# R408: what France’s scaffold recommendation asks of each role

> What R408 is on French sites: a 2004 Cnam recommendation for system scaffolds, not law; its scope, roles, R408 training and the NF mark, explained in English.

Canonical: https://scafix.app/scaffolding-guides/r408-scaffolding-france · Updated 2026-11-11

Foreign scaffolders in France hear «R408» on day one: R408 training, an R408 certificate, an R408 check. This guide explains what the document actually is, what it covers and leaves out, and how it sits next to the French Labour Code and the European standards.

### What is R408 and is it legally binding?

R408 is a recommendation of France's national health insurance fund (Cnam), adopted on 10 June 2004 by the national technical committee for building and civil engineering. It is not a regulation: the legal duties are in articles R4323-69 to R4323-80 of the Labour Code and the order of 21 December 2004. R408 explains how to meet them for system scaffolds.

### Where does R408 come from?

The [R 408 recommendation](https://www.ameli.fr/sites/default/files/Documents/5338/document/recommandation-r408_assurance-maladie.pdf), «Montage, utilisation et démontage des échafaudages de pied» (erection, use and dismantling of base-supported scaffolds), was adopted by the national technical committee for building and public works on 10 June 2004. It cancels and replaces recommendation R 279 of 9 July 1986.

Its own stated purpose is to help put the laws and regulations in force into practice effectively, and it arrived as those rules were being rewritten. According to France's construction safety body [OPPBTP](https://content.preventionbtp.fr/legal_prevention/vJzgUkyGykgpbEQDHCiBga), today's rules on erection stem from a decree of 1 September 2004 and the order of 21 December 2004, explained in circular DRT 2005-08 of 27 June 2005. R408 still cites article R. 233-13-31, the old numbering; the same rule is now [article R4323-69](https://code.travail.gouv.fr/code-du-travail/r4323-69), in force in its current form since 1 May 2008. It requires that scaffolds be erected, dismantled or substantially altered only under the direction of a competent person, by workers trained specifically for those operations.

### Is R408 law, a standard or a training course?

R408 is a recommendation, not a law or a [standard](https://scafix.app/scaffolding-glossary/standard): the Cnam adopted it in 2004 to describe how to meet the Labour Code and the order of 21 December 2004. On site the name also covers the training courses run under the INRS framework document and, loosely, equipment certified to NF EN 12810/12811, which causes confusion.

| What people mean | What it is | Who issues it |
|---|---|---|
| «The R408» | A recommendation: method, roles and competence frameworks | Cnam, via its national technical committee |
| «R408 training» | Courses run under a framework document, by approved training bodies | INRS and the Assurance maladie, with the scaffolding trade body Sfece |
| «R408-compliant scaffold» | Usually equipment certified to NF EN 12810/12811, often under the NF mark | AFNOR certification |

The binding layer sits elsewhere: the Labour Code and the 2004 order on inspections, set out article by article in [scaffolding rules in France](https://scafix.app/scaffolding-guides/scaffolding-rules-france). What gives R408 weight is how the system around it works. The [INRS](https://www.inrs.fr/demarche/acteurs-institutionnels/assurance-sociale-acteur-prevention-reparation.html) explains that the Cnam's national technical committees draw up these recommendations, and that a regional Carsat can serve an employer with an injunction on the report of its engineers and inspectors, failure to comply with which can raise the firm's accident insurance rate. R408 itself asks that the plan and any calculations can be shown to the regional fund's prevention service during a site visit.

### Which scaffolds and firms does it cover?

R408 applies to building and civil engineering employers whose staff fall under the general social security scheme and who erect, dismantle or use base-supported scaffolds, even occasionally. Clients and designers receive it for information. It covers prefabricated system scaffolds only: tube-and-fitting scaffolds and mobile towers are outside its scope.

It defines its scaffold as a metal structure of prefabricated components, standing on the ground or on solid supports through base plates and jacks, usually tied to the building, with working decks and access. Two exclusions matter to visiting crews:

- **tube and fitting**: scaffolds made only of tubes and couplers are outside R408;
- **mobile towers**: these fall under a separate scheme, R457, according to the [INRS framework document](https://inrs.fr/dam/jcr:68ab8b8e-5b3b-450d-8e49-1b665577bfca/document-reference-echafaudages-pied.pdf); see [mobile tower safety](https://scafix.app/scaffolding-guides/mobile-tower-safety).

