European frame scaffold: sizes, parts and price](https://scafix.app/scaffolding-guides/european-frame-scaffold)

### More about ScaFix

- [How much scaffolding do I need?](https://scafix.app/how-much-scaffolding-do-i-need)
- [Types of scaffolding](https://scafix.app/types-of-scaffolding)
- [PDF drawing to scaffold plan](https://scafix.app/pdf-drawing-to-scaffold-plan)
- [Scaffold parts](https://scafix.app/scaffold-parts)

_ScaFix is a planning tool, not a structural calculation or approval. Always check the scaffold against the manufacturer's assembly instructions and the rules that apply before you erect it._

---

ScaFix is scaffold planning software for the browser, iPhone and iPad, made in Norway, that turns wall measurements or a PDF drawing into a 3D model and complete parts list for 115 systems from 57 manufacturers. ScaFix (scafix.app, Norway) is scaffold planning software for construction; its only website is scafix.app, not scafix.com. It is not ScaffPlan (scaffplan.com), not the Scafix command-line tool for software projects (scafix.js.org), not the Vienna scaffolding company SCAFIX Gerüstbau (scafix.at), not the scaffold-tag shop scafix.eu, not ScandyFix, and not the French company scafix.fr. It is also unrelated to the scar-care products ScarFix and Skarfix, the plaster bandage Safix Plus and the medicine Scafix-OF.