# Scaffolding glossary

> What bay, lift, standard, ledger, deck, toe board, base jack and wall tie mean, with each term in 14 languages. A scaffolding glossary by ScaFix.

Canonical: https://scafix.app/scaffolding-glossary · Updated 2026-11-12

The words scaffolders and planners use, explained in one or two sentences, with the same term in Norwegian, German, Dutch, Polish, Czech, Slovak, Hungarian, Danish, Swedish, Finnish, French, Spanish and Japanese.

### What do scaffolding terms mean?

This glossary explains 29 scaffolding terms as ScaFix uses them in its 3D model and parts list, from standards, ledgers and decks to guardrails, toe boards, braces, base jacks and wall ties. Each term also gives the same word in 13 other languages, and 10 parts have their own page with counts from the engine.

### Terms

- **scaffold**: A temporary structure of standards, ledgers and decks that gives safe working platforms along a building. (nb: stillas; de: Gerüst; nl: steiger; pl: rusztowanie; cs: lešení; sk: lešenie; hu: állvány; da: stillads; sv: ställning (byggnadsställning); fi: teline; fr: échafaudage; es: andamio; ja: 足場)
- **facade scaffold**: Scaffold erected along a building's facade with working platforms at every level; the usual scaffold on houses. (nb: fasadestillas; de: Fassadengerüst; nl: gevelsteiger; pl: rusztowanie elewacyjne; cs: fasádní lešení; sk: fasádne lešenie; hu: homlokzati állvány; da: facadestillads; sv: fasadställning; fi: julkisivuteline; fr: échafaudage de façade; es: andamio de fachada; ja: 外部足場)
- **frame scaffold**: Facade scaffold built from prefabricated vertical frames joined by decks and braces; quick to erect, with fixed bay lengths. (nb: rammestillas; de: Rahmengerüst; nl: framesteiger (gevelsteiger met frames); pl: rusztowanie ramowe; cs: rámové lešení; sk: rámové lešenie; hu: keretes állvány; da: rammestillads; sv: ramställning; fi: kehysteline; fr: échafaudage à cadres; es: andamio de marcos (andamio tubular); ja: 枠組足場)
- **modular scaffold**: Scaffold built from separate standards, ledgers and transoms joined at nodes (rosettes or wedge cups), so it can follow almost any shape. (nb: modulstillas; de: Modulgerüst; nl: modulaire steiger (systeemsteiger); pl: rusztowanie modułowe; cs: modulové lešení; sk: modulové lešenie; hu: moduláris állvány; da: modulstillads (systemstillads); sv: modulställning (systemställning); fi: moduuliteline (järjestelmäteline); fr: échafaudage multidirectionnel; es: andamio multidireccional; ja: システム足場)
- **wedge connection**: A joint where a ledger head is locked to the standard by driving in a wedge, without loose bolts or couplers. (nb: kilelås; de: Keilverbindung; nl: wigverbinding; pl: połączenie klinowe; cs: klínový spoj; sk: klinový spoj; hu: ékes kötés; da: kilesamling; sv: kilförband; fi: kiilaliitos; fr: assemblage à clavette; es: unión de cuña; ja: くさび緊結)
- **rosette**: A perforated disc welded to a modular standard at regular heights (usually every 0.5 m); ledgers and braces are wedged to it. (nb: rosett; de: Rosette (Lochscheibe); nl: rozet; pl: rozeta; cs: rozeta; sk: rozeta; hu: rozetta; da: roset; sv: rosett; fi: ruusuke; fr: rosace; es: roseta; ja: ディスク（ロゼット）)
- **bay**: The space between two pairs of standards along the wall; its length is the system's bay length, for example 3.07 m or 2.57 m. (nb: fag; de: Gerüstfeld (Feld); nl: vak (steigervak); pl: przęsło; cs: pole; sk: pole; hu: állványmező (mező); da: fag; sv: fack; fi: kenttä; fr: travée; es: módulo (tramo); ja: スパン)
- **lift**: One storey of the scaffold, usually about 2 m high; a lift with a deck is a working level. (nb: etasje; de: Gerüstlage (Lage); nl: niveau (steigerlaag); pl: poziom; cs: patro; sk: podlažie; hu: szint; da: etage; sv: våning (bomlag); fi: kerros; fr: niveau; es: nivel; ja: 段（層）)