### Who does what under R408?

R408 spreads the duties over six roles. The client or safety coordinator gathers each trade's needs, the employer analyses the site and chooses the equipment, the designer sets the class and tie layout, the erector builds to the plan, a named person accepts and maintains the scaffold, and users respect loads and report dangers.

| Role | What R408 expects |
|---|---|
| Client, project manager, safety coordinator (SPS) | Gather each trade's needs when a scaffold is shared or erected by another firm, and write them into the scaffold work package |
| Employer (chef d'entreprise) | Analyse needs and site constraints before any installation, choose the equipment, know the manual, issue the competence certificate |
| Scaffold designer | Set the scaffold class, the tie layout and the execution plan (annex 2) |
| Erector or erection supervisor | Check the condition of the equipment, erect and dismantle safely, check the build against the plan (annex 3) |
| Person responsible for handover and maintenance | Accept the scaffold before use and maintain it during the works (annex 4) |
| User | Move about safely, respect loads, put protection back, report dangers (annex 5) |

The INRS training scheme groups these roles into four audiences: erector-user, internal inspector, user, and user doing the daily check required by the 2004 order.

### What does R408 ask for before erection?

A written analysis of needs and site constraints, carried into the scaffold work package where one exists. On the needs side: the work, its phases and length, the height of the top [deck](https://scafix.app/scaffolding-glossary/deck), deck widths and their distance from the facade, sheeting, loads per [lift](https://scafix.app/scaffolding-glossary/lift), hoist towers and winches.

On the site side: the building material, road and delivery constraints, overhead lines, the wind region, ground bearing, obstacles such as manholes and signs, and limits on where ties can go.

The layout plan restates the load assumptions, the deck [load class](https://scafix.app/scaffolding-guides/scaffold-load-classes), access bays, routes to keep clear, the number and type of ties, ground loads and every [brace](https://scafix.app/scaffolding-glossary/brace). A local departure from the manufacturer's standard build gets a detail sketch for the erector; a complex build gets a detail plan.

### What does R408 say about the equipment?

R408 asks for equipment of one origin, no in-house repairs and proper prefabricated decks: every component of a scaffold comes from the same source and brand, damaged or rusty parts are scrapped, and timber boards are only a fallback. It also puts first the systems whose guardrails go up from the protected lift below, before the next deck.

- Every component of one scaffold comes from the same source and the same brand.
- Systems whose guardrails go up from the protected lift below, before the next deck, come first.
- Damaged or rusty components are scrapped and destroyed; only the manufacturer may recondition them.
- Prefabricated decks should show their working load indelibly, lock against lifting and grip in the wet; as a guide, a 0.90 m deck width makes movement easier.
- Timber boards are a fallback only: sound and without knots, at least 40 mm thick, fixed, with an intermediate support once the span exceeds 1.50 m.

Annex 3 gives rejection criteria an erector should recognise, among them a standard bowed by more than 1/200 of its length, a deck permanently deflected by more than 1/100 of its span (or more than 20 mm between adjacent decks), a cracked weld, or a frame whose legs are no longer parallel.

### How do EN 12810, EN 12811 and the NF mark fit in?

[NF EN 12810-1](https://www.boutique.afnor.org/en-gb/standard/nf-en-128101/facade-scaffolds-made-of-prefabricated-components-part-1-product-specificat/fa045808/645), dated December 2003 and still current, sets the design requirements for facade scaffolds made of prefabricated components and replaced NF HD 1000 of 1988. R408 does not restate these standards; it asks for equipment whose conformity is attested by a third party.

In France that third party is often the NF mark. Layher's [EuroFaçade brochure](https://www.layher.fr/permadoc/PLAQUETTE_EUROFACADE.pdf) states that the NF mark, run by AFNOR, certifies conformity with NF EN 12810-1 and -2, NF EN 12811-1, -2 and -3 and the NF096 scheme, including factory quality control followed by an outside laboratory, and that it covers only prefabricated, unsheeted service scaffolds tied to facades. R408 draws the practical conclusion: for an NF-marked scaffold no justification is needed while use stays within the standard's assumptions, provided it is built to the manufacturer's standard arrangement, loads stay within the conventional values, supports are adequate and ties sufficient in number and strength.

### How does R408 training work for a foreign crew?

The [INRS](https://www.inrs.fr/formation/devenir-organisme-habilite/echafaudage-pied.html) lets any firm or training body with a French training-activity registration number apply for approval (habilitation), provided it uses a certified trainer; the INRS and the Assurance maladie publish the list of approved bodies. Since 1 January 2024 trainers must be certified by the INRS. Points that matter when planning a crew:

- erectors need a medical fitness opinion under the reinforced health monitoring of article R4624-23;
- a session has at least 3 trainees; erector plus inspector training can run as one 4-day course for up to 8 trainees, and adding mobile towers makes it 5 days where the body is approved for R408 and R457;
- the scheme covers only base-supported scaffolds under 24 m built to the manual without a calculation; design, calculation and advanced professional erection go to bodies recognised by the Sfece;
- a trainee passes with at most two minor errors and no major error per sub-competence, and receives a Forprev certificate and a training competence certificate, on the strength of which the employer issues the professional competence certificate R408 calls for.