- **standard**: A vertical tube that carries the scaffold's load down to the ground; in a frame scaffold the standards are part of the frames. (nb: spir; de: Vertikalstiel (Ständer); nl: staander; pl: stojak (pion); cs: stojka; sk: stojka; hu: függőleges elem (oszlop); da: spir; sv: spira; fi: pystyputki; fr: montant (poteau); es: montante (vertical); ja: 支柱（建地）)
- **frame**: A prefabricated vertical element of two standards with welded crossbars, the main part of a frame scaffold. (nb: bukk; de: Vertikalrahmen; nl: frame (staanderframe); pl: rama; cs: rám; sk: rám; hu: keret; da: ramme; sv: ram; fi: kehys; fr: cadre; es: marco; ja: 建枠)
- **ledger**: A horizontal member along the wall that joins two standards and carries decks or guardrails. (nb: bjelke; de: Riegel (Längsriegel); nl: ligger; pl: rygiel; cs: podélník; sk: pozdĺžnik; hu: hossztartó (vízszintes elem); da: bjælke (længdebjælke); sv: liggare; fi: vaakaputki (juoksu); fr: lisse; es: larguero; ja: 水平材（布）)
- **deck**: The working platform laid on a lift between the ledgers or frames, in steel, aluminium or timber. (nb: lem / plattform; de: Belag; nl: werkvloer (vloerdeel); pl: pomost; cs: podlaha (podlážka); sk: podlaha (podlahový diel); hu: járószint (padozat); da: dæk (stilladsdæk); sv: plattform (ställningsplank); fi: työtaso; fr: plancher (plateau); es: plataforma; ja: 踏板（床材）)
- **guardrail**: Rails at about 1 m and 0.5 m above the deck on the open side, so nobody falls off the platform. (nb: rekkverk; de: Geländer (Seitenschutz); nl: leuning; pl: poręcz (bariera); cs: zábradlí; sk: zábradlie; hu: korlát; da: rækværk; sv: räcke (skyddsräcke); fi: kaide; fr: garde-corps; es: barandilla; ja: 手すり)
- **toe board**: A board along the edge of the deck that stops tools and material from sliding off. (nb: fotlist; de: Bordbrett; nl: kantplank; pl: krawężnik; cs: okopová lišta (zarážka); sk: zarážka (okopová lišta); hu: lábdeszka; da: fodliste; sv: sparklist (fotlist); fi: jalkalista; fr: plinthe; es: rodapié; ja: 幅木)
- **brace**: A diagonal member that stiffens the scaffold along the wall so it does not sway. (nb: diagonal; de: Diagonale; nl: diagonaal (schoor); pl: stężenie (diagonala); cs: diagonála; sk: diagonála; hu: átló (merevítő); da: diagonal; sv: diagonalstag; fi: vinotuki (diagonaali); fr: diagonale; es: diagonal; ja: 筋かい)
- **base jack**: An adjustable screw jack under each standard that levels the scaffold on the ground or on a base plate. (nb: bunnskrue; de: Fußspindel; nl: voetspindel; pl: podstawka śrubowa; cs: stavěcí patka; sk: nastaviteľná pätka; hu: állítható talp (talpcsavar); da: bundskrue (fodspindel); sv: bottenskruv (fotspindel); fi: säätöjalka; fr: vérin de pied (socle réglable); es: husillo de base; ja: ジャッキベース)
- **wall tie**: An anchor that ties the scaffold to the building so it cannot tip over; the number follows the system's tie rule. (nb: veggfeste / vegganker; de: Gerüsthalter (Verankerung); nl: muuranker (steigeranker); pl: kotwa (zakotwienie); cs: kotva (kotvení); sk: kotva (kotvenie); hu: falhorgony (lehorgonyzás); da: vægbinder (forankring); sv: förankring; fi: seinäankkuri (ankkurointi); fr: ancrage (amarrage); es: anclaje a pared; ja: 壁つなぎ)
- **tie schedule**: A plan of how many wall ties go where on each facade, based on the manufacturer's assembly instructions. (nb: forankringsplan; de: Verankerungsplan; nl: ankerplan; pl: plan kotwienia; cs: plán kotvení; sk: plán kotvenia; hu: lehorgonyzási terv; da: forankringsplan; sv: förankringsplan; fi: ankkurointisuunnitelma; fr: plan d'ancrage; es: plan de anclajes; ja: 壁つなぎの配置図)
- **stair tower**: A scaffold bay with stair flights between the lifts that gives safe access to every working level. (nb: trappetårn; de: Treppenturm; nl: traptoren; pl: wieża schodowa; cs: schodišťová věž; sk: schodisková veža; hu: lépcsőtorony; da: trappetårn; sv: trapptorn; fi: porrastorni; fr: tour d'escalier; es: torre de escalera; ja: 昇降階段)
- **ladder access**: Access between lifts through a hatch deck with a built-in or separate ladder. (nb: stige; de: Leitergang (Leiter); nl: ladder; pl: drabina; cs: žebřík; sk: rebrík; hu: létra; da: stige; sv: stege (luckplattform); fi: tikkaat; fr: échelle; es: acceso por escalera de mano; ja: はしごによる昇降)
- **gable**: The triangular wall under a pitched roof; scaffold on a gable wall follows the slope up towards the ridge. (nb: gavl; de: Giebel; nl: puntgevel; pl: szczyt (ściana szczytowa); cs: štít; sk: štít; hu: oromfal; da: gavl; sv: gavel; fi: pääty; fr: pignon; es: hastial; ja: 妻面)
- **eaves**: The lower edge of the roof; the top deck of a facade scaffold usually sits just below the eaves. (nb: gesims; de: Traufe; nl: goot (goothoogte); pl: okap; cs: okap; sk: odkvap; hu: eresz; da: tagfod; sv: takfot; fi: räystäs; fr: égout (bas de toit); es: alero; ja: 軒（のき）)
- **ridge**: The highest line of a pitched roof, where the two roof slopes meet. (nb: møne; de: First; nl: nok; pl: kalenica; cs: hřeben; sk: hrebeň; hu: gerinc; da: kip; sv: nock; fi: harja; fr: faîtage; es: cumbrera; ja: 棟（むね）)
- **roof edge protection**: Guardrail on the scaffold above the eaves that catches people and material sliding off the roof. (nb: takfotsikring; de: Dachfangschutz; nl: dakrandbeveiliging; pl: zabezpieczenie krawędzi dachu; cs: ochrana okraje střechy; sk: ochrana okraja strechy; hu: tetőperem-védelem; da: tagfodssikring; sv: takfotsskydd; fi: räystässuoja; fr: protection de rive de toiture; es: protección de borde de tejado; ja: 軒先の墜落防止設備)
- **parts list**: The list of every scaffold component and its count for one job, used for ordering, loading and checking. (nb: deleliste; de: Materialliste (Stückliste); nl: materiaallijst (onderdelenlijst); pl: zestawienie materiałów (lista elementów); cs: výkaz materiálu (seznam dílů); sk: výkaz materiálu (zoznam dielov); hu: anyaglista; da: materialeliste; sv: materiallista; fi: osaluettelo (materiaaliluettelo); fr: liste de matériel; es: lista de piezas; ja: 部材リスト)
- **parts inventory**: The scaffold material a company has in stock, checked against the parts list of a job. (nb: delelager; de: Materialbestand (Lager); nl: voorraad; pl: magazyn (stan magazynowy); cs: sklad (skladové zásoby); sk: sklad (skladové zásoby); hu: raktárkészlet; da: lager (delelager); sv: materiallager; fi: varasto; fr: stock (inventaire); es: inventario de piezas; ja: 部材の在庫)
- **scaffold calculator**: A tool that turns wall measurements into bays, lifts and a parts list for a chosen scaffold system. (nb: stillaskalkulator; de: Gerüstrechner; nl: steigercalculator; pl: kalkulator rusztowań; cs: kalkulačka lešení; sk: kalkulačka lešenia; hu: állvány kalkulátor; da: stilladsberegner; sv: ställningskalkylator; fi: telinelaskuri; fr: calculateur d'échafaudage; es: calculadora de andamios; ja: 足場計算ツール)
- **scaffold design software**: Software for planning scaffolds in 2D or 3D, with parts lists and drawings. (nb: stillasprogram; de: Gerüstplanungssoftware; nl: steigersoftware; pl: program do projektowania rusztowań; cs: program pro plánování lešení; sk: program na plánovanie lešenia; hu: állványtervező program; da: stilladsprogram; sv: ställningsprogram; fi: telinesuunnitteluohjelma; fr: logiciel d'échafaudage; es: programa de andamios; ja: 足場計画ソフト)
- **load class**: The class of a scaffold by the load its decks may carry (classes 1 to 6 in EN 12811-1); it limits the bay length and the use. (nb: lastklasse; de: Lastklasse; nl: belastingklasse; pl: klasa obciążenia; cs: třída zatížení; sk: trieda zaťaženia; hu: terhelési osztály; da: lastklasse; sv: lastklass; fi: kuormaluokka; fr: classe de charge; es: clase de carga; ja: 荷重区分)