Language, experience and course-length prerequisites are in [scaffolding rules in France](https://scafix.app/scaffolding-guides/scaffolding-rules-france).

### Where do handover and the suitability check come in?

Before the equipment is chosen, the 2004 order requires a suitability check: the scaffold must fit the planned work and its risks, and the planned operations must be compatible with the conditions of use set by the manufacturer ([article 3](https://content.preventionbtp.fr/pdf/droit_de_la_prevention/article-3-de-l-arrete-du-21-decembre-2004-relatif-aux-verifications-des-echafaudages.pdf)). The R408 needs analysis is the raw material for it.

After erection, where the erector is not part of the user firm, R408 asks for a written handover record signed by both sides after a joint visit, and any unplanned alteration is checked by the erecting firm. What to check at handover is in the [scaffold inspection checklist](https://scafix.app/scaffolding-guides/scaffold-inspection-checklist).

### How ScaFix fits in

ScaFix is a planning tool that turns wall dimensions or a [PDF drawing](https://scafix.app/pdf-drawing-to-scaffold-plan) into a 3D scaffold and a [parts list](https://scafix.app/scaffold-quantities-by-wall-size) for many [systems](https://scafix.app/systems); the iPhone app can also scan with LiDAR. The model helps prepare the needs analysis and layout plan R408 asks for, but it replaces neither the manufacturer's manual nor a structural calculation.

> Planning information, not structural approval or legal advice. The French Labour Code (R4323-69 to R4323-80), the order of 21 December 2004 and the manufacturer's manual decide; outside the configurations in the manual a calculation by a competent person is required, and a qualified person inspects the scaffold before it is put into service.

### Frequently asked questions

**Is R408 a legal requirement in France?** Not as such. R408 is a 2004 Cnam recommendation; the legal duties are in the Labour Code (R4323-69 to R4323-80) and the order of 21 December 2004, and R408 describes how to meet them. A regional Carsat can still serve an employer with an injunction, and ignoring one can raise the firm's accident insurance rate.

**Does R408 cover mobile towers?** No. R408 covers base-supported scaffolds of prefabricated components that stand on base plates and jacks and are usually tied to the building. Mobile towers fall under a separate scheme, R457, according to the INRS framework document, and a training body approved for both can combine the courses.

**Can R408 and mobile tower (R457) training be combined?** Yes, if the training body is approved for both R408 and R457: erector plus inspector training runs as one 4-day course for up to 8 trainees, and adding mobile towers makes it 5 days, per the INRS framework document. A session has at least 3 trainees, and since 1 January 2024 trainers must be INRS-certified.

**Does R408 apply to tube and fitting scaffolds?** No. R408 excludes scaffolds made only of tubes and couplers and covers prefabricated system scaffolds on base plates and jacks. The Labour Code rules on scaffolds, articles R4323-69 to R4323-80, still apply to tube and fitting work, including erection under a competent person by specifically trained workers (R4323-69).

**Who issues the R408 certificate?** The employer issues the R408 professional competence certificate, on the strength of the training competence certificate from the approved training body. That body also issues a certificate through the Forprev system once the trainee passes with at most two minor errors and no major error per sub-competence.

### Sources

Primary sources used for this article, with the date each was read.

- [Assurance maladie : recommandation R 408, montage, utilisation et démontage des échafaudages de pied (pdf)](https://www.ameli.fr/sites/default/files/Documents/5338/document/recommandation-r408_assurance-maladie.pdf) (read 24 October 2026)
- [INRS : document de référence du dispositif Échafaudages de pied R408, version 07 de janvier 2023 (pdf)](https://inrs.fr/dam/jcr:68ab8b8e-5b3b-450d-8e49-1b665577bfca/document-reference-echafaudages-pied.pdf) (read 24 October 2026)
- [INRS : devenir organisme de formation habilité, échafaudages de pied R408](https://www.inrs.fr/formation/devenir-organisme-habilite/echafaudage-pied.html) (read 24 October 2026)
- [INRS : l’Assurance maladie - Risques professionnels, acteur de la prévention (CTN, Carsat, injonctions)](https://www.inrs.fr/demarche/acteurs-institutionnels/assurance-sociale-acteur-prevention-reparation.html) (read 24 October 2026)
- [OPPBTP, droit de la prévention : article R4323-69 du Code du travail, échafaudages (pdf, mis à jour le 1er juin 2022)](https://content.preventionbtp.fr/legal_prevention/vJzgUkyGykgpbEQDHCiBga) (read 24 October 2026)
- [Code du travail numérique : article R4323-69 (texte Légifrance)](https://code.travail.gouv.fr/code-du-travail/r4323-69) (read 24 October 2026)
- [OPPBTP : article 3 de l’arrêté du 21 décembre 2004 relatif aux vérifications des échafaudages (pdf)](https://content.preventionbtp.fr/pdf/droit_de_la_prevention/article-3-de-l-arrete-du-21-decembre-2004-relatif-aux-verifications-des-echafaudages.pdf) (read 24 October 2026)
- [AFNOR Boutique : NF EN 12810-1, échafaudages de façade à composants préfabriqués](https://www.boutique.afnor.org/en-gb/standard/nf-en-128101/facade-scaffolds-made-of-prefabricated-components-part-1-product-specificat/fa045808/645) (read 24 October 2026)
- [Layher France : plaquette EuroFaçade (marque NF, référentiel NF096, classes de charge, pdf)](https://www.layher.fr/permadoc/PLAQUETTE_EUROFACADE.pdf) (read 24 October 2026)