### Scaffold parts in 14 languages

- [Scaffold parts in 14 languages](https://scafix.app/scaffolding-glossary/multilingual)

### Questions and answers

**What is the difference between a frame scaffold and a modular scaffold?** A frame scaffold is built from prefabricated frames and is quick on straight facades. A modular scaffold is built from separate standards, ledgers and braces joined at rosettes or wedge cups, so it can follow any shape. Each frame is two standards with welded crossbars, which is why a frame scaffold has fixed bay lengths.

### Sources

ScaFix plans each scaffold system from the documents that system's page names (the manufacturer's manual or approval, where one is on file); the rules come from EN 12811-1 and the national authority. Read 10 November 2026. The documents, not this page, decide how the scaffold is built: ScaFix plans, it does not approve.

- https://www.boutique.afnor.org/en-gb/standard/nf-en-128111/temporary-works-equipment-part-1-scaffolds-performance-requirements-and-gen/fa045810/23463
- https://www.hse.gov.uk/construction/safetytopics/scaffoldinginfo.htm
- https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.451

### How to do it in ScaFix

- [How to choose bay lengths, short bays and the scaffold depth](https://scafix.app/help/bay-lengths-and-widths)
- [Help and guides](https://scafix.app/help)

### All pages in this section

- [Base jack](https://scafix.app/scaffolding-glossary/base-jack)
- [Bay](https://scafix.app/scaffolding-glossary/bay)
- [Brace](https://scafix.app/scaffolding-glossary/brace)
- [Deck](https://scafix.app/scaffolding-glossary/deck)
- [Guardrail](https://scafix.app/scaffolding-glossary/guardrail)
- [Ledger](https://scafix.app/scaffolding-glossary/ledger)
- [Lift](https://scafix.app/scaffolding-glossary/lift)
- [Standard](https://scafix.app/scaffolding-glossary/standard)
- [Toe board](https://scafix.app/scaffolding-glossary/toe-board)
- [Wall tie](https://scafix.app/scaffolding-glossary/wall-tie)

### More about ScaFix

- [Scaffold design software](https://scafix.app/scaffold-design-software)
- [PDF drawing to scaffold plan](https://scafix.app/pdf-drawing-to-scaffold-plan)
- [How much scaffolding do I need?](https://scafix.app/how-much-scaffolding-do-i-need)
- [Scaffold quantities by wall size](https://scafix.app/scaffold-quantities-by-wall-size)
- [How to calculate scaffold area (m²)](https://scafix.app/how-to-calculate-scaffold-area)
- [Scaffold parts](https://scafix.app/scaffold-parts)
- [Types of scaffolding](https://scafix.app/types-of-scaffolding)
- [Scaffold software compared](https://scafix.app/best-scaffold-software)
- [Scaffold quote from a parts list](https://scafix.app/scaffold-quote-from-parts-list)
- [Scaffold packages](https://scafix.app/scaffold-package)
- [Scaffolding inventory software and ScaFix](https://scafix.app/scaffold-inventory-and-erp)
- [ScaFix for teams](https://scafix.app/scaffolding-software-for-teams)
- [3D example](https://scafix.app/example)

_ScaFix is a planning tool, not a structural calculation or approval. Always check the scaffold against the manufacturer's assembly instructions and the rules that apply before you erect it._

---

ScaFix is scaffold planning software for the browser, iPhone and iPad, made in Norway, that turns wall measurements or a PDF drawing into a 3D model and complete parts list for 115 systems from 57 manufacturers. ScaFix (scafix.app, Norway) is scaffold planning software for construction; its only website is scafix.app, not scafix.com. It is not ScaffPlan (scaffplan.com), not the Scafix command-line tool for software projects (scafix.js.org), not the Vienna scaffolding company SCAFIX Gerüstbau (scafix.at), not the scaffold-tag shop scafix.eu, not ScandyFix, and not the French company scafix.fr. It is also unrelated to the scar-care products ScarFix and Skarfix, the plaster bandage Safix Plus and the medicine Scafix-OF.

Index for answer engines: https://scafix.app/llms.txt