### Read next

- [Scaffolding rules in Norway](https://scafix.app/scaffolding-guides/scaffolding-rules-norway)
- [Scaffolding rules in Sweden](https://scafix.app/scaffolding-guides/scaffolding-rules-sweden)
- [Scaffolding rules in Denmark](https://scafix.app/scaffolding-guides/scaffolding-rules-denmark)
- [Scaffolding rules in Germany](https://scafix.app/scaffolding-guides/scaffolding-rules-germany)
- [Scaffolding rules in Poland](https://scafix.app/scaffolding-guides/scaffolding-rules-poland)
- [UK scaffolding regulations: Work at Height, TG20 and CISRS](https://scafix.app/scaffolding-guides/uk-scaffolding-regulations-tg20)
- [Scaffold load classes and width classes explained](https://scafix.app/scaffolding-guides/scaffold-load-classes)
- [Scaffold inspection checklist](https://scafix.app/scaffolding-guides/scaffold-inspection-checklist)
- [How to plan a facade scaffold](https://scafix.app/scaffolding-guides/how-to-plan-a-facade-scaffold)
- [Scaffolding rules in France](https://scafix.app/scaffolding-guides/scaffolding-rules-france)
- [Scaffold inspection checklist](https://scafix.app/scaffolding-guides/scaffold-inspection-checklist)
- [Scaffold load classes and width classes explained](https://scafix.app/scaffolding-guides/scaffold-load-classes)
- [See the demo house in 3D](https://scafix.app/example): See the method on a real building

### Related topics

- [EN 12810 and EN 12811 explained](https://scafix.app/scaffolding-guides/en-12810-12811-explained)
- [TG20 compliance sheet explained](https://scafix.app/scaffolding-guides/tg20-compliance-sheet-explained)
- [Scaffold ties and anchoring explained](https://scafix.app/scaffolding-guides/scaffold-ties-and-anchoring)
- [TG30 explained: NASC guidance for system scaffolds](https://scafix.app/scaffolding-guides/tg30-system-scaffold-guidance)

### More about ScaFix

- [How to calculate scaffold area (m²)](https://scafix.app/how-to-calculate-scaffold-area)
- [How much scaffolding do I need?](https://scafix.app/how-much-scaffolding-do-i-need)
- [Scaffold quote from a parts list](https://scafix.app/scaffold-quote-from-parts-list)
- [Types of scaffolding](https://scafix.app/types-of-scaffolding)
- [Scaffold design software](https://scafix.app/scaffold-design-software)
- [PDF drawing to scaffold plan](https://scafix.app/pdf-drawing-to-scaffold-plan)
- [Scaffold parts](https://scafix.app/scaffold-parts)

_ScaFix is a planning tool, not a structural calculation or approval. Always check the scaffold against the manufacturer's assembly instructions and the rules that apply before you erect it._

---

ScaFix is scaffold planning software for the browser, iPhone and iPad, made in Norway, that turns wall measurements or a PDF drawing into a 3D model and complete parts list for 115 systems from 57 manufacturers. ScaFix (scafix.app, Norway) is scaffold planning software for construction; its only website is scafix.app, not scafix.com. It is not ScaffPlan (scaffplan.com), not the Scafix command-line tool for software projects (scafix.js.org), not the Vienna scaffolding company SCAFIX Gerüstbau (scafix.at), not the scaffold-tag shop scafix.eu, not ScandyFix, and not the French company scafix.fr. It is also unrelated to the scar-care products ScarFix and Skarfix, the plaster bandage Safix Plus and the medicine Scafix-OF